Transport, Highways and Parking

Visibility splays and stopping sight distance

7 min readBy PlanScope Editorial Team

A new access stands or falls on the visibility splay. Here is how the x and y distances are set, why measured speeds matter more than the speed limit, and what to do when the splay crosses land you do not own.

A visibility splay for a new access is a triangle of land that has to be kept clear so a driver leaving your site can see approaching traffic, and so approaching traffic can see them. It is defined by two measurements. The x distance sets how far back from the carriageway the driver's eye sits, and the y distance sets how far along the road they must be able to see in each direction. Most refusals on access grounds come down to the y distance being too short for the speed of traffic, or the splay crossing land the applicant does not control.

Both problems are solvable. Neither is solvable after the drawings are submitted.

What a visibility splay is and how it is measured

Picture the access from above. A point sits on the centre line of the access, set back from the nearside edge of the carriageway by the x distance. From that point, two lines run out to meet the nearside edge of the carriageway at the y distance in each direction. The triangles between those lines and the road are the splays, and they must be free of obstruction.

The measurement is three-dimensional, not two. Visibility is assessed between a driver's eye height above the access surface and an object height above the carriageway, both measured vertically. Design guidance for lightly trafficked streets commonly uses an eye height of 1.05 metres and an object height of 0.6 metres, which is why a low wall, a parked car or a rising verge can block a splay that looks clear on plan.

So levels matter. On a site where the access rises away from the road, or where the verge is crowned, a splay that works on a flat plan can fail on a section. Draw the section if the ground is anything other than level.

Where the x and y distances come from

The x distance is a set-back that allows the driver to stop clear of the carriageway while still seeing along it. For residential accesses onto lightly trafficked streets 2.4 metres is the figure usually applied, with 2.0 metres sometimes accepted in low-speed situations where the authority agrees. Shorter set-backs push the driver's eye closer to moving traffic and are resisted.

The y distance derives from stopping sight distance, which is the distance a driver needs to perceive a hazard, react and brake to a stop. Stopping sight distance rises steeply with speed, which is why the arithmetic is unforgiving on fast roads. Design guidance for streets gives figures of the order of 25 metres at 20 mph and 43 metres at 30 mph, with substantially higher values above that taken from the relevant design standard. Take the current figures from the standard the highway authority applies, because the tables are revised and local authorities publish their own requirements.

The combination is written as x by y, so "2.4 by 43 metres" describes a standard residential access onto a 30 mph street.

Speed surveys and recorded speeds against the limit

This is where money is saved. Design guidance bases sight distance on the speed traffic actually travels at, usually expressed as the eighty-fifth percentile wet weather speed, not on the posted limit.

On many rural lanes and on tight urban streets, recorded speeds sit well below the limit because the geometry prevents anything faster. A seven-day automatic traffic count at or close to the proposed access gives you the distribution, and a y distance derived from a measured 24 mph is far shorter than one derived from an assumed 30 mph.

Two cautions. Survey in a neutral period, avoiding school holidays and roadworks, and record the dates. And accept the result if it goes against you: a survey showing speeds above the limit raises the requirement rather than lowering it. Our note on traffic counts in neutral months and survey validity sets out what makes a count defensible.

Splays across land you do not own

A splay has to be deliverable. Where part of the triangle falls on a neighbour's garden, a farmer's field or an unadopted verge, you need to be able to secure it and keep it clear.

Three routes exist. The land may already be public highway, in which case the authority controls it and the splay is achievable, subject to any street furniture or planting in the way. Our note on checking the extent of the public highway explains how to establish that, and it is the first check to make. The land may be acquired or made subject to an agreement with the owner, which then supports the correct ownership certificate on the application form and a notice served on that owner. Or the works may be delivered under a highway agreement with the authority where the land is to be dedicated.

What does not work is a condition requiring a splay over land outside your control with no agreement behind it. A condition of that kind needs a reasonable prospect of being carried out, and an officer who spots the problem will recommend refusal rather than impose it.

Hedges, walls and the maintenance condition

Splays fail over time. A hedge grows, a fence is replaced with a taller one, a garden wall is rebuilt, a car is parked on the verge.

Expect a condition in two parts: the splay shown on the approved drawing must be provided before the access is first used, and the land within it must thereafter be kept free of obstruction above a stated height measured from the carriageway level. The stated height comes from the authority's own standard and is set below the sight line.

Where the splay crosses a hedge that has amenity or ecological value, options include setting the hedge back and replanting on the new line, reducing and managing its height, or in some cases retaining individual trees with clear stems where the trunk alone does not block the view. Hedgerow removal may need separate consent, and removal in the breeding bird season brings its own constraints.

Substandard accesses and the betterment argument

Many existing accesses do not meet current standards and never will. The useful arguments are these.

