Trees and Arboriculture

Tree and subsidence claims: the evidence a council needs

7 min readBy PlanScope Editorial Team

An insurer's letter is not evidence of causation. Councils deciding subsidence applications for protected trees want soil and foundation data, root identification and a full seasonal cycle of level monitoring.

A letter from a loss adjuster saying the oak is causing the cracking will not get you consent to fell a protected tree. Councils that deal with subsidence claims regularly expect four things: proof that the building is founded in shrinkable clay, proof that roots of that species are present under the affected foundations, level monitoring through a full seasonal cycle showing movement in the expected pattern, and a reasoned explanation of why crown management or repair will not solve it. Miss any one of those and the tree officer has a straightforward refusal to write.

That is not obstruction. A Tree Preservation Order exists because the authority decided the tree had amenity value, and the 2012 Regulations require it to weigh the case for removal against that value on evidence.

Why a bare insurer's letter fails

Subsidence letters written for insurance purposes answer a different question from the one the tree officer is asking. The insurer wants to know whether the claim is covered and which repair route costs least. The authority wants to know whether this particular tree is the cause, and whether anything less than felling would work.

Three assertions appear in almost every weak application. That the tree is close to the property, which is not evidence of causation. That the species is high water demand, which tells you the risk is plausible and nothing more. That the insurer requires removal, which is a commercial position rather than an arboricultural conclusion. Officers see all three weekly.

Soil, foundations and the trial pit

Clay shrinkage subsidence needs a shrinkable soil. If the house sits on sand, gravel or chalk, vegetation-related shrinkage is off the table and the cracking has another cause, which is worth knowing before you spend anything else.

A trial pit adjacent to the affected corner of the building gives the whole foundation picture in one exercise. The report should record the depth and type of foundation, the soil profile by depth with a description of each stratum, the depth of desiccation if present, and samples taken for laboratory testing.

The laboratory work that carries weight is the plasticity test. A plasticity index in the intermediate, high or very high range supports a volume change case; a low index undermines it. Where the desiccation profile is measured, moisture content against depth compared with a control location away from the tree is more persuasive still, because it shows drying where you say the roots are drawing water.

Identifying the roots under the building

Root presence is where most applications fall apart. Fine roots turn up in trial pits everywhere, and on their own they prove very little. What matters is roots of a species consistent with the suspect tree, at or below foundation level, in the zone of desiccated soil.

Species identification is a laboratory exercise, usually by anatomical examination of a root sample. Send samples with a clear reference to the pit, the depth and the face they came from. Where several trees are candidates, and there usually are, identification to species narrows the field, and where two species are present you have to deal with both rather than pick the one your client wants gone.

A short point that saves arguments later. Record the distance from the trunk to the affected wall and the tree's height, because the ratio is the first thing a tree officer checks against the general pattern of influence for that species.

Level monitoring through a full seasonal cycle

Level monitoring is the evidence that distinguishes clay shrinkage from every other cause of cracking, and it cannot be rushed. Points are installed on the building, read to a fixed datum, and read again at intervals through the year.

What the authority is looking for is a seasonal signature. Downward movement through the summer as the soil dries, recovery through the autumn and winter as it rehydrates, and the largest movement nearest the tree. A pattern of steady one-directional movement through all seasons points somewhere else: leaking drains, historic settlement, made ground or a failed lintel.

Twelve months of readings at monthly intervals is the normal ask. A shorter run covering only the late summer months can support an urgent case, but expect the officer to grant consent for crown reduction rather than felling and to ask for the remaining readings. Include the raw readings and the datum details as well as a graph, and note any interruption in the record.

Crack monitoring with tell-tales or calipers is useful supporting material and is not a substitute. Cracks open for many reasons.

Options short of felling

The regulations require the authority to consider whether a lesser intervention would serve, so an application that has not addressed the alternatives is incomplete on its face.

  • Cyclical crown reduction, specified properly, with a stated percentage and a return interval, which reduces water demand without losing the tree
  • Root severance with a physical barrier installed in a trench between the tree and the building, where site conditions allow and the tree's stability is assessed first
  • Repair of the damage combined with monitoring, where movement is small and the building is tolerant
  • Underpinning or foundation strengthening, which is expensive and is often the honest answer where the tree has high amenity value and the damage is modest

Crown reduction is the option most often granted, and it is also the one most often badly specified. A consent that says reduce by 30 per cent is close to meaningless in practice, which is why the specification deserves the same care as any other schedule of works. Our note on writing pruning specifications properly covers the wording that survives being handed to a contractor.

Illustrative example: a mature lime 7m from the rear corner of a 1930s semi on London Clay, with monitoring showing 6mm of seasonal cyclical movement at the nearest point and 1mm at the far corner. A cyclical reduction on a three year cycle, with continued monitoring, is a proportionate outcome. The same monitoring showing 25mm of movement, cracking through the lintels and roots of lime confirmed at 1.2m depth under a 600mm foundation makes a different case.

