What makes an air quality consultant credible to a council

6 min readBy PlanScope Editorial Team

Environmental health officers judge an air quality assessment on its verification section. Here is what to ask a consultant before appointment, and what to read in the proposal.

Air quality consultant selection turns on one question an environmental health officer will ask before reading your conclusions: has this person verified their model against local monitoring data, and shown the working? Membership of the right institute matters, and access to the right datasets matters, but verification is where credibility is won or lost. A dispersion model run on default assumptions and presented without a verification factor is the fastest route to a holding objection on a major application.

What follows is what officers actually check, in roughly the order they check it.

Membership and accreditation in the field

The professional home for this work is the Institute of Air Quality Management, which publishes the guidance most English authorities expect assessments to follow, covering land use planning and development control as well as construction dust. Membership grades run from Associate through Member to Fellow, and a Member or Fellow leading the assessment is the baseline.

Related qualifications appear alongside it. Chartered environmentalist status through the professional body for environmental practitioners, membership of the relevant institute for environmental sciences, and for monitoring work, accreditation of the laboratory analysing diffusion tubes.

Ask who will sign the report rather than who runs the company. On fee competitive work the named lead sometimes has no involvement after the proposal, and an officer who has seen three reports from the same practice notices when the writing changes.

Model verification against local monitoring

This is the technical heart of it. Dispersion models systematically under or over predict road contributions, so the modelled road increment has to be adjusted using measured concentrations from monitoring sites in the study area, following the approach in Defra's local air quality management technical guidance.

A credible assessment states:

  • which monitoring sites were used, with their identifiers and locations
  • the measured and modelled road contributions at each
  • the verification factor derived, and the scatter around it
  • why any monitoring site was excluded
  • what the factor implies for confidence in the predicted concentrations

One verification site in a different street canyon type is weak. Several sites spanning the range of roadside conditions in the study area is strong. Where no suitable monitoring exists, the consultant should say so, explain what they did instead, and be open about the wider uncertainty rather than presenting the same precision as a verified model.

A report that gives concentrations to two decimal places with no verification section is telling you something about the author.

Access to background and monitoring datasets

Predicted concentrations combine a modelled local contribution with a background value, and the background comes from Defra's national maps at 1 km resolution. Those maps carry a base year, and using an out of date projection year is a common error that changes the answer.

Consultants also need the authority's own monitoring data, which sits in its annual status report rather than in any national dataset. Someone who has already read the relevant report will know where the exceedances are, whether an air quality management area was declared for nitrogen dioxide or particulates, and what the declaring authority said about the causes. That knowledge shows up in the first page of a proposal.

Check that the background and monitoring years used in the assessment match the year the model was run for, and that the assessment year corresponds to the expected opening year of the development.

Experience of the authority's own guidance

Many authorities publish their own air quality planning guidance, setting local thresholds for when an assessment is required, an emissions mitigation approach, and a method for calculating a damage cost contribution where residual emissions remain.

Damage cost assessment is now routine on medium sized schemes. It converts predicted emissions into a monetary figure using published damage cost values, and that figure often becomes a planning obligation. Two consultants can produce very different numbers from the same scheme depending on the emission factors, the fleet assumptions and the value set applied, so ask which values they use and whether the authority has accepted that approach before.

A consultant who has to be told the local policy exists will be learning it at your expense.

Construction dust competence against operational modelling

These are different skills and they are often done by different people.

Construction phase assessment follows the institute's construction dust guidance, a risk based method that classifies the site by activity and by receptor sensitivity and prescribes mitigation. It needs judgement about how a site will actually be built, and it feeds directly into a Construction Management Plan and the conditions attached to it.

Operational assessment is modelling. Traffic derived concentrations at sensitive receptors, combustion plant emissions from any energy centre, and where relevant the effect of the development on air quality in a declared management area.

Ask which of the two dominates your scheme. A residential scheme on a quiet road with a two year build programme is mostly a dust and mitigation exercise. A scheme introducing several hundred vehicle movements onto a road already in exceedance is a modelling exercise, and the person you want is different. An Air Quality Assessment that treats both phases seriously will say clearly which risk drives the conclusions.

Reading a proposal for model verification scope

Fee proposals hide their weak points in the exclusions. Read those first, then check for these specifics:

  1. Named model and version, with the meteorological dataset and year stated.
  2. Verification method, the monitoring sites proposed and what happens if they prove unsuitable.
  3. Receptor selection, including whether proposed receptors within the development are assessed as well as existing ones.
  4. Whether traffic data will be supplied by the transport consultant or derived, and which scenarios are modelled.
  5. Whether a damage cost calculation and an emissions mitigation assessment are included.
  6. How many rounds of comment on the draft are covered, and whether responding to consultee questions is inside the fee.

