War memorials: repair, relocation and consent

8 min readBy PlanScope Editorial Team

Repair and added names are routinely consented. Relocation is treated as harm to a deliberately chosen setting. How the consent routes differ, including the faculty system in churchyards.

A war memorial relocation consent question almost always has a shorter answer than people expect, and it is rarely the answer they want. Most freestanding war memorials in England are listed, usually at Grade II, and moving a listed structure needs listed building consent. The policy test then treats the memorial's position as part of what makes it important, so a move is assessed as harm that has to be justified rather than as a neutral relocation.

Repair and the addition of names are a different matter. Both are routinely consented when the detailing is right.

Listing status and who is responsible

Start with the National Heritage List for England. Search by place rather than by name, because memorials are often listed under a street or a parish rather than under the wording on the plinth. The list entry tells you the grade, the date of listing and the extent of what is protected, and the extent sometimes includes railings, steps and a surrounding enclosure.

Some memorials are scheduled monuments rather than listed buildings, particularly where they sit on an earlier monument or within an earthwork. That changes the consent regime entirely, because works to a scheduled monument need scheduled monument consent from the Secretary of State under the Ancient Monuments and Archaeological Areas Act 1979, and there is no local authority route.

Ownership is the harder question. A great many memorials were put up by subscription a century ago by committees that have long since dissolved, and no title can be traced. The War Memorials (Local Authorities' Powers) Act 1923 gives local authorities express power to spend money on maintaining, repairing and protecting war memorials in their area, whether or not they own them, and parish and town councils have used it for decades. That power does not make the council the owner, and it does not remove the need for consent.

Where no owner can be found, the practical route is for the parish or district council to take on the works with the agreement of the landowner whose land it stands on. Document that agreement. A grant funder will ask for it before anything else.

Cleaning and repair without doing harm

More damage is done to war memorials by well-intentioned cleaning than by neglect. Three rules carry most of the weight.

Never use abrasive or high-pressure methods on stone. Grit blasting and pressure washing open the surface of limestone and sandstone, which then holds water and weathers faster, and the loss is permanent.

Do not repoint with a cement-rich mortar. The same frost mechanism that spalls historic brick spalls the dressed stone of a plinth, and on a memorial the spalling takes the lettering with it.

Treat biological growth slowly. A gentle wash and, where needed, a biocide applied by someone who has used it on stone before, repeated over a season, achieves more than a single aggressive clean.

Routine like-for-like repair to a listed memorial may not need consent where it does not affect the character of the structure, but the margin is narrow and councils take a dim view of judgement calls made in hindsight. A short email to the conservation officer with photographs and a method statement takes a week and settles it. Historic England publishes specific guidance on war memorial conservation, and quoting the relevant section in that email tends to shorten the conversation.

Adding names and re-lettering

Adding a name is the most common intervention and the most commonly consented. The memorial exists to commemorate, so adding a name that was omitted, or adding the names of a later conflict, works with its purpose rather than against it.

What determines the outcome is the lettering. Four points matter:

  • match the letterform, not an approximation of it, using a letter-cutter who has recorded the original
  • match the depth and the cutting technique, hand-cut against machine-cut
  • find space within the existing design discipline rather than squeezing a line into a margin
  • avoid applied plaques and stick-on lettering on a stone face

Re-cutting worn inscriptions is more contentious. Deepening an eroded letter removes original material and resets the memorial's apparent age, and conservation advice generally prefers recording the inscription and leaving the erosion. Where legibility has gone entirely, an interpretation panel nearby is usually the preferred answer rather than re-cutting.

A paper record of the inscription before any work is standard practice, and on a memorial with substantial historic interest the council may ask for Historic Building Recording to an agreed level.

Relocation and why policy resists it

Memorials were sited deliberately. A crossroads, a churchyard gate, the centre of a village green, the approach to a works entrance. That siting is part of the historic interest, and Historic England's position, which councils follow closely, is that relocation should be a last resort.

The legal framework reinforces it. Section 16 of the Planning (Listed Buildings and Conservation Areas) Act 1990 requires the decision maker to have special regard to the desirability of preserving the listed structure and its setting, and the courts have held that duty carries considerable importance. National heritage policy then requires clear and convincing justification for harm, with substantial harm permitted only in exceptional circumstances.

Three justifications do succeed in practice. The memorial is at real risk in its current position, from vehicle strike or from ground movement. The context that gave the siting meaning has gone, for example where a works has been demolished and the site built over. Or the move returns the memorial to a position closer to its original one.

Three that generally fail. The memorial is inconvenient for a highway scheme. A developer wants the site. The parish would prefer it somewhere more visible. Where a highway scheme is the driver, expect the authority to be asked why the scheme cannot be redesigned around the memorial, and expect that question to be asked at committee.

If relocation is pursued, the application needs a Heritage Statement that assesses the significance of the current setting specifically, not just of the memorial as an object. That is the section most applications get wrong.

Setting, paving and railings

Works around a memorial attract less attention than works to it, and cause as many problems.

Resurfacing the area in a different material changes the setting. So does removing a kerbed enclosure, adding a bin or a cycle stand, planting a tree that will overhang in fifteen years, or installing lighting that throws the lettering into shadow. Where the enclosure or railings are mentioned in the list entry, they are part of the listed structure and need consent in their own right.

