Scenario Walkthroughs

Walkthrough: farm diversification to glamping pitches

7 min readBy PlanScope Editorial Team

An illustrative walkthrough of a farm diversification application for eight glamping pods, showing how landscape evidence and foul drainage decided the scheme and what conditions came with the permission.

A glamping site planning application is decided on landscape and drainage far more often than on the principle of diversification. National policy supports sustainable rural tourism and the diversification of agricultural businesses, so the argument is rarely about whether pitches in the countryside can ever be acceptable. It is about this field, this hedge line, this lane and this soakaway.

The walkthrough below is illustrative. It is a composite of the way these applications are normally assembled, not a record of a real holding or a real decision, and the figures in it are examples rather than benchmarks.

The holding and the business case

The illustrative site is a 60 hectare mixed holding in open countryside, outside any designated landscape, with a farmyard reached by a single track lane. The proposal is eight glamping pods in a sloping field behind an existing shelter belt, a shared facilities building in a redundant stone barn, and parking on an existing hardstanding.

The business case did more work in the planning statement than the owners expected. Rural economy policy supports diversification that helps sustain a farm business, so the statement set out the existing enterprise, the seasonal cash flow problem the pitches address, and the reason the pitches sit where they do rather than closer to the lane. Two sentences about local employment are worth less than one paragraph explaining why the holding needs the income.

The application also had to deal with the alternative sites question. Officers ask why the pitches cannot go on the less visible parcel, and the honest answer here was drainage rather than preference, which is a much stronger answer when it is evidenced.

Glamping accommodation sits awkwardly in the use classes. A camping or caravan site is sui generis, so there is no permitted change into it from agriculture, and a material change of use of the land needs planning permission.

Two other regimes bite at the same time. Units that fall within the statutory definition of a caravan, which is a matter of dimensions and of being capable of being moved in one or two pieces, bring a site licence requirement under the Caravan Sites and Control of Development Act 1960. Units built on foundations and connected to services are buildings, which raises building regulations questions instead.

The temporary use right in Part 4 of the GPDO allows land to be used for most purposes for up to 28 days in a calendar year without permission. Some operators start there. It does not support a permanent pitch with a plinth, a services connection and a year-round booking page, and enforcement officers know the difference.

Landscape and visual work

The field slopes towards a ridge that is visible from two lanes and a public footpath. That made a landscape and visual assessment the central document rather than a supporting one.

The scope was agreed with the case officer before any fieldwork: five viewpoints, seasonal photography including winter with the hedges bare, and an assessment of the pods in their proposed colours and finishes. Winter views matter disproportionately on these schemes, because the screening argument usually rests on vegetation that is not there for half the year.

A Landscape and Visual Impact Assessment prepared to the standard industry methodology carries more weight than a design statement with photographs, and councils increasingly ask for one on tourism schemes in open countryside. The assessment led to three changes: the two highest pods moved down the slope, the pale timber finish was replaced with a darker stain, and a new hedgerow was added along the eastern boundary with a management condition.

Access, parking and passing places

The lane is single track with occasional widening. The highway authority asked for visibility at the farm entrance measured against the recorded speed of traffic, two formal passing places within the applicant's control, and an internal turning area so that arriving guests do not reverse into the lane.

Trip generation was dealt with proportionately. Eight pitches generate few movements compared with the farm's own vehicles, and the assessment simply compared the two rather than building a model nobody needed. Where a highway authority accepts that framing, it saves several thousand pounds of unnecessary work.

Parking was kept off the field. One space per pitch on the existing hardstanding, plus two for the facilities building, with a bound surface and no new lighting columns.

Foul drainage where there is no sewer

This is where these applications most often stall. There is no public sewer within reach, so the facilities building discharges to a package treatment plant and then to a drainage field.

Three pieces of evidence were needed. A percolation test to confirm the ground could accept the discharge, a drainage field design sized from that test, and confirmation that the discharge fell within the general binding rules for small sewage discharges rather than needing an environmental permit. Septic tanks discharging directly to a watercourse have not been permissible since the start of 2020, so any scheme relying on an old arrangement has to be upgraded as part of the works.

A Foul Sewage Assessment setting out the calculation, the test results and the position of the drainage field relative to watercourses, boreholes and the pitches themselves is what the environmental health officer wants to see. Do the percolation test in winter if the programme allows. A test on dry summer ground flatters the result and the design fails later.

Ecology and lighting

A preliminary ecological appraisal covered the field, the hedgerows and the barn. The barn produced the only real constraint, in the form of evidence of bat use, which pushed a further survey into the emergence season and delayed the facilities building by a season. Nothing about that is unusual, and building the survey calendar into the programme early is the only defence.