Putting the application together

For a tree covered by a Tree Preservation Order, you are applying for consent for works under section 198 of the Town and Country Planning Act 1990 and the Town and Country Planning (Tree Preservation) (England) Regulations 2012. For a tree in a conservation area that is not the subject of an Order, you give the authority six weeks notice under section 211 instead, and the same evidence still decides the outcome.

Submit as one bundle: the structural engineer's report, the trial pit log and laboratory results, the root identification certificate, the level monitoring record with the datum and raw readings, an arboricultural report by a suitably qualified arboriculturist covering species, condition, amenity value and the options considered, a plan showing the tree, the building and the pit locations, and photographs of the damage with dates.

A tree survey prepared to BS 5837:2012 does a different job, and where the property is also being extended it is the document the planning case officer will want. If the works form part of a wider building project, the sequencing matters, and our guide to retaining a tree through a construction programme sets out how the two consents interact.

The authority must give its reasons. Read them for what they attack: a refusal that turns on the absence of root identification is curable, while one that turns on the amenity value of a landmark tree in a conservation area needs a different approach.

There is a right of appeal to the Planning Inspectorate against refusal of consent for works to a tree covered by an Order, and the 2012 Regulations also contain a limited compensation route where loss or damage follows from a refusal, subject to exclusions and a claim period. Take advice on that before relying on it, because the exclusions do real work.

Where the neighbour's tree is the problem rather than your own, liability and cost recovery work differently, and the neighbouring property angle sets out who applies and who pays.

This is general guidance, not legal advice; check the position with your local planning authority or a qualified professional before relying on it.

Browse the PlanScope report types to see what a tree-related application usually needs. PlanScope provides AI-assisted draft reports for planning applications. Reports should be reviewed before submission. We do not guarantee planning approval.

Frequently asked questions

Is an insurer's letter enough to fell a protected tree?

No. It answers a different question, namely whether the claim is covered and which repair costs least. The authority needs proof that the building sits in shrinkable soil, that roots of the suspect species are present at foundation level, and that seasonal level monitoring shows the expected pattern of movement and recovery.

How long does level monitoring need to run?

Twelve months of monthly readings is the normal expectation, because the case rests on a seasonal signature of summer downward movement and winter recovery. A shorter late-summer run can support an urgent application, but the likely outcome is consent for crown reduction with a request for the remaining readings.

Why does root identification matter so much?

Fine roots turn up in most trial pits and prove very little. What supports the case is roots of a species consistent with the suspect tree, found at or below foundation level within the desiccated zone. Identification is a laboratory exercise, and where two species are present both have to be addressed.

Will the council accept crown reduction instead of felling?

Frequently, and the regulations require the authority to consider whether something less than removal would serve. Cyclical reduction with a stated percentage and return interval reduces water demand while keeping the amenity value. A vague consent to reduce by a percentage is worth little on site, so specify the works properly.

Can I claim compensation if consent is refused?

The Town and Country Planning (Tree Preservation) (England) Regulations 2012 contain a limited compensation route where loss or damage follows a refusal, subject to exclusions and a claim period. The exclusions are substantial, so take advice before relying on it. There is also a right of appeal to the Planning Inspectorate.

What if the tree belongs to a neighbour?

The evidential standard for the tree application is the same, but who applies, who pays and who carries the liability all change. Consent for works to a protected tree can be sought by anyone, though carrying out works to a tree you do not own raises separate civil questions that planning consent does not resolve.

Sources and further reading

treessubsidencetree preservation orderarboriculturehouseholder

This article is general guidance about the planning system in England and, where stated, the rest of the UK. It is not legal or professional advice. Check your local planning authority’s validation requirements and take professional advice for your specific site.

More in Trees and Arboriculture

View all →
Trees and Arboriculture6 min read

Woodland creation on a development site and its upkeep

New woodland is easy to draw and hard to keep alive. The planting design, the establishment regime and the legal mechanism all have to agree with each other.

Read article →
Trees and Arboriculture7 min read

Tree officer site visits and what they inspect

The officer looks at the fence line first. Here is the full checklist, the consequences of an incursion, and the site record that protects you.

Read article →
Trees and Arboriculture7 min read

The five year maintenance condition on new planting

Planting that dies within five years must be replaced in the next planting season. The obligation runs with the land and survives the sale of the house.

Read article →
Trees and Arboriculture7 min read

Tree pits, structural soils and street tree establishment

Street trees fail on soil volume, not species choice. Work backwards from the mature canopy, put the volume on the drawing, and resolve the service corridor first.

Read article →
Trees and Arboriculture7 min read

Tree roots and proximity to a public sewer or drain

Most undertakers control building and planting within around 3m of a public sewer. Resolving that against retained trees is a layout decision, not a condition to discharge later.

Read article →
Trees and Arboriculture8 min read

Ash dieback and what it changes in a tree survey

Infected ash is not automatically a category U tree. How to record crown decline and basal lesions, categorise honestly, and handle protected ash under the 2012 exemption.

Read article →