Railings removed during the Second World War are a recurring question. Reinstatement is normally welcomed where the original pattern can be evidenced from a photograph or a surviving fragment, and resisted where the design is a modern invention in a vaguely period style.

Churchyards and the faculty route

A memorial in the churchyard of a Church of England church is very likely outside the listed building consent system altogether. The ecclesiastical exemption removes certain church buildings and their curtilage structures from listed building control, and consent comes instead through the faculty jurisdiction, by petition to the diocesan chancellor through the archdeacon and the diocesan advisory committee.

That route runs on its own timetable and has its own evidence expectations, and it is not interchangeable with a council application. Planning permission can still be needed for works in the churchyard that amount to development, so on a scheme involving new paving, lighting or an access ramp you may be dealing with both systems at once. Ask the parish which route applies before preparing anything, because the exemption's scope depends on the denomination and on the structure.

Sequencing permissions and funding

The order that works is fixed by the funders rather than by the councils:

  1. Establish designation and the extent of what is protected
  2. Establish who owns the land and who will hold the contract
  3. Commission a condition survey and a method statement from a conservation-accredited specialist
  4. Obtain consent, whether listed building consent, scheduled monument consent or a faculty
  5. Apply for grant funding, which normally requires consent to be in place or at least applied for
  6. Record the memorial before, during and after the works

Grant programmes for war memorial repair run to annual deadlines and most require a specification prepared by someone with conservation experience, so the specialist comes before the money rather than after it.

For a Grade I or II* memorial, the referral requirements add a stage, and our note on Grade I and II* applications covers who has to be consulted. The same instinct to keep original material rather than renew it runs through the case for keeping historic window glass.

Browse the report types to see which heritage documents a consent application of this kind usually needs.

This is general guidance, not legal advice. Check the position with your local planning authority, the diocese where the memorial stands in a churchyard, or a qualified conservation professional before relying on it. PlanScope provides AI-assisted draft reports for planning applications. Reports should be reviewed before submission. We do not guarantee planning approval.

Frequently asked questions

Do I need consent to move a war memorial?

Almost always. Most freestanding war memorials in England are listed, so relocation needs listed building consent, and the siting is treated as part of the historic interest. Where the memorial is a scheduled monument, scheduled monument consent is needed from the Secretary of State instead, with no local authority route available.

Can names be added to a listed war memorial?

Yes, and it is the intervention councils agree most readily, because commemoration is the memorial's purpose. The outcome turns on the lettering. Match the letterform, the depth and the cutting technique, find space within the existing design rather than crowding a margin, and avoid applied plaques on a stone face.

Who is responsible for maintaining a war memorial?

Often nobody identifiable, because the subscription committees that erected them dissolved long ago. The War Memorials (Local Authorities' Powers) Act 1923 lets local authorities spend money on maintaining and repairing memorials in their area whether or not they own them. That power does not transfer ownership or remove the need for consent.

How should a stone memorial be cleaned?

Gently and slowly. Avoid grit blasting and pressure washing, which open the surface of limestone and sandstone and accelerate weathering. Use a gentle wash and, where biological growth needs treating, a biocide applied by someone experienced with stone, repeated over a season rather than in one aggressive clean.

What applies to a memorial in a churchyard?

The ecclesiastical exemption may remove it from listed building control, with consent coming instead through the faculty jurisdiction by petition to the diocesan chancellor. That route has its own timetable and evidence requirements. Planning permission can still be needed for development in the churchyard, so both systems may apply at once.

Sources and further reading

war memorialslisted buildingsheritagelisted building consentconservation

This article is general guidance about the planning system in England and, where stated, the rest of the UK. It is not legal or professional advice. Check your local planning authority’s validation requirements and take professional advice for your specific site.

More in Heritage and Archaeology

View all →
Heritage and Archaeology6 min read

Historic graffiti, marks and recording obligations

Protective marks, taper burns and scratched dates are evidence, and routine repair destroys them first. How to find them, record them properly and secure it by condition.

Read article →
Heritage and Archaeology8 min read

Archaeological evaluation on small householder sites

National policy requires no more archaeological evidence than is sufficient to understand the impact. How to show your foundations stop above the deposits, and what a domestic watching brief actually involves.

Read article →
Heritage and Archaeology9 min read

Traditional shopfront reinstatement in a conservation area

Authorities welcome shopfront reinstatement and still refuse it when the fascia is too deep or the shutter box sits above the cornice. How to evidence the original design and draw the submission properly.

Read article →
Heritage and Archaeology8 min read

Change of use and the significance of a listed building

The harm in a listed building conversion comes from the alterations the new use requires rather than the use itself. How to assess plan form, service routes and the regulatory package, and how to compare candidate uses.

Read article →
Heritage and Archaeology7 min read

Listed building consent for partial demolition

Works to part of a listed building are alteration under the Shimizu reasoning, so the test is whether character is affected. How to assess the fabric being lost and what the authority will weigh.

Read article →
Heritage and Archaeology6 min read

Treasure, finds and the landowner's position

Treasure vests in the Crown and must be reported within 14 days. Everything outside the statutory definition belongs to the landowner, not the finder.

Read article →