A validation checklist for a full planning application

6 min readBy PlanScope Editorial Team

Applications are validated against the national list in article 7 and the council's own local list. Here is what both contain, plus the drawing conventions that cause returns.

A full planning application is validated against two lists: the national requirements set out in article 7 of the Development Management Procedure Order 2015, and the local list your council publishes and reviews at least every two years. Miss an item on either and the application is not registered, the eight or thirteen week clock never starts, and you find out by email a fortnight later. A planning application validation checklist that works has to cover both, plus the drawing conventions that get applications returned even when every document is present.

Work through it in the order below, because several items depend on decisions made earlier.

The national list and where it comes from

Five things are required nationally for a full application. The completed standard application form. A plan identifying the land, normally at 1:1250 or 1:2500 with the application site edged red and any other land in the applicant's control edged blue. Other plans and drawings necessary to describe the development. The correct fee. And the ownership certificate with the agricultural holdings declaration.

A Design and Access Statement is required for major development and, in a conservation area or World Heritage Site, for development comprising one or more dwellings or 100 square metres or more of floorspace. Listed building consent applications always need one. Where it is required it is a national requirement, so the council cannot waive it, and a thin Design and Access Statement that says nothing about access arrangements is a common reason for a request for further information.

Two more national items have been added in recent years and still catch people out. Applications must include a statement as to whether the applicant believes the biodiversity gain condition applies, with the pre-development biodiversity value information where it does. And applications for relevant high-rise residential buildings must include a fire statement under article 9A of the same Order.

Drawings, scales and title block conventions

More applications are rejected on drawing conventions than on missing reports.

Every drawing needs a unique drawing number, a revision letter, a stated metric scale, the paper size it was drawn at, a scale bar, and a north point on any plan view. Drawings marked "do not scale" with no scale bar will be refused, and so will drawings exported at a size that no longer matches the stated scale.

The usual set for a full application is a location plan at 1:1250 or 1:2500, a block or site plan at 1:500 or 1:200 showing the whole site with boundaries, levels and parking, existing and proposed floor plans and elevations at 1:50 or 1:100, sections where levels change, and a roof plan where the roof form is not obvious from the elevations. Show existing and proposed on separate sheets or clearly separated on the same sheet.

The red line is a substantive matter rather than a graphical one. It must include every piece of land needed to carry out the development, including access works, visibility splays and any drainage connection crossing third party land.

Ownership certificates and notices

Sign the certificate that matches the red line, not the one that matches the title you hold.

Certificate A covers the case where you owned all the application land throughout the 21 days before the application. Where the red line crosses a verge vested in the highway authority, a shared driveway, or a strip retained by an estate developer, you are on Certificate B and you must serve notice on those owners before submitting, recording the date of service on the form. Certificates C and D deal with owners you cannot trace and require a newspaper notice.

The agricultural holdings declaration is answered separately. Informal grazing arrangements can amount to a tenancy, so take advice before declaring that no agricultural holding exists.

Local list items and how to find them

The local list sits on the council's own planning pages, usually as a validation requirements document with a matrix of development types against documents. Read the version currently in force rather than a copy saved from a previous project.

Typical local requirements include a Planning Statement above a stated scale, a tree survey where trees are on or adjacent to the site, a flood risk assessment, a drainage strategy, an ecology report, a heritage statement for anything affecting a designated asset, a transport statement, a parking layout, a contaminated land screening assessment on previously developed land, an energy statement, a daylight and sunlight assessment for infill in dense areas, and photographs of the site and its context.

Items on a local list must be reasonable, necessary and relevant to the application. Where a council asks for something plainly disproportionate to the scheme, say so in writing with reasoning before submission rather than arguing after refusal to validate.

Fees and the errors that cause a shortfall

Fees come from the national fee regulations, were uplifted in December 2023 and are now indexed annually, so take the figure from the current published schedule rather than from memory.

The recurring errors are arithmetic rather than legal. Floorspace measured externally when it should be gross internal, or the reverse. Dwelling numbers counted wrong where a conversion creates a net gain. Site area rounded down. Category chosen as an outline application when the submission is full. Free go entitlement claimed when the earlier application was withdrawn rather than refused. A shortfall of a few pounds stops validation as effectively as a missing report.

In a charging area, the Community Infrastructure Levy additional information form is usually a validation requirement even where the development is not liable.

Documents that vary by constraint

Constraints drive most of the document list, and they can be checked before you draw anything.

