Report Deep Dives

The two hour sun on ground test in an overshadowing study

8 min readBy PlanScope Editorial Team

Half the amenity area receiving two hours of sun on 21 March is the benchmark. How to define the area, model the context honestly, and report the before and after figures.

The sun on ground test asks a simple question about an amenity area: on 21 March, does at least half of it receive two hours or more of direct sunlight, and if it does not already, does the development reduce the sunlit area to less than 0.8 times what it was. That is the test in the Building Research Establishment's site layout guidance, and it is the measure that decides whether a garden, a courtyard or a play space is treated as adequately sunlit.

It is a different exercise from the window based measures. Vertical sky component and annual probable sunlight hours describe what reaches a window. Sun on ground describes what reaches the ground, and a scheme can pass one set of tests and fail the other.

What the test measures and why 21 March

The equinox is used because it is representative rather than extreme. On 21 June almost any open space receives sunlight for long periods, and on 21 December almost nothing does, so neither date distinguishes between a good layout and a poor one.

The guidance asks for the proportion of the amenity area receiving at least two hours of direct sunlight on that date, expressed as a percentage of the total area. Half or more is the figure that indicates the space will appear adequately sunlit through the year. Where an existing area already falls below that, the second limb applies: a reduction to less than 0.8 times the previous sunlit area is treated as noticeable.

Report both limbs. A space that was at 38 per cent and drops to 33 has failed the absolute figure both before and after, and the planning question is the proportional change, which is 0.87 and passes.

The Overshadowing Study should state the date, the latitude or location used, whether daylight saving is applied to the timings and whether the two hours must be continuous. The guidance does not require continuity, and assuming it does will fail spaces that are perfectly usable.

Defining the amenity area to be tested

Half the arguments in this field are about the denominator rather than the analysis.

Define the area on a plan, hatched, with its extent in square metres, and say what has been excluded and why. Reasonable exclusions are driveways, bin and cycle stores, service yards, footpaths providing access rather than amenity, and permanently covered areas such as undercrofts. Unreasonable exclusions are the shaded strip along the northern boundary, removed because it fails.

For private gardens serving houses, test each garden separately rather than aggregating them, because an average across a street conceals the two plots that are unusable. For communal space, test the space as designed, including any part intended as a sitting area.

Where a scheme proposes new amenity space, some local standards apply the same half and two hour test to communal amenity and to children's play space. Check the local plan and any play space guidance before choosing a metric, and where a Play Space Assessment is required, keep the sunlight analysis consistent with the play space areas it identifies.

Modelling the surrounding context correctly

Three modelling decisions change the result more than anything in the layout.

The first is context extent. Model surrounding buildings far enough out that any structure capable of casting a shadow across the space at any time between sunrise and sunset on the test date is included. On a tight urban site that can mean a radius considerably larger than the immediate neighbours, particularly to the south east and south west where low morning and afternoon sun throws long shadows.

The second is boundary treatment. Existing and proposed walls, fences and hedges to their real heights, because a 1.8 metre close boarded fence on a southern boundary removes a strip of garden from the two hour figure on its own. Assuming a permeable boundary where a solid one exists overstates the result.

The third is trees. On 21 March deciduous trees are bare, so modelling them as solid volumes is wrong and modelling them as absent is closer to the truth for that date. Evergreens should be included. Where large deciduous trees are the dominant shading influence, report the equinox result without them and add a sensitivity run for a summer date with canopy, and say which is which.

Level changes matter on sloping sites, and the ground model should be the proposed levels rather than existing, because a garden cut into a slope sits lower than the survey suggests.

Reporting before and after percentages

The reporting format that survives scrutiny is a table with one row per amenity area.

Field What it shows
Reference and location Keyed to a plan, so a reader can find it
Total area tested Square metres, with exclusions listed
Existing area receiving two hours or more Square metres and percentage
Proposed area receiving two hours or more Square metres and percentage
Ratio Proposed divided by existing

Add plots. A pair of plans showing the two hour contour before and after, on the same sheet at the same scale, communicates more to an officer or a member than any table, and the hourly shadow plots behind it belong in an appendix. The conventions for those plots, including which hours to show and how to label them, are covered in shadow plots and dates in an Overshadowing Study.

State the software and the sky and sun model used. Different packages handle the horizon, atmospheric refraction and the sun's disc slightly differently, and where a result sits within a percentage point of a threshold that difference is material enough to mention.

Transient overshadowing and where the argument runs out

Transient overshadowing is the observation that a shadow crossing a space for part of the day is different from permanent shade. It is a fair point and it is already inside the test, because the test measures cumulative duration rather than instantaneous condition.

That is worth stating plainly, because the argument is often made as though the guidance ignored it. A shadow that passes across a garden between 10am and 11am has taken one hour out of that part of the garden's total, and if the remaining sunlit hours still reach two, the point passes the test on its own terms.

Where the argument runs out is on a space that receives sunlight only in a short window. A courtyard that is sunlit from 12pm to 2pm and shaded either side is at exactly the threshold, and a new building that removes twenty minutes takes it below. Describing that as transient is not persuasive, because it removes the only sunlight the space has.

The honest position in a marginal case is to report the figure, describe the pattern through the day, and let the decision maker weigh it rather than characterising the loss with an adjective.

