Noise, Air, Odour and Light

Verifying a NOx model against local monitoring data

7 min readBy PlanScope Editorial Team

Verification decides whether a predicted nitrogen dioxide concentration is evidence or arithmetic. A step-by-step account of deriving and applying the adjustment factor, and the questions a reviewer should ask.

Model verification for nitrogen dioxide is the step that decides whether the rest of an air quality chapter means anything. A dispersion model predicts road NOx from traffic data and meteorology, those predictions carry systematic error, and verification measures that error against local monitoring and corrects for it. Skip it, or do it badly, and the predicted concentrations at your receptors are arithmetic rather than evidence. Reviewers reading an assessment for a local planning authority should treat the verification section as the first place to look.

Why the correction is needed at all

Road source models underpredict in most United Kingdom applications, and the reasons are structural rather than careless. Emission factors are derived from test cycles that do not match a congested urban junction. Traffic counts are projected. Street canyon effects, roadside turbulence and queue behaviour are simplified. Background concentrations come from mapped estimates at 1 km resolution.

None of that is fixable by better model inputs alone, so Defra's local air quality management technical guidance sets out a verification procedure: compare modelled with measured road contributions at monitoring locations, derive an adjustment factor, and apply it to modelled road NOx before recombining with background.

The correction is applied to the road NOx contribution, not to total NO2. Getting that order wrong is the single most common error in submitted assessments, and it is detectable from the reported numbers alone.

Selecting monitoring locations you can defend

Verification is only as good as the monitoring data behind it. The sites used have to be comparable with the modelled receptors in the ways that matter.

  • Same calendar year as the model base year, with full data capture or a documented annualisation.
  • Diffusion tube results bias adjusted, stating whether the factor came from a local co-location study with a reference analyser or from the national bias adjustment spreadsheet, and which version.
  • Distance from the kerb measured rather than estimated, and modelled at the same distance and height as the tube.
  • A spread of road types, since one factor derived entirely from open rural roads will not serve a canyon.
  • Enough sites to see a pattern. Verification against a single tube is not verification, it is a coincidence.

Where the host authority has few tubes, look at the neighbouring authority's network and at automatic monitoring stations within a comparable setting. An assessment that says no local monitoring exists, in a borough with a published annual status report, invites the reviewer to check.

Separating the road contribution from background

The arithmetic is unforgiving about double counting, and this is where careful work shows.

Take the bias adjusted measured NO2 at each site. Convert to measured total NOx, then subtract the background NOx for that grid square to leave the measured road NOx. Model the road NOx at the same point from your source inventory. The two road NOx figures are the comparison.

The step practitioners miss is sector removal. Defra's background maps include a road traffic component, so where your model already represents those roads explicitly, the corresponding sector has to be stripped out of the mapped background before subtraction. Leave it in and you inflate the measured road contribution, which flatters the model and produces an adjustment factor that is too low.

Conversion between NOx and NO2 uses Defra's calculator, and the version, region and year selected all change the answer. State them. A reviewer who cannot tell which calculator version was used cannot reproduce the figure, and reproducibility is the point of the exercise.

Deriving and applying the adjustment factor

With paired measured and modelled road NOx values, the factor is the ratio between them, usually taken as the gradient of a regression through the origin across all sites rather than an average of individual ratios.

Apply the resulting factor to modelled road NOx at every receptor, add the background, and convert the total to NO2. Then report the same table twice: modelled against measured before adjustment, and after. The second table shows whether the correction has actually improved agreement or merely moved the error around.

Where sites split into clear groups, a single factor may be the wrong answer. Separate factors for canyon and open road sections are defensible if the grouping is explained and each group has enough sites to support a gradient. Separate factors chosen to make individual receptors comply are not defensible, and a reviewer should ask why the grouping follows the receptors rather than the geography.

How much adjustment is too much

A factor close to one suggests the model is performing well. A large factor is a signal, and the proper response is to interrogate the inputs rather than to apply the number and move on.

Factor range What it usually means Reasonable response
Close to one Model performing well against local data Report and proceed
Moderately above one Typical underprediction for urban roads Apply, with a note on likely causes
Well above one, say beyond a doubling Probable input error or missing source Re-check traffic data, speeds, canyon treatment, background sector removal
Below one Model overpredicting, or background double counted Check sector removal and tube bias adjustment before accepting

Defra's guidance also asks for a measure of agreement rather than a single ratio. Root mean square error between modelled and measured concentrations, compared against the annual mean nitrogen dioxide objective of 40 micrograms per cubic metre, gives the reviewer a sense of scale: an error of a few micrograms is a different proposition from an error approaching a quarter of the objective, and the guidance expects justification as the error grows.

Honest reporting of a poor fit is better than a suspiciously tidy one. I have more confidence in an assessment that says agreement was imperfect at two of five sites and explains why than in one reporting near-perfect agreement at every tube.

Reporting verification so it can be checked

The verification section should be reproducible by a competent reader with the same inputs. That means a table of monitoring sites with grid references, site type, distance from kerb, raw and bias adjusted concentrations, data capture and annualisation. It also means the background values used and the sectors removed, the calculator version, the modelled and measured road NOx, the derived factor, and the before and after comparison.

