Use class F1 against F2 and which applies to a hall
A hall can sit in F1 or F2 depending on who uses it. The classification decides what you can change without permission, and the bookings diary is the evidence.
The f1 vs f2 use class question usually arrives as an argument about a hall. Class F1 covers learning and non-residential institutions, including public halls and exhibition halls, places of worship, museums, galleries not selling work, public libraries and schools. Class F2 covers local community uses, including a hall or meeting place for the principal use of the local community, a small local shop, outdoor sport and recreation, and swimming pools and skating rinks. A hall can sit in either class, and which one it sits in decides what you can do with it without applying for permission.
The distinction is the user, not the building. A hall hired out for conferences, performances and commercial events is a public hall in F1. A hall used by local groups, a parish, a scout troop or a residents association is a local community facility in F2.
What each class contains
Both classes were created by the Town and Country Planning (Use Classes) (Amendment) (England) Regulations 2020, which replaced the old D1 and D2 classes and moved a great deal of former D1 and D2 use into Class E or into sui generis.
Class F1, learning and non-residential institutions, covers the provision of education, display of works of art other than for sale or hire, museums, public libraries and reading rooms, public halls and exhibition halls, public worship and religious instruction including church halls, and law courts.
Class F2, local community, covers a shop no larger than 280 m² selling mostly essential goods including food where there is no other such facility within 1,000 m, a hall or meeting place for the principal use of the local community, an area or place for outdoor sport or recreation not involving motorised vehicles or firearms, and an indoor or outdoor swimming pool or skating rink.
What is not in either class matters as much. A cinema, concert hall, bingo hall, dance hall, drinking establishment, hot food takeaway and theatre are all sui generis since 2020, with no class protection and no permitted changes into or out of them.
Halls, meeting rooms and places of worship
Three hall scenarios come up repeatedly.
A village hall run by a trust for local organisations is F2(b). It serves a defined local community, the hirers are local groups, and the bookings diary shows it. That classification matters because F2 uses have some protection in policy as community facilities, and because the loss of a community facility is a material consideration in its own right.
A church hall attached to a place of worship is normally part of the F1 use, as religious instruction and ancillary community activity associated with the church. Where the hall is let out commercially to an extent that the letting becomes the primary activity rather than an ancillary one, the position changes and the lawful use needs establishing on the facts.
A commercially operated events hall taking weddings, conferences and trade shows is a public or exhibition hall in F1. Add bar-led evening operation or regular live music and the use may have drifted into sui generis territory as a drinking establishment or a concert hall, which is where enforcement cases tend to start.
Local community uses and the 280 square metre shop
Class F2(a) is the one people misread. The local shop limb has three conditions and all of them have to be met: the shop must be no larger than 280 m², it must sell mostly essential goods including food, and there must be no other such facility within 1,000 m.
The 1,000 m test is the trap. A village shop that qualifies as F2(a) today can stop qualifying when another small shop opens 600 m away, and a retail unit in a suburb with a parade of shops nearby is in Class E rather than F2 whatever its size. The classification is assessed on the facts at the relevant time rather than being fixed on first occupation.
| Use | Class | Key qualifier |
|---|---|---|
| Village shop, 150 m², only shop in the settlement | F2(a) | Under 280 m², no other facility within 1,000 m |
| Convenience shop, 150 m², in a parade | E(a) | Another such facility nearby |
| Village hall for local groups | F2(b) | Principal use is the local community |
| Commercial conference and exhibition hall | F1 | Public hall or exhibition hall |
| Church with hall used for parish activity | F1 | Public worship and religious instruction |
| Members club with bar as the main activity | Sui generis | Drinking establishment |
Movement between and out of each class
Within a class, change is not development. A school becoming a museum stays in F1 and needs no permission for the change of use, subject to any condition on the existing permission restricting the use. A village hall becoming a local sports pitch stays in F2.
Between the classes, a change from F1 to F2 or from F2 to F1 is development and needs permission unless a permitted development right applies. That is a genuine difference from the old D1 class, where a wide range of institutional uses were interchangeable.
Out of the classes and into Class E, or into residential, the position depends on the current text of Part 3 of Schedule 2 to the GPDO 2015. The permitted changes have been amended several times since 2020, so check the current wording of Part 3 rather than relying on a summary written when the classes were introduced. Conditions on existing permissions frequently restrict the use to a named purpose, which overrides any class flexibility and is the single most common reason a change of use that looks permitted is not.