Lighting is the quiet issue on rural tourism schemes. Dark skies, foraging bats and neighbour amenity all point the same way, so the application proposed bollard level lighting on the path network only, with a warm colour temperature, full cut-off optics and a curfew. That approach is easier to justify with a short lighting assessment referencing the environmental zone the site sits in, and it heads off a condition that would otherwise be written more tightly than the operator wants.

A preliminary ecological appraisal is work councils expect a suitably qualified ecologist to carry out, and any bat survey or licence has to come from a licensed ecologist under the habitats regime. Biodiversity net gain applies to the change of use where it is not exempt, and on a grassland baseline the arithmetic is usually manageable with hedgerow and margin creation.

The conditions that came with it

The illustrative permission carried the conditions these schemes usually attract. Occupancy limited to holiday use, with no pitch used as a sole or main residence and a register kept and made available to the council. A seasonal restriction on two of the pitches. Approval of external finishes before installation. Landscaping implemented in the first planting season and maintained for five years. Lighting in accordance with the submitted scheme and no additional lighting without consent.

Read the occupancy condition before you accept it. And read it twice if the site is financed. The difference between a condition limited to holiday occupancy and one that also caps the length of a single stay affects how the business can be run, and it is much easier to negotiate the wording before the decision than to vary it under section 73 afterwards. The same point applies to the conditions discussed in the Class Q barn conversion walkthrough.

PlanScope provides AI-assisted draft reports for planning applications. Reports should be reviewed before submission. We do not guarantee planning approval. For specialist technical reports, qualified professional input may be required. This is general guidance rather than legal advice, so check the position with your local planning authority before relying on it.

Enter your postcode on PlanScope to see which reports a diversification scheme is likely to need.

Frequently asked questions

Do glamping pods need planning permission?

Almost always. A camping or caravan site is a sui generis use, so there is no permitted change from agricultural land and a material change of use needs permission. Units meeting the statutory caravan definition also need a site licence, while units built on foundations raise building regulations questions instead.

Can the 28 day rule be used for a glamping site?

Only where the use really is temporary. Part 4 of the GPDO allows land to be used for most purposes for up to 28 days in a calendar year, which suits an occasional camping field. It does not cover permanent pitches with plinths, service connections and year-round bookings, and councils treat those as a change of use.

What drainage evidence does a rural glamping site need?

A percolation test, a drainage field design sized from it, and confirmation that the discharge falls within the general binding rules for small sewage discharges rather than needing an environmental permit. Septic tanks discharging to a watercourse have not been permissible since the start of 2020, so old arrangements must be upgraded.

Is a landscape and visual assessment always needed?

Not always, but it is the central document wherever pitches are visible from lanes, footpaths or designated landscapes. Agree the viewpoints with the case officer first and include winter photography, because the screening argument usually depends on vegetation that is not in leaf for half the year.

What occupancy conditions do glamping permissions usually carry?

Typically a restriction to holiday use, with no pitch used as a sole or main residence and a register of occupiers kept for the council. Some add a seasonal restriction or a maximum length of stay. Negotiate the wording before the decision, because varying it later needs a section 73 application.

Sources and further reading

glampingfarm diversificationrural planninglandscape assessmentfoul drainagewalkthrough

This article is general guidance about the planning system in England and, where stated, the rest of the UK. It is not legal or professional advice. Check your local planning authority’s validation requirements and take professional advice for your specific site.

More in Scenario Walkthroughs

View all →
Scenario Walkthroughs7 min read

Walkthrough: a boundary wall taken down in a conservation area

An illustrative walkthrough of a Victorian rubble boundary wall demolished without permission in a conservation area, the enforcement response and the specification that secured retrospective consent.

Read article →
Scenario Walkthroughs7 min read

Walkthrough: a shopfront reinstated on a listed building

An illustrative walkthrough of reinstating a historic shopfront on a Grade II listed building, from paint sections and archive photographs to advertisement consent and the accessibility compromise.

Read article →
Scenario Walkthroughs8 min read

A mobile home on a garden plot: a walkthrough

The site licence exemption for a caravan in a garden is about licensing, not planning. Relying on it as a planning answer is the most common mistake in this area.

Read article →
Scenario Walkthroughs7 min read

An air conditioning unit and a neighbour complaint

A unit can be lawful in planning terms and still be abated as a statutory nuisance, and it can need permission while making almost no noise at all.

Read article →
Scenario Walkthroughs7 min read

A holiday let refused on a C3 dwelling: a walkthrough

Nothing physical changed. No extension, no new door, no sign. The entire case turned on the pattern of occupation and the listing's own dated review history.

Read article →
Scenario Walkthroughs7 min read

A scheme that failed on biodiversity net gain

A net gain failure rarely happens at application stage. It happens when the biodiversity gain plan goes in for approval, the authority says no, and the site cannot lawfully start.

Read article →