Glossary

What makes a structure a building for planning

7 min readBy PlanScope Editorial Team

Whether a pod, container or cabin is a building decides which consent you need. Here is the three-fold test the courts apply and what it means for garden structures and caravans.

Whether a structure is a building for planning purposes decides which consent you need, so it is worth getting right before anything is delivered. Section 336(1) of the Town and Country Planning Act 1990 says a building includes any structure or erection and any part of a building, which is circular enough to be useless on its own. The working test the courts use looks at three things: size, permanence and the degree of physical attachment to the ground. A structure that scores highly on all three is a building, erecting it is operational development, and the question becomes whether a permitted development right covers it.

Why the question arises

Three situations bring it up.

A homeowner buys a pod, container or cabin and wants to know whether Part 1 of the GPDO applies at all, because permitted development rights for outbuildings are drafted around buildings, enclosures, pools and containers.

An enforcement officer has to decide which time limit runs. Operational development and changes of use have different immunity periods and different enforcement routes, so classifying the breach is the first step.

And a professional needs to know whether the floorspace counts: for Community Infrastructure Levy liability, for a floorspace threshold in a validation list, or for Building Regulations.

The answer is not the same in every regime. A thing can be a building for planning and a chattel for rating, or a caravan under the Caravan Sites and Control of Development Act 1960 and still be assessed as a change of use of land.

Size, permanence and degree of attachment

The three-fold test comes from the rating case of Cardiff Rating Authority v Guest Keen Baldwins and has been applied in planning for decades, including to a marquee re-erected each year for several months and to a large tower crane assembled on site. The three factors are weighed together rather than applied as hurdles.

Size matters because it goes to whether the thing reads as part of the land. A 10 m by 5 m timber lodge is a building whatever it stands on. A 1 m planter is not, however firmly it is bolted down.

Permanence is about intended duration and actual use, not about whether the structure could in theory be removed. Something present for most of the year, year after year, counts as permanent even if it is dismantled each winter. But a short-lived structure for an event, taken down after a fortnight, is normally not a building.

Attachment is the factor people over-weight. A structure resting on its own weight can still be a building. Services connected into it, a concrete slab beneath it, bolts, straps and ground screws all push the analysis towards a building, but the absence of attachment does not settle the matter.

Read together, the question is whether a reasonable person would say the structure has become part of the land. That is a judgement, which is why marginal cases end up at appeal.

Caravans, containers and pods

A caravan is defined by section 29(1) of the Caravan Sites and Control of Development Act 1960 as a structure designed or adapted for human habitation that is capable of being moved from one place to another, with twin-unit structures treated as caravans where they can be moved in two sections and fall within the statutory dimensions.

The planning consequence is different from the building analysis. Stationing a caravan on land is normally a use of that land rather than operational development, so the question is whether there has been a material change of use, and the familiar permitted development classes for buildings do not apply. Where a static unit is assembled on site, fixed to foundations and connected to services in a way that makes moving it impracticable, it stops being a caravan and becomes a building.

Shipping containers sit at the awkward end of this. A container dropped on a yard for a few weeks is a chattel. The same container sitting on a slab for three years, with a door cut into it and power run to it, is a building, and the fact that a lorry could in principle remove it does not help.

Garden pods and modular units are the same analysis with better marketing. Delivery on a lorry says nothing about permanence.

Structures that rest on their own weight

A few recurring examples, with the factors that usually decide them:

Structure Usual analysis
Freestanding timber cabin on paving slabs Building, because of size and permanence
Polytunnel on hoops pushed into soil Often a building if left in place year on year, argued on size and permanence
Marquee erected each summer for several months Can be a building, decided on recurrence and duration
Static caravan on blocks, connected to services Use of land, unless fixing makes it immovable in practice
Portable site cabin during construction Not a building, covered by the temporary rights in Part 4
Storage container on a slab, long term Building

Part 4 of Schedule 2 to the GPDO is worth remembering here, because it permits buildings and plant needed temporarily for construction works on adjoining land, and the use of land for any purpose for a limited number of days a year. Several arguments about permanence disappear once Part 4 is applied properly.

Hot tubs, pergolas and garden rooms

A hot tub delivered as a self-contained unit and filled from a hose is a chattel in most cases, so no planning permission is needed for the tub itself. What catches people is the deck. A raised platform more than 300 mm above ground is excluded from Part 1 Class E, so a tub sunk into a raised deck takes the whole arrangement outside permitted development even though the tub alone would be fine.

A pergola is usually a structure rather than a building when it is open-sided and open-topped, but once it has a solid roof, side panels and a floor it is a building and the Class E limits apply, including the 2.5 m height cap within 2 m of a boundary.

Garden rooms are buildings. The live question for them is never whether they are buildings but whether the use is incidental to the enjoyment of the dwellinghouse, and the point at which more activity becomes a material change of use is argued far more often than the physical test.

Classification feeds through to five practical consequences.