Permitted development between F classes
Where a permitted right exists, it usually comes with conditions and limitations that have to be read in full: floorspace caps, exclusions in designated areas, prior approval requirements and time limits.
Two practical points apply whatever the current list says. First, a permitted change of use does not authorise any building work, so new shopfronts, extraction, extensions or external alterations need their own consent. Second, the right attaches to the lawful use, so if the existing use was never lawfully established the right is not available.
Where you intend to rely on a permitted change, consider a lawful development certificate under section 192 of the Town and Country Planning Act 1990 confirming that the proposed use would be lawful. On a building with a long and mixed history that certificate is worth its fee, because it converts an argument into a document.
Evidence of the lawful existing use
Classification arguments are won on evidence of what the building has actually been used for, and by whom.
The documents that help are the original planning permission and any conditions on it, business rates records, the bookings diary or hire register for a hall, accounts showing the income split between local and commercial hirers, tenancy and licence agreements, photographs with dates, and statutory declarations from people with direct knowledge of the use over the relevant period.
A hall's booking records are unusually persuasive because they show the user mix directly, which is the test for F2(b). Where income from commercial lettings has grown to exceed community use, the honest position may be that the use has changed, and that a planning application rather than an assertion is the right route.
Illustrative example. A 1960s hall with an original permission for a "public hall" is run by a trust, hired four evenings a week by a scout group, a dance class and a residents association, with one commercial wedding a month. The bookings diary supports a local community use in F2(b). The trust then signs an agreement with a commercial events operator for three days a week, and the use mix shifts towards a public hall in F1. The change between the classes needs permission, and the trust finds that out when a neighbour complains about parking.
Applying the classes to a mixed operation
Mixed operations are the hard cases, and three principles help.
The primary use governs, with any clearly subordinate activity taken as part of it. A café inside a museum serving visitors is ancillary to the F1 use; the same café with its own street entrance and its own trade is a separate Class E use.
Where two uses operate independently and neither is subordinate, the site may have a mixed use that is sui generis, which means no class flexibility at all and a planning application for any change. That is frequently worse than it sounds, and it is sometimes the accurate description of a community building that has grown into a commercial venue.
Where catering or cooking is involved, the extraction and odour position needs addressing on its own merits, and a Ventilation and Extraction Statement is usually what the environmental health officer asks for. Loss of a community facility also engages policy protection, which overlaps with the designations covered in asset of community value or local heritage listing.
Set the classification out explicitly in the Planning Statement, with the evidence for the existing lawful use, the class you say applies and the class you are moving to. Officers decide these questions quickly when the evidence is laid out and slowly when it is not. The full list of report types shows what else a change of use application of this kind tends to need.
This is general guidance, not legal advice. Use class questions turn on the facts of each case and the permitted development rights in Part 3 have been amended several times, so check the current text and the position with your local planning authority before relying on this. A lawful development certificate is the only formal way to confirm that a use is lawful.
Frequently asked questions
Is a village hall F1 or F2?
Usually F2(b), as a hall or meeting place for the principal use of the local community. The test is the user rather than the building, so a hall hired by local groups, a parish or a scout troop is F2. A hall operated commercially for conferences and exhibitions is a public hall in F1.
What are the conditions for a shop to be in Class F2?
All three must be met: the shop is no larger than 280 m2, it sells mostly essential goods including food, and there is no other such facility within 1,000 m. A convenience shop in a parade of shops is in Class E instead, whatever its size, because another such facility is nearby.
Can I change from F1 to F2 without permission?
Not as a matter of course. A change between the two classes is development and needs permission unless a permitted development right in Part 3 of Schedule 2 to the GPDO 2015 applies. Changes within the same class are not development, subject to any condition restricting the use.
Which former D1 and D2 uses are now sui generis?
Cinemas, concert halls, bingo halls, dance halls, drinking establishments, hot food takeaways and theatres all became sui generis in 2020. They carry no class protection and no permitted changes into or out of them, so any change of use involving them needs a planning application.
What evidence establishes a hall's lawful use class?
The original permission and its conditions, business rates records, the bookings diary or hire register, accounts showing the split between community and commercial hirers, tenancy agreements, dated photographs and statutory declarations. For F2(b) the bookings diary is the most persuasive document because it shows the user mix directly.
Sources and further reading
- Town and Country Planning (Use Classes) Order 1987
- Town and Country Planning (Use Classes) (Amendment) (England) Regulations 2020
- Town and Country Planning (General Permitted Development) (England) Order 2015
- Planning Practice Guidance: When is permission required
- Town and Country Planning Act 1990, section 192