The well-being duty in Welsh planning decisions

7 min readBy PlanScope Editorial Team

Welsh planning sits on a statutory sustainable development duty with no English equivalent. What the five ways of working require, and how to evidence them in a submission.

This article is about Wales. Welsh planning decisions are taken within a statutory framework that has no English equivalent, and the well-being of future generations planning wales duty is the piece that most often surprises practitioners crossing the border. Public bodies in Wales, local planning authorities included, must carry out sustainable development in the way the Well-being of Future Generations (Wales) Act 2015 defines it, and that shapes both how policy is written and how an application is argued.

It is not a material consideration bolted onto an English style decision. It sits underneath the whole system.

The well-being goals and the sustainable development principle

The 2015 Act sets seven well-being goals covering prosperity, resilience, health, equality, cohesive communities, culture and the Welsh language, and global responsibility. Public bodies must set objectives and take reasonable steps to meet them.

The Act also defines the sustainable development principle, which requires a body to act in a manner seeking to ensure that present needs are met without compromising the ability of future generations to meet theirs. That principle is given content by five ways of working: looking to the long term, preventing problems occurring or getting worse, integrating objectives across bodies, collaborating with others, and involving people with an interest.

Those five are the operative part for planning. A decision that considers only the immediate effects of a proposal, without addressing prevention, integration, collaboration or involvement, has not applied the principle as the Act describes it.

How the duty reaches a planning decision

The duty sits on the authority as a public body rather than on the applicant, and the Planning (Wales) Act 2015 reinforces the point by tying the purpose of the planning system to sustainable development.

In practice it reaches applications through three routes. Development plan policies in Local Development Plans are written to deliver well-being objectives, so the plan itself carries the duty into decision making. Officer reports are expected to show how the recommendation relates to those objectives. And national policy requires the duty to be reflected in how proposals are assessed.

That produces a different kind of officer report from the English equivalent. Where an English report works through the development plan policies and then the material considerations, a Welsh report is more likely to frame the analysis against well-being objectives and the placemaking principles in national policy.

Placemaking as the organising idea

Planning Policy Wales places placemaking at the centre of the system and asks that proposals contribute to creating sustainable places. Future Wales, the national development framework, sits above the development plan and sets the national spatial strategy.

Placemaking in the Welsh sense covers more ground than design quality. It takes in the mix of uses, active travel provision, access to services, the Welsh language and culture, health, and the long term resilience of the place. A design and access statement that addresses appearance and layout and stops there answers only part of it.

The practical consequence is that a Welsh application benefits from a narrative running from placemaking principles through to the specifics of the scheme, rather than a policy compliance table. Officers use that narrative, and its absence is noticed.

Evidencing the duty in a planning statement

Applicants cannot discharge a duty that sits on the authority. What they can do is give the authority the material it needs, which is a more useful way to think about it than treating the duty as a hurdle.

What works in a Welsh planning statement:

  • a section mapping the scheme's effects against the seven well-being goals, honestly, including the goals it does not advance
  • evidence of involvement, which means who was consulted, what they said and what changed
  • long term considerations addressed explicitly: climate resilience, adaptability of the buildings, lifespan of the materials
  • prevention framed around the problems the scheme avoids rather than the benefits it claims
  • integration with other public body objectives, such as health board or transport authority plans where relevant
  • a Welsh language consideration where the scheme is of a scale or location where language is a planning issue

Keep it proportionate. On a householder application this is a paragraph. On a major residential scheme it is a section with evidence behind each point.

Statutory pre-application consultation

Wales has a requirement England does not, and it catches developers moving across the border.

For major development, statutory pre-application consultation is required before the application is submitted. The applicant must consult specified bodies, publicise the proposal locally, allow a set period for responses, and submit a pre-application consultation report with the application setting out what was said and how it was taken into account.

That is not a courtesy exercise. An application submitted without the report is liable to be invalid, and the timetable consequence is significant, because the consultation period has to run before submission rather than alongside determination. Build it into the programme at the outset.

It also dovetails with the involvement way of working under the 2015 Act, which means the same exercise serves two purposes if it is designed properly rather than treated as a notice to be posted.

National policy and the Technical Advice Notes

The policy hierarchy differs from England's and the documents have different names.

Document Role
Well-being of Future Generations (Wales) Act 2015 Statutory duty and the sustainable development principle
Planning (Wales) Act 2015 Plan led system, pre-application consultation, purpose of planning
Future Wales: the National Plan National development framework, part of the development plan
Planning Policy Wales National planning policy, organised around placemaking
Technical Advice Notes Topic guidance, for example on flooding, noise and the Welsh language
Local Development Plan The authority's plan, against which applications are determined

Two cautions on citation. Planning Policy Wales is issued in numbered editions and revised, so state the edition. And the Technical Advice Notes have been revised at different times, with the flooding note in particular subject to changes in the version in force, so verify which applies at the date of your submission rather than relying on a precedent document.

