Council Guides

Tree Preservation Order registers and how to check them

7 min readBy PlanScope Editorial Team

Checking a TPO needs the order and its sealed map, not just the council's GIS layer. Individual, group, woodland and area classifications each behave differently, and the exemptions are riskier than they read.

To check a Tree Preservation Order you need two documents, not one: the order itself and the map that goes with it. Every local planning authority has to keep copies of its orders available for public inspection free of charge under the Town and Country Planning (Tree Preservation) (England) Regulations 2012, and most publish a searchable map online. The map tells you whether a tree is covered. The order tells you how.

Get both before instructing a contractor, because the designation type changes what you can and cannot do without consent.

Where the registers are published

Start with the council's own planning constraints map. Most authorities carry a layer for Tree Preservation Orders, usually alongside conservation areas and listed buildings, and clicking a tree or a polygon returns the order reference and date.

The national dataset at planning.data.gov.uk holds tree preservation order and tree preservation zone data where councils have published it. Coverage is partial and depends on the authority, so a negative result there means nothing on its own. Use it to cross-check a positive result rather than to clear a site.

Where the online map is ambiguous, or the tree sits on a boundary between two polygons, ask the tree officer for a copy of the order and the sealed map. Authorities are obliged to make them available, and the sealed map is the legal record. A GIS layer is a convenience copy and occasionally wrong by a few metres, which matters when the tree in question is the one on the line.

Reading an order and its schedule

The order follows a standard form set out in the 2012 Regulations. It names the authority, carries a date, and refers to a schedule and a map.

The schedule is where the detail is. Trees are listed by reference against four classifications, and each behaves differently:

  • Individual trees, numbered T1, T2 and so on, with a species for each. Only the specific tree at that location is protected.
  • Groups, numbered G1 and so on, protecting a stated number of trees of stated species as a group. The group is protected collectively, which matters when one member dies.
  • Woodlands, numbered W1 and so on, protecting all trees within the defined area including those that grow there after the order was made. This is the broadest classification.
  • Areas, numbered A1 and so on, protecting all the trees of whatever species that stood within the defined boundary at the date of the order. Trees that grew up afterwards are not covered.

The area classification is the source of most confusion. National guidance discourages its use for new orders and treats it as a temporary measure, because establishing which trees existed on a date decades ago is difficult for everyone involved. If a site carries an area order from the 1970s, historic aerial photography is usually the deciding evidence.

Check the date on the order as carefully as the map. Orders made before 2012 remain valid under the earlier forms, and some were varied or partly revoked later without the online layer being updated.

New orders, provisional effect and objections

An authority makes an order under section 198 of the Town and Country Planning Act 1990 and can direct that it takes effect provisionally from the date it is made, for a period of up to six months, while it decides whether to confirm it. That provisional effect is immediate, which is why a tree can go from unprotected to protected overnight once an application draws attention to it.

Notice of a new order goes to the owner and occupier and to anyone else the authority thinks appropriate, with at least 28 days to object or make representations. The authority must consider objections before confirming, and it can confirm with or without modifications.

Objecting to a new order on the basis that you want to fell the tree rarely succeeds. Objecting on the basis that the tree has structural defects, is the wrong species in the wrong place, or is suppressing a better specimen, supported by an arboricultural report, sometimes does.

The six week notice for conservation area trees

Trees in a conservation area that are not already covered by an order have their own regime. Section 211 of the 1990 Act requires six weeks written notice to the authority before cutting down, topping, lopping, uprooting or wilfully damaging a tree whose trunk exceeds 75 mm in diameter measured 1.5 m above the ground. The threshold rises to 100 mm where the work is thinning to help other trees grow.

During the six weeks the authority can make an order. If it does nothing, the work can go ahead at any point within two years of the notice. Carrying out the work without serving the notice is an offence in its own terms.

The practical sequence for a householder in a conservation area is to serve the notice, wait, and then act. Serving it and starting work three weeks later is the single commonest way people end up in correspondence with an enforcement officer, and the way those cases are handled is set out in the note on council enforcement priorities and complaints.

Consent for works to a protected tree is applied for on the authority's form, with a plan showing which tree and a description of the work in arboricultural terms. "Reduce by a third" is not a specification. A crown reduction expressed as a reduction in branch length, by aspect, with a statement of the intended final shape, is.

The authority has eight weeks to decide. No decision within that period counts as a refusal, which gives a right of appeal, and an appeal against a refusal or a condition must be made to the Secretary of State within 28 days of the decision notice.

Where the application supports a development proposal, the stronger route is usually to deal with the trees inside the planning application rather than separately. A tree survey to BS 5837:2012 with an impact assessment and a method statement answers the tree officer's questions and the case officer's at the same time, and where replacement planting is proposed a Landscape Strategy shows what the site will look like in fifteen years rather than next spring.