Put it in the main report rather than an appendix nobody opens. The same discipline applies to measurement based assessments generally, as with the duration and position questions discussed in our note on unattended noise monitoring.

Where the assessment supports a planning application, the verification evidence belongs with the submitted Air Quality Assessment rather than being held back for the consultation response.

What a reviewer should challenge

Working through a submitted chapter, these are the questions that most often change the conclusion.

  1. Was the factor applied to road NOx, or wrongly to total NO2?
  2. Was the road sector removed from the mapped background before deriving measured road NOx?
  3. Which bias adjustment factor was used, from which source, and for which year?
  4. Do the modelled verification points match the tube positions in distance and height?
  5. Does the base year of the traffic data match the monitoring year?
  6. How many sites support the factor, and does the scatter justify a single gradient?
  7. Is the calculator version stated, with the region and year?
  8. If no verification was carried out, what is the stated justification, and does the authority's own monitoring contradict it?

Those questions apply equally to assessments of combustion plant, where stack height and dispersion assumptions carry the same burden of proof, as covered in our note on chimney heights and biomass boilers, and to small commercial schemes where traffic generation drives the result, as in our piece on air quality assessment for a drive-through unit.

A reviewer is entitled to ask for the model files. Competence in this field is judged on method rather than conclusion, and the directory of professional reviewers exists for exactly this sort of sign-off.

Draft the surrounding assessment on PlanScope, then have the modelling and verification prepared and checked by a suitably qualified air quality specialist. PlanScope provides AI-assisted draft reports for planning applications. Reports should be reviewed before submission. We do not guarantee planning approval. For specialist technical reports, qualified professional input may be required.

Frequently asked questions

Should the adjustment factor be applied to road NOx or to total NO2?

To modelled road NOx, before the background is added and the total converted to nitrogen dioxide. Applying a factor to total NO2 corrects the background as well as the road contribution, which is wrong because the background came from measurement-based maps rather than from your model. This error is detectable from the reported figures alone.

Why does the road sector have to be removed from the background?

Because Defra's mapped background values already include a road traffic component. Where your model represents those roads explicitly, leaving the sector in the background double counts them. The measured road contribution then looks larger than it is, the model appears to perform better, and the adjustment factor comes out too low.

How many monitoring sites are needed for verification?

Enough to show a pattern rather than a coincidence, and enough to represent the road types being modelled. One diffusion tube cannot support a factor applied across a study area. Where the host authority has few tubes, look at neighbouring authority networks and automatic stations in comparable settings before concluding that no data exists.

What adjustment factor is too large to accept?

There is no hard cut-off, but a factor far from one is a signal to check inputs rather than a licence to correct. Beyond roughly a doubling, review traffic flows and speeds, canyon treatment, source geometry and background sector removal. A factor below one usually points to double counted background or a bias adjustment problem.

How is agreement between modelled and measured values reported?

By tabulating paired values before and after adjustment and reporting a measure of error, commonly root mean square error, against the annual mean nitrogen dioxide objective of 40 micrograms per cubic metre. That lets a reader judge scale. An error of a few micrograms reads very differently from one approaching a quarter of the objective.

What if the model cannot be verified because no local monitoring exists?

Say so explicitly and explain what was checked, including neighbouring authority networks and automatic monitoring in similar settings. Then present the unverified results with that caveat and additional sensitivity testing. An unsupported claim that no data exists, in an area publishing annual status reports, undermines the whole chapter.

Sources and further reading

air qualitynitrogen dioxidedispersion modellingverificationdiffusion tubespeer review

This article is general guidance about the planning system in England and, where stated, the rest of the UK. It is not legal or professional advice. Check your local planning authority’s validation requirements and take professional advice for your specific site.

More in Noise, Air, Odour and Light

View all →
Noise, Air, Odour and Light6 min read

When vibration is assessed in a planning application

Human response and building damage thresholds differ by more than an order of magnitude, so the two assessments need separate sections and separate criteria.

Read article →
Noise, Air, Odour and Light7 min read

Predicting construction noise under BS 5228

Four inputs drive a BS 5228 construction noise prediction, and on-time percentages are the one most often got wrong. How the calculation and the criteria work.

Read article →
Noise, Air, Odour and Light7 min read

Delivery and servicing hours conditions on noise grounds

Delivery noise is short, loud events that a BS 4142 rating level dilutes, which is why authorities restrict hours instead. How to assess the events, mitigate them and negotiate the hours.

Read article →
Noise, Air, Odour and Light7 min read

Part O overheating against closed-window noise mitigation

Approved Document O rules out open windows above 40 dB LAeq at night, while acoustic conditions usually cite BS 8233's 30 dB. That 10 dB gap is where most urban infill sits, and it has to be resolved before submission.

Read article →
Noise, Air, Odour and Light7 min read

Lighting design where bats are present

All UK bat species are European protected species, so a lighting layout on a site with bats is an ecological document first. What the plan must show and how the condition should be worded.

Read article →
Noise, Air, Odour and Light7 min read

Vertical illuminance at a window and the curfew

Vertical illuminance at a neighbouring window decides most light trespass objections, and the limit drops after the curfew hour. How the calculation plane is set, which zone applies and what mitigation moves the figure.

Read article →