Daylight, Sunlight and Amenity

The two hour sunlight test for gardens and amenity space

6 min readBy PlanScope Editorial Team

The BRE garden sunlight test is short: half the area, two hours, 21 March, and a 0.8 factor for the change. Here is how it is modelled and how to design a scheme that passes.

The test most English councils apply to garden sunlight comes from the BRE guide to site layout planning for daylight and sunlight, and it is easier to state than most planning rules. At least half of a garden or amenity area should receive at least two hours of sunlight on 21 March. If a new building reduces the sunlit area to less than 0.8 times what it was, the loss is treated as noticeable.

That is the whole test. Half the garden, two hours, the spring equinox, and a 0.8 factor for the change.

It is guidance rather than law, and the BRE guide says explicitly that its numerical values should be applied with flexibility. Councils still use it, because it is the only widely accepted yardstick for something neighbours argue about constantly.

Why 21 March and why two hours

21 March is the spring equinox, when day length is roughly equal everywhere and the sun sits midway between its winter and summer paths. Testing on that date avoids two distortions: a June test would make almost any garden pass, and a December test would fail almost all of them.

Two hours is a judgement about usable outdoor amenity rather than a scientific threshold. A garden that gets two hours of March sun will get considerably more in high summer, which is when people use it.

The area assessed is the part of the garden in ordinary use. For a house that usually means the whole rear garden, sometimes excluding a narrow side passage or a shed footprint. For a block of flats it means the communal amenity area rather than the sum of every scrap of landscaping. Where a garden is already divided by dense planting or a level change, say which area you have assessed and why.

The 0.8 factor, and what it actually measures

The two hour test looks at the situation after development. The 0.8 factor compares before with after.

Take the area of garden receiving two hours of sun on 21 March in the existing situation. Then take the same area in the proposed situation. If the proposed area is less than 80 per cent of the existing area, the reduction is treated as noticeable, and the council has to weigh it.

Both parts matter, and they can pull in different directions:

Situation Two hour test 0.8 factor Typical outcome
Garden keeps more than half in sun after development Passes Not reached No garden sunlight objection
Garden falls below half, from a position well above half Fails Fails Strong amenity objection
Garden already below half before development Already fails May still pass Argument turns on the scale of change

That last row is the one householders find counter-intuitive. A north-facing garden hemmed in by mature trees may already fail the two hour test with nothing built. The proposal is then judged on how much it makes an existing shortfall worse, rather than on the absolute number.

What the assessment looks like

Two outputs do the work.

Sun on ground plots show the garden in plan with the sunlit area shaded at intervals through 21 March, and a summary of the total area receiving two hours or more. Produce them for the existing and proposed situations so the 0.8 comparison can be read directly.

Transient overshadowing diagrams show the shadow cast at hourly intervals, usually on 21 March, with 21 June and 21 December added where the council asks. They are easy to read and easy to check, which is why officers like them.

Both come out of a three dimensional model that has to include the existing building, the proposal, neighbouring buildings, boundary walls and fences of the right height, and any trees that are protected or that will certainly remain. Leaving out a two metre close-boarded fence is a common way to produce an answer that does not survive scrutiny.

An Overshadowing Study covers this ground for a householder or small scheme. Where windows as well as gardens are affected, the wider Daylight and Sunlight Assessment adds vertical sky component, no-sky line and annual probable sunlight hours calculations for the affected rooms.

Where garden sunlight sits among the other amenity tests

Loss of light to a garden is a material planning consideration, and so is loss of light to habitable room windows. They are assessed differently.

Windows are tested using the vertical sky component, with 27 per cent as the reference value, and the no-sky line inside the room. Sunlight to windows uses annual probable sunlight hours, applied to windows within 90 degrees of due south. Gardens use the two hour equinox test described here. A scheme can pass the window tests and fail the garden test, or the reverse.

Many councils also operate a 45 degree or 25 degree rule in a householder design guide, drawn in plan and in section from the centre of the neighbour's nearest window. Those rules are a quick proxy that sits alongside the BRE method rather than replacing it. Where a scheme fails the proxy but passes the BRE test, say so with the modelling to back it.

Rights of light is a separate matter entirely. It is a private legal right that can arise over time, enforced through the civil courts, and the council does not deal with it. A planning permission does not authorise an interference with a right of light, and a right of light claim does not stop a planning permission.

Designing to pass rather than arguing afterwards

The variables that move the result are the ones you can control at sketch stage.

  • Depth of the extension along the boundary, which drives the length of the shadow into the neighbour's garden.
  • Height at the boundary, particularly the eaves height and whether the roof slopes away.
  • Orientation. The same extension on a south-facing rear elevation and a north-facing one produces very different shadows.
  • Distance from the boundary, where even 500 mm can change the outcome on a narrow plot.
  • Roof form, since a hipped or pitched roof sloping away from the boundary casts a shorter shadow than a flat roof of the same ridge height.