Note: consent granted under an order does not authorise works that need permission for some other reason, and a planning permission does not by itself authorise works to a protected tree unless the permission covers them.

Exemptions, and why they are riskier than they look

The 2012 Regulations exempt certain works, including trees that are dead, the removal of dead branches from a living tree, work necessary to abate a legal nuisance, and work required to implement a full planning permission. For dead or dangerous trees, five working days notice to the authority is required before the work, except in an emergency where notice must be given as soon as practicable afterwards.

Three things make this riskier than the wording suggests. The burden of proving the exemption applies falls on whoever did the work. "Dangerous" means presenting an immediate risk of harm, not merely large or leaning. And where a tree is removed under the dead or dangerous exemption, section 206 of the 1990 Act imposes a duty to plant a replacement of appropriate size and species at the same place as soon as reasonably possible.

Photograph the tree before the work, from several angles, with a scale in shot. Get a written assessment from an arboriculturist. Both cost less than the alternative.

What happens when an order is breached

Cutting down, uprooting or wilfully destroying a protected tree, or damaging it in a way likely to destroy it, is an offence under section 210 of the 1990 Act, carrying an unlimited fine on summary conviction. The court is directed to have regard to any financial benefit that has accrued or is likely to accrue from the offence, which is aimed squarely at trees removed to clear a development site.

The authority can also serve a tree replacement notice under section 207 requiring a replacement to be planted, generally within four years of the failure to comply with the replanting duty. And the duty to replant attaches to the land, so a buyer can inherit it.

This is general guidance, not legal advice. Check the position with your local planning authority or a qualified professional before relying on it. To see which documents a scheme affecting trees is likely to need, enter your postcode on PlanScope. PlanScope provides AI-assisted draft reports for planning applications. Reports should be reviewed before submission. We do not guarantee planning approval.

Frequently asked questions

How do I find out if a tree is protected?

Check the council's planning constraints map for a Tree Preservation Order layer, then ask the tree officer for a copy of the order and its sealed map. The sealed map is the legal record and a GIS layer is a convenience copy that can be out by a few metres. National data at planning.data.gov.uk is partial, so a negative result proves nothing.

What is the difference between an area order and a woodland order?

A woodland order protects all trees within the defined area, including those that grow there after the order was made. An area order protects only the trees that stood within the boundary on the date of the order, so later self-sown trees are not covered. Proving what existed decades ago usually means historic aerial photography.

Can a council protect a tree after I apply for planning permission?

Yes. An order made under section 198 of the Town and Country Planning Act 1990 can take effect provisionally from the date it is made, for up to six months, while the authority decides whether to confirm it. Owners and occupiers then have at least 28 days to object before confirmation.

Do I need consent for a dead or dangerous tree?

The 2012 Regulations exempt dead trees and work needed to remove an immediate danger, but five working days notice to the authority is required beforehand, or as soon as practicable afterwards in an emergency. The burden of proving the exemption sits with whoever did the work, and section 206 imposes a duty to replant.

What is the penalty for felling a protected tree?

Cutting down, uprooting or wilfully destroying a protected tree is an offence under section 210 of the Town and Country Planning Act 1990, carrying an unlimited fine on summary conviction. The court is directed to have regard to any financial benefit arising from the offence, which is aimed at trees cleared from development sites.

Sources and further reading

tpotreesconservation areatree officerhouseholder

This article is general guidance about the planning system in England and, where stated, the rest of the UK. It is not legal or professional advice. Check your local planning authority’s validation requirements and take professional advice for your specific site.

More in Council Guides

View all →
Council Guides7 min read

Council housing land supply positions and where to find them

The authority's supply statement, its monitoring report and the latest appeal decision rarely agree. Where to find each, what the delivery test thresholds do, and the five lines of attack on a site schedule.

Read article →
Council Guides7 min read

Searching a council planning register properly

The council portal is a search front end to the statutory planning register, not the register itself. How to search by map rather than address, trace pre-1996 records, and request files that were never scanned.

Read article →
Council Guides6 min read

Schemes of delegation: when a decision goes to committee

Most planning applications are decided by officers under delegated powers. The scheme of delegation sets out which ones are not, and that changes your timetable.

Read article →
Council Guides7 min read

Adopted parking standards: maximum, minimum and where they bind

A maximum caps provision, a minimum sets a floor, and whoever departs from either carries the evidence. This covers where standards sit in the plan, how accessibility zones work and what a departure needs.

Read article →
Council Guides7 min read

Supplementary planning documents and how far they bind

SPDs elaborate adopted policy and cannot create new requirements. This sets out the procedural basis for their weight, where design guides and parking standards are contestable, and how to cite one properly.

Read article →
Council Guides7 min read

Emerging local plans and the weight they carry

Weight attaches to individual emerging policies, not to plans. This sets out the three national tests, how weight moves through examination, and how to use main modifications in a planning case.

Read article →