Gardens, courtyards and play space in practice

The three types behave differently and it is worth saying so in the report.

Private rear gardens on a terrace are long and narrow, so shading from a rear extension next door affects the near end while the far end is unaffected. The percentage often passes while the part of the garden closest to the house, which is where people sit, does not. Reporting the sunlit area's location as well as its size addresses this.

Communal courtyards in perimeter block schemes are the hardest case, because the block shades its own courtyard. The variables that move the result are courtyard width, the height of the southern range and whether that range is broken by a gap or lowered.

Children's play space frequently ends up in the residual land at the northern edge of a site, which is the worst position for sunlight. Testing the play space location early, before the layout is fixed, avoids a late relocation.

Design changes that move the result

Five changes do most of the work, in rough order of effectiveness.

  1. Reduce the height of the range on the southern side of the space, even by one storey.
  2. Introduce a gap in that range, aligned so that midday sun reaches the space through it.
  3. Widen the space in the north to south direction rather than east to west.
  4. Move the amenity area to the southern or western part of the site and put parking or servicing in the shaded northern strip.
  5. Lower or make permeable the southern boundary treatment, which on small gardens can be worth several percentage points on its own.

Test these early. Running the analysis once the layout is fixed turns it into a compliance report, and the value of a sun on ground study is in the two or three iterations before that point. The window based analysis in a Daylight and Sunlight Assessment should be run in the same iterations, because a change that improves ground sunlight sometimes worsens a neighbour's window.

This is general guidance, not legal advice. The Building Research Establishment guidance is advisory and local standards vary, so confirm the metric and the target with the local planning authority or a qualified consultant before relying on it.

PlanScope can draft the assessment narrative and policy context around your modelling outputs, and you can browse all 66 report types to see what else a scheme needs. PlanScope provides AI-assisted draft reports for planning applications. Reports should be reviewed before submission. We do not guarantee planning approval. For specialist technical reports, qualified professional input may be required.

Frequently asked questions

What is the two hour sun on ground test?

The Building Research Establishment guidance suggests an amenity area appears adequately sunlit if at least half of it receives two hours or more of direct sunlight on 21 March. Where an area already falls below that, a reduction to less than 0.8 times the previous sunlit area is treated as a noticeable loss.

Why is 21 March used rather than midsummer or midwinter?

Because the equinox is representative rather than extreme. Almost any open space is sunlit for long periods on 21 June and almost none is on 21 December, so neither date distinguishes a good layout from a poor one. Other dates can be run for context, clearly labelled as additional.

Do the two hours have to be continuous?

The guidance does not require continuity, so cumulative sunlit duration through the day is what counts. Assuming continuity is required will fail spaces that are perfectly usable, so state the assumption explicitly in the methodology rather than leaving the reader to infer which approach was taken.

Should trees be included in the model?

Evergreens yes. Deciduous trees are bare on 21 March, so modelling them as solid volumes overstates shading for that date. Where large deciduous trees dominate the shading, report the equinox result without them and add a clearly labelled sensitivity run for a summer date with canopy in place.

What can be excluded from the amenity area?

Driveways, bin and cycle stores, service yards, access footpaths and permanently covered areas such as undercrofts. What cannot reasonably be excluded is the shaded strip along a northern boundary, removed because it fails. List every exclusion with the reason and give the total tested area in square metres.

Which design changes improve a sun on ground result most?

Reducing the height of the range on the southern side of the space, introducing a gap in that range aligned to midday sun, widening the space north to south, moving the amenity area away from the northern edge, and lowering or making permeable a solid southern boundary treatment.

Sources and further reading

overshadowingsunlightbre 209amenity spacedaylightreport writing

This article is general guidance about the planning system in England and, where stated, the rest of the UK. It is not legal or professional advice. Check your local planning authority’s validation requirements and take professional advice for your specific site.

More in Report Deep Dives

View all →
Report Deep Dives7 min read

The sensitivity and magnitude matrix in an LVIA

GLVIA3 supplies a method, not a matrix. How value and susceptibility combine, what magnitude actually contains, and how to report year 1 and year 15 residual effects defensibly.

Read article →
Report Deep Dives7 min read

The ground gas assessment section of a Phase 2 report

Monitoring in settled weather, flow readings at the resolution limit and a characteristic situation with no source behind it are the three failures reviewers see most. What a defensible ground gas section contains.

Read article →
Report Deep Dives7 min read

The background sound survey in a Noise Impact Assessment

The LA90 background sets everything else in a BS 4142 rating. Measurement positions, representative periods, calibration records and the uncertainty a reviewer will look for.

Read article →
Report Deep Dives7 min read

The scope and modules of a Whole Life Carbon Assessment

Upfront, embodied and whole life carbon are three different figures from different module sets. The scope errors that get assessments rejected, and the assumptions that move the result.

Read article →
Report Deep Dives6 min read

The carbon offset and monitoring sections of an Energy Statement

Offsetting deals with what is left after fabric, plant and renewables. The residual calculation, the obligation drafting, the metering strategy and who reports once units are sold.

Read article →
Report Deep Dives6 min read

The sustainable transport section of a Transport Assessment

Trip generation is arithmetic, accessibility is judgement. Isochrones instead of circles, LTN 1/20 route quality, honest bus evidence and measures that can actually be secured.

Read article →