Which permitted development right applies, if any. The householder classes are drafted around buildings, enclosures, pools and containers, and a structure outside those words has no right to rely on.

Whether demolition is caught. Demolishing a building can need prior approval under Part 11 of Schedule 2 to the GPDO, and in a conservation area the removal of a building needs permission.

Whether listed building consent is engaged. A structure within the curtilage of a listed building that was there before 1 July 1948 can be treated as part of the listing, and on larger historic estates routine work is sometimes handled through a heritage partnership agreement rather than application by application.

Whether the floorspace counts for Community Infrastructure Levy and for validation thresholds, which turn on new build gross internal area.

And which enforcement route and time limit applies, since operational development and material changes of use are treated differently.

Getting certainty

Officers will give an informal view and it is worth having, but it binds nobody. For anything with real money attached, apply for a certificate of lawfulness of proposed use or development under section 192 of the Town and Country Planning Act 1990 before the structure arrives, or under section 191 if it is already there. A certificate is the only formal way to confirm that development is lawful, and it is the document a buyer's solicitor will accept.

The application needs to describe the structure precisely: overall dimensions including any base or deck, the method of support, whether services are connected, the intended duration of use and the intended purpose. Vagueness is fatal, because a certificate only covers what it describes. Where the case is arguable, a short Planning Statement setting out the three factors and why they point one way does more than a covering letter.

Illustrative example: a 4.8 m by 3.6 m insulated garden room on ground screws, 1.8 m from the rear boundary, 2.45 m to the flat roof, with power and water connected, standing on a 200 mm deck. It is plainly a building. The deck at 200 mm stays below the raised platform threshold, the height is under the 2.5 m boundary cap, and the structure is within Class E provided the use stays incidental. Raise the deck to 350 mm and none of that holds.

This is general guidance, not legal advice. Check the position with your local planning authority or a qualified professional before relying on it. PlanScope provides AI-assisted draft reports for planning applications. Reports should be reviewed before submission. We do not guarantee planning approval. To see the documents a structure of this kind usually needs, browse the report types on PlanScope.

Frequently asked questions

What is the test for whether something is a building?

Courts weigh three factors together: size, permanence and the degree of physical attachment to the ground. The test comes from rating case law and has long been applied in planning. No single factor settles it, so a structure resting on its own weight can still be a building if it is large and stays in place.

Does a shipping container need planning permission?

It depends on permanence and use. A container dropped on a yard for a few weeks is usually a chattel. The same container on a slab for years, with doors cut in and power connected, is a building, and siting it may also be a material change of use of the land. The fact it could be lifted away does not decide it.

Is a static caravan treated as a building?

Normally no. A caravan as defined in section 29 of the Caravan Sites and Control of Development Act 1960 is a structure capable of being moved, and stationing one is a use of land rather than operational development. Where a unit is fixed to foundations so that moving it becomes impracticable, it stops being a caravan.

Do I need permission for a hot tub?

The tub itself is usually a chattel needing no permission. The problem is the deck. Part 1 Class E does not permit a building that includes a raised platform, and a platform more than 300 millimetres above ground counts, so sinking a tub into a raised deck can take the whole arrangement outside permitted development.

How can I be certain before I buy a structure?

Apply for a certificate of lawfulness of proposed use or development under section 192 of the Town and Country Planning Act 1990 before it arrives, or section 191 afterwards. Describe the dimensions, the method of support, services, duration and purpose precisely, because a certificate only covers what it describes.

Sources and further reading

building definitionsection 55permitted developmentcaravansoutbuildingslawful development certificate

This article is general guidance about the planning system in England and, where stated, the rest of the UK. It is not legal or professional advice. Check your local planning authority’s validation requirements and take professional advice for your specific site.

More in Glossary

View all →
Glossary6 min read

Reserved matters: the five matters and the section 92 clock

Only five matters can be reserved on an outline permission. Here is what each one covers, the statutory time limits in section 92, and the changes a reserved matters application cannot make.

Read article →
Glossary6 min read

Hope value and its place in land value assessment

Hope value is the premium paid for the prospect of future planning permission. It counts in a market sale, is disregarded in viability appraisals, and is treated differently again in compulsory purchase.

Read article →
Glossary6 min read

Deliverable sites and why the definition is argued

The glossary definition of a deliverable site decides most five year housing land supply arguments. Here is how the two site categories differ and what evidence moves a site across the line.

Read article →
Glossary9 min read

Town or village green registration as a constraint

Registration under the Commons Act 2006 makes building on land a criminal offence. Trigger events are the shield, and the sequence of applications is what protects a site.

Read article →
Glossary8 min read

Diverting a public right of way under section 257

Section 257 lets the planning authority divert a footpath where that is necessary to enable permitted development. The order runs on its own timetable and should start with the application.

Read article →
Glossary8 min read

Section 106 review mechanisms and clawback

A review mechanism reopens the viability position after permission is granted. The drafting, not the principle, decides how much clawback a scheme eventually pays.

Read article →