Illustrative example. A single storey rear extension 4 m deep on a terrace with west-facing gardens casts a long afternoon shadow across the neighbour's patio in March. Pulling the extension 700 mm off the boundary and hipping the roof away restores enough of the sunlit area to pass the 0.8 comparison, at the cost of a small amount of internal floor space. This example is illustrative only.

If a neighbour has already objected on light grounds, commission the modelling before the council determines the application rather than after. An officer who has an assessment in front of them can address the objection in the report. An officer with nothing has to take the objection at face value.

What to submit and when

For a householder application, the modelling normally goes in as a short appendix to the Design and Access Statement or as a standalone note with the plots attached. For a larger scheme it is a standalone assessment.

Check the council's own supplementary planning document first. Some set their own garden amenity standards, including minimum garden areas and separation distances, and those sit alongside the BRE test rather than instead of it. Where the local guide and the BRE guide disagree, address both.

This is general guidance, not legal advice. Check the position with your local planning authority or a qualified professional before relying on it.

Enter your postcode on PlanScope to see which amenity and daylight reports your project is likely to need.

PlanScope provides AI-assisted draft reports for planning applications. Reports should be reviewed before submission. We do not guarantee planning approval.

Frequently asked questions

How much sunlight should a garden get under the BRE guidance?

At least half of the garden or amenity area should receive at least two hours of sunlight on 21 March. If a development reduces the area that receives two hours to less than 0.8 times its previous value, the guidance treats the loss as noticeable. Both parts of the test are applied, and a scheme can fail one and pass the other.

Is the BRE guidance legally binding?

No. It is good practice guidance, and the document itself says its numerical values should be applied flexibly rather than as fixed limits. Councils use it because it is the accepted yardstick for garden sunlight, and many adopt it through a supplementary planning document, which gives it weight in the planning balance.

What if my neighbour's garden already fails the test?

Then the assessment turns on the scale of the change rather than the absolute figure. A north-facing garden shaded by mature trees may fail the two hour test before anything is built. The 0.8 comparison between the existing and proposed sunlit areas becomes the operative test, and small extensions can still pass it.

What drawings show garden overshadowing?

Sun on ground plots showing the sunlit area of the garden through 21 March in the existing and proposed situations, plus transient shadow diagrams at hourly intervals. The model must include neighbouring buildings, boundary walls and fences at their real heights, and trees that are protected or certain to remain.

Is rights of light the same as the planning sunlight test?

No. Rights of light is a private legal right enforced through the civil courts, and the council does not consider it when determining an application. Planning permission does not authorise an interference with a right of light, and a rights of light claim does not prevent a permission being granted.

Sources and further reading

daylight and sunlightovershadowingamenityhouseholderbre 209extensions

This article is general guidance about the planning system in England and, where stated, the rest of the UK. It is not legal or professional advice. Check your local planning authority’s validation requirements and take professional advice for your specific site.

More in Daylight, Sunlight and Amenity

View all →
Daylight, Sunlight and Amenity7 min read

Cumulative overshadowing from consented but unbuilt schemes

Where a neighbouring plot holds an unbuilt permission, the realistic future condition includes it. Model that, model the proposal alone, and say which scenario the conclusion rests on.

Read article →
Daylight, Sunlight and Amenity7 min read

Daylight in a conservation area: rooflights and sash geometry

Establish what the heritage duty permits in aperture, profile and position first, then model what it delivers. A daylight result based on glazing a conservation officer will not accept is worth nothing.

Read article →
Daylight, Sunlight and Amenity7 min read

Dual aspect and single aspect units in amenity policy

A scheme can pass every daylight test and still fail on aspect. Policy restricts north facing single aspect units outright, and the overheating rules bite on the same configuration.

Read article →
Daylight, Sunlight and Amenity7 min read

Daylight to solar panels and whether planning protects it

There is no right to light for a roof-mounted array. Loss of generation is material but weakly weighted, so the objection needs a shading study and conventional amenity grounds alongside it.

Read article →
Daylight, Sunlight and Amenity7 min read

Setting up a daylight model that survives scrutiny

Reflectances, room depths and baselines decide whether a daylight assessment can be relied on. Here is how to set the assumptions and document them for a reviewer.

Read article →
Daylight, Sunlight and Amenity7 min read

Outlook and the tunnel effect in a narrow infill scheme

A scheme can pass every BRE daylight criterion and still be refused on enclosure. Outlook is judged from sections, and the argument rests on how the relationship is drawn.

Read article →