Constraint Document usually required
Flood Zone 2 or 3, or a site of one hectare or more Flood risk assessment and drainage strategy
Trees on or near the site Survey to BS 5837:2012 with a tree protection plan
Listed building, conservation area or scheduled monument nearby Heritage statement proportionate to significance
Previously developed or potentially contaminated land Phase 1 desk study, prepared by a qualified person
Protected species potential Preliminary ecological appraisal, with seasonal surveys to follow
Most development granting permission Biodiversity gain statement and metric output

Several of those reports require a licensed or competent professional as a matter of law, and land contamination and biodiversity net gain are among them. A Biodiversity Net Gain Assessment has to be completed by a competent person and approved by the council through a biodiversity gain plan.

A final pass before you submit

Ten minutes with this list saves a fortnight.

  1. Every drawing has a number, a revision, a scale, a scale bar and a north point, and the drawing schedule in the covering letter matches the files uploaded.
  2. The red line includes all land needed for access, visibility and drainage.
  3. The certificate signed matches the red line, and notices were served before the application date.
  4. The fee has been recalculated from the current schedule against the final floor areas.
  5. Every local list item for this development type is either provided or addressed in a short written justification for omission.
  6. The biodiversity gain statement is included and consistent with the ecology report.
  7. File names are readable, files are under the portal size limit, and nothing is password protected.
  8. The description of development matches the drawings and the fee category.

Send the covering letter with a document schedule. Validation officers work through lists, and giving them yours makes their job faster.

This is general guidance, not legal advice. Check the position with your local planning authority or a qualified professional before relying on it.

You can browse the report types by category and draft the supporting documents from a postcode. PlanScope provides AI-assisted draft reports for planning applications. Reports should be reviewed before submission. We do not guarantee planning approval.

Frequently asked questions

What are the national validation requirements?

The completed standard application form, a plan identifying the land with the site edged red, other plans and drawings needed to describe the development, the correct fee, and the ownership certificate with the agricultural holdings declaration. A Design and Access Statement is required for major development and in certain conservation area and World Heritage Site cases, along with a biodiversity gain statement.

Can a council refuse to validate an application over a local list item?

Yes, where the item is on the published local list and is reasonable, necessary and relevant to the application. The list must be reviewed at least every two years. If you think a requirement is disproportionate to the scheme, write to the council before submitting with your reasoning rather than arguing after the application has been returned.

What scale should a location plan be?

Normally 1:1250 for most sites, or 1:2500 for larger or rural ones. The application site is edged red, and any other land in the applicant's ownership or control is edged blue. The plan needs a north point and a scale bar, and it must be printed at the stated scale rather than resized during export.

What is the biodiversity gain statement?

A statement submitted with most planning applications saying whether the applicant believes the biodiversity gain condition applies, and where it does, providing the pre-development biodiversity value information including the completed statutory metric and a plan of on-site habitat. It became a validation requirement following the Environment Act 2021 regime, and it must be consistent with the ecology report.

How do I avoid a fee shortfall?

Recalculate from the current published fee schedule against the final floor areas rather than from a previous project. Check whether floorspace should be measured gross internally or externally for your category, count net dwelling gain correctly on conversions, and confirm any free go entitlement applies. Fees are indexed annually, so an old figure will usually be short.

Sources and further reading

validationplanning applicationchecklistdrawingsfees

This article is general guidance about the planning system in England and, where stated, the rest of the UK. It is not legal or professional advice. Check your local planning authority’s validation requirements and take professional advice for your specific site.

More in Templates, Checklists and Examples

View all →
Templates, Checklists and Examples7 min read

Checklist for responding to planning objections

An applicant's response to objections is a sorting exercise first. Answer the material points with dimensioned evidence, acknowledge private law issues in one neutral sentence, and offer conditions where you cannot prove a point.

Read article →
Templates, Checklists and Examples6 min read

Checklist for handover of planning documents at completion

The planning file handed over at completion is what a buyer's solicitor asks for years later. Here is the index, and the records that are hardest to recreate.

Read article →
Templates, Checklists and Examples7 min read

Checklist for a tree works application under a TPO

TPO applications are free and decided in eight weeks, but vague descriptions get them refused. Here is the evidence that gets consent granted as proposed.

Read article →
Templates, Checklists and Examples7 min read

Checklist for a demolition prior notification submission

A demolition prior notification is narrow by design. The authority can consider only the method of demolition and the proposed restoration of the site.

Read article →
Templates, Checklists and Examples7 min read

Checklist for a larger home extension prior approval

A single storey rear extension deeper than 3m on a semi, or 4m on a detached house, needs prior approval under Class A. Here are the limits, the information to supply and how the neighbour consultation timetable works.

Read article →
Templates, Checklists and Examples7 min read

Checklist for responding to an invalid application notice

Until an application is validated there is no determination clock. Here is how to sort each item on an invalidity notice, decline requests that are not on the published local list, and protect the validation date.

Read article →