First, betterment. If the proposal improves visibility compared with the lawful existing position, say so with a drawing showing both. Improvement short of the standard is a material consideration.

Second, intensification. If the proposal does not materially intensify use of the access, the highway authority's ability to require a full standard splay is limited. Quantify it: existing lawful use, proposed use, net change in vehicle movements at the peak.

Third, safety record. Ask the highway authority for recorded personal injury collision data for the stretch. Where the record is clean over a reasonable period, that is evidence. Where it is not, you need to deal with it rather than hope it is not raised.

Those three points usually belong in a Transport Statement rather than a full assessment, for a scheme of a few dwellings.

Drawing the splay so the highway officer can check it

Make it checkable in two minutes. Put the splay on a scaled plan at 1:200 or 1:500 with the scale bar shown. Dimension the x and y distances with leader lines. Mark the eye point on the access centre line and the y points on the nearside carriageway edge, in both directions. Show the carriageway edge, the channel line and the verge. Annotate the eye and object heights used, and the speed on which the y distance is based, with the survey reference. Show existing obstructions, including boundary treatments to be removed, and hatch the land to be kept clear.

Add a short note stating the standard applied and the authority's published requirement. Officers approve what they can verify. Our note on turning heads, cul-de-sac length and layout geometry covers the rest of the access geometry that usually arrives in the same consultation response.

This is general guidance rather than legal advice. Confirm the required standard with the local highway authority before fixing a layout, because published requirements vary between authorities.

Enter your postcode on PlanScope to see which documents a new access proposal is likely to need. PlanScope provides AI-assisted draft reports for planning applications. Reports should be reviewed before submission. We do not guarantee planning approval.

Frequently asked questions

What are the x and y distances?

The x distance is the set-back measured from the edge of the carriageway back along the centre of the access, giving the driver's eye position. The y distance is measured from that point along the nearside edge of the carriageway in each direction, and it is derived from stopping sight distance for the speed of traffic. The splay is the triangle between them.

Should the speed limit or the measured speed be used?

Measured speeds, where a survey is available. Design guidance is based on the speed traffic actually travels at, not the posted limit, and on many rural roads the eighty-fifth percentile speed is lower than the limit because of alignment and width. A seven-day automatic traffic count at the access location is the usual evidence and it often reduces the required y distance.

Can a splay cross a neighbour's land?

Only if you can deliver and maintain it. Where the land is in someone else's ownership you need their agreement, and the application must serve notice on them as an owner. A condition requiring a splay over land you cannot control is unlikely to be imposed, because there must be a reasonable prospect of it being achieved.

How high can a hedge be inside the splay?

Vegetation and structures inside the splay are normally restricted to a height measured from the carriageway level, set below the driver's eye line so that an approaching vehicle stays visible. The figure is set by the highway authority and secured by condition, together with a requirement to keep the splay clear in perpetuity. Trees with clear stems are sometimes accepted.

What if the existing access already has poor visibility?

Argue betterment, with evidence. Where an existing lawful access has substandard visibility and the proposal improves it, even without reaching the full standard, that improvement is a material consideration. Pair it with evidence that the proposal does not materially intensify use, and with any recorded collision history obtained from the highway authority.

Sources and further reading

visibility splayaccesshighwaysmanual for streetssight lines

This article is general guidance about the planning system in England and, where stated, the rest of the UK. It is not legal or professional advice. Check your local planning authority’s validation requirements and take professional advice for your specific site.

More in Transport, Highways and Parking

View all →
Transport, Highways and Parking6 min read

What changes in transport evidence at 50 dwellings

Around fifty dwellings, or 2,500 square metres of floorspace, most highway authorities move from wanting a Transport Statement to wanting a full Transport Assessment. The thresholds are local, and the consequences for programme are not small.

Read article →
Transport, Highways and Parking6 min read

Temporary traffic orders for construction works

A construction programme usually needs four separate highway permissions, each under a different power. What each one covers, how long it lasts and what happens when works overrun.

Read article →
Transport, Highways and Parking8 min read

Highway drainage for a new rural access

Highway authorities treat run-off and material transfer onto a rural lane as a safety matter. The design comes down to the levels in the first few metres and the consent position for the roadside ditch.

Read article →
Transport, Highways and Parking7 min read

Car club and travel voucher contributions

The money is simple. The on-street bay needs a traffic regulation order the developer cannot deliver, and the operator may never come forward.

Read article →
Transport, Highways and Parking7 min read

Gated accesses and emergency service override

Three bodies have a view on a gated access: the highway authority, the fire service and the waste service. Design for all three before the driveway is drawn.

Read article →
Transport, Highways and Parking7 min read

Blocking back and queue length at a junction

A capacity ratio tells you how hard an arm is working. Only the queue in metres, compared against measured storage, tells you whether the junction behind will block.

Read article →