Point five is where budgets slip. Point six is where programmes slip, because the response to an environmental health officer's query is usually needed inside a fortnight and an out of scope request takes longer to agree than to write.

Programme and data lead times

Air quality work is not usually seasonal, which makes it easy to leave late. The dependencies bite instead.

Traffic flows have to exist before the model runs, so the assessment sits behind the Transport Assessment in the programme. Where the authority's latest annual status report is imminent, waiting for it can be better than using superseded data. Where new monitoring is needed because existing sites are unsuitable, diffusion tube surveys need several months of exposure periods to be representative, and that is the one item that can delay a submission by a season.

Build the sequence backwards from your target submission date, and ask the consultant for their critical path rather than a single delivery date.

Where you want a reviewer to check the competence of an assessment you have already commissioned, the professional directory is the route to someone who can review and sign off the work. PlanScope can produce a structured draft of the reporting framework, and for an air quality assessment the modelling and verification must come from a suitably qualified practitioner. For specialist technical reports, qualified professional input may be required.

PlanScope provides AI-assisted draft reports for planning applications. Reports should be reviewed before submission. We do not guarantee planning approval.

Frequently asked questions

What is model verification and why does it matter so much?

Dispersion models systematically over or under predict road traffic contributions, so the modelled increment is adjusted using measured concentrations at monitoring sites in the study area. The adjustment factor, the sites used and the scatter around them should all appear in the report. Without that section, predicted concentrations cannot be relied on for a policy judgement.

Which professional membership should an air quality consultant hold?

Membership of the Institute of Air Quality Management at Member or Fellow grade is the working baseline, since that institute publishes the guidance most English authorities expect assessments to follow. Chartered environmentalist status and membership of the relevant environmental sciences institute are common alongside it. Ask who will sign the report, not who owns the practice.

Is construction dust assessment the same skill as operational modelling?

No. Construction dust work follows a risk based method that classifies activities and receptor sensitivity and prescribes mitigation, and it depends on understanding how a site will be built. Operational assessment is dispersion modelling of traffic and combustion emissions. Establish which dominates your scheme before choosing who leads the work.

What is a damage cost assessment?

A calculation that converts the predicted emissions from a development into a monetary figure using published damage cost values, often secured as a planning obligation towards local air quality measures. Results vary with the emission factors, fleet assumptions and value set used, so check whether the authority has accepted your consultant's approach on previous schemes.

How long does air quality work take?

The modelling itself is quick once inputs exist, so the programme risk sits in the dependencies. Traffic data has to come first, background and monitoring data should match the assessment year, and if new diffusion tube monitoring is required it needs several months of exposure periods. Ask for the critical path rather than a delivery date.

Sources and further reading

air qualityconsultantscompetenceenvironmental healthmajor development

This article is general guidance about the planning system in England and, where stated, the rest of the UK. It is not legal or professional advice. Check your local planning authority’s validation requirements and take professional advice for your specific site.

More in Professionals and Qualifications

View all →
Professionals and Qualifications6 min read

Who signs a Design and Access Statement

There is no signature block and no prescribed author for a Design and Access Statement. Article 9 of the DMPO 2015 says when one is needed and what it must explain.

Read article →
Professionals and Qualifications6 min read

Checking a consultant's membership and currency

Letters after a name tell you somebody passed an assessment once. Currency, indemnity cover and the right institute are what protect you.

Read article →
Professionals and Qualifications6 min read

Odour assessment competence and who can sign one

An odour risk assessment needs dispersion judgement as well as ductwork knowledge. The two skills rarely sit in the same person, and almost never in the supplier.

Read article →
Professionals and Qualifications7 min read

Transport evidence: who signs a trip generation note

A trip generation note is only as good as the judgement behind the site selection. Here is the competence highway authorities look for and what to put in the brief.

Read article →
Professionals and Qualifications6 min read

Whole life carbon assessment competence and scope

The RICS whole life carbon standard fixes the modules, the 60 year study period, the data rules and the reporting format. Most differences between assessments come from scope choices, not arithmetic.

Read article →
Professionals and Qualifications7 min read

Overheating assessments and CIBSE TM59 competence

Nobody is licensed to run a CIBSE TM59 overheating assessment, so competence is judged on the inputs. The weather file, assumptions schedule and per-room results are the places to look.

Read article →