Where the proposal affects a listed building, the consent regime and the role of the Welsh heritage body differ as well, and that is covered in our note on listed building consent in Wales and the role of Cadw.

What applicants should actually submit

The practical answer is narrower than the statutory framework suggests.

  1. A planning statement that engages with the Local Development Plan policies by number and with the placemaking principles in national policy.
  2. A well-being section, proportionate to the scheme, mapping effects against the goals and the five ways of working.
  3. The pre-application consultation report where the development is major, with the responses and the changes made.
  4. A design and access statement that covers the placemaking dimensions rather than appearance alone.
  5. Evidence of involvement that goes beyond a site notice, where the scheme is of a scale that merits it.
  6. Welsh language considerations where the plan or the Technical Advice Note engages them.

An honest note on the limits of automated drafting here. PlanScope's report generation is grounded in the National Planning Policy Framework and English local plans, so a Welsh application needs the national policy framework, the Technical Advice Notes and the well-being duty checked and supplied by the reviewer rather than assumed from the draft. Scotland's framework differs again, and the contrast is drawn in our note on flood risk under NPF4 in Scotland and the avoidance principle.

PlanScope provides AI-assisted draft reports for planning applications. Reports should be reviewed before submission. We do not guarantee planning approval. For specialist technical reports, qualified professional input may be required. This is general guidance and not legal advice, so check the position with the local planning authority or a qualified professional in Wales before relying on it.

Browse the 66 PlanScope report types to see which supporting documents a scheme of this kind usually carries.

Frequently asked questions

Does the well-being duty apply to applicants or to the council?

To the council, as a public body under the Well-being of Future Generations (Wales) Act 2015. Applicants cannot discharge it. What they can do is supply the material the authority needs to show it has applied the sustainable development principle and the five ways of working in its report.

What are the five ways of working?

Looking to the long term, preventing problems occurring or getting worse, integrating objectives across public bodies, collaborating with others, and involving people with an interest in achieving the well-being goals. For planning these are the operative part of the duty, because they describe what the decision has to demonstrate.

Is statutory pre-application consultation required in Wales?

Yes, for major development. The applicant must consult specified bodies, publicise the proposal, allow the set response period, and submit a pre-application consultation report with the application. The period runs before submission rather than alongside determination, so it has to be programmed from the outset.

How does Welsh national policy differ from English policy?

Planning Policy Wales, issued in numbered editions, is the national policy document and is organised around placemaking. Future Wales is the national development framework and forms part of the development plan. Technical Advice Notes provide topic guidance in place of English Planning Practice Guidance chapters.

Should a planning statement address the well-being goals directly?

Yes, proportionately. Map the scheme's effects against the goals, including those it does not advance, and address the ways of working: long term resilience, problems prevented, integration with other public body plans, and evidence of who was involved and what changed as a result.

Can an England grounded draft be used for a Welsh application?

Only as a starting point. Drafting grounded in the English framework and English local plans will not carry Planning Policy Wales, the Technical Advice Notes or the well-being duty, so those have to be checked and supplied by the reviewer. A document arguing English policy in a Welsh application is readily apparent to an officer.

Sources and further reading

waleswell-being dutyplacemakingplanning policy walespre-application consultation

This article is general guidance about the planning system in England and, where stated, the rest of the UK. It is not legal or professional advice. Check your local planning authority’s validation requirements and take professional advice for your specific site.

More in Wales, Scotland and Northern Ireland

View all →
Wales, Scotland and Northern Ireland7 min read

Householder permitted development in Northern Ireland

Extensions, outbuildings and dormers in Northern Ireland are governed by the Planning (General Permitted Development) Order (Northern Ireland) 2015, not the England Order. The differences are substantive.

Read article →
Wales, Scotland and Northern Ireland7 min read

The two tier planning system in Northern Ireland

Eleven councils determine most applications and the Department for Infrastructure takes the regionally significant ones. The category decides the consultation, the decision-maker and the appeal route.

Read article →
Wales, Scotland and Northern Ireland7 min read

Notification of planning applications to Scottish Ministers

Notification bites after a Scottish authority has decided to approve, not before. The categories that trigger it, what happens during the pause, and why withdrawing a statutory objection is the whole game.

Read article →
Wales, Scotland and Northern Ireland7 min read

The hierarchy of developments in Scotland explained

In Scotland the development category decides whether you must consult the community twelve weeks before applying, how long determination takes and where an appeal goes. Here is how to work out which category applies.

Read article →
Wales, Scotland and Northern Ireland7 min read

Listed building consent in Scotland: categories A, B and C

Scotland grades listed buildings A, B and C, protects interiors as standard and still requires a separate conservation area consent for demolition. Here is how the consent works and who must be consulted.

Read article →
Wales, Scotland and Northern Ireland7 min read

Local place plans in Scotland and what they change

The Planning (Scotland) Act 2019 gave communities a statutory route to set out proposals for land in their area. Registration matters, and so does the timetable.

Read article →