Residential Scale Thresholds

When a scheme becomes referable to the Mayor of London

7 min readBy PlanScope Editorial Team

More than 150 homes makes a London scheme referable, and floorspace, height and Metropolitan Open Land triggers catch others. Here is what Stage 1 and Stage 2 actually involve.

An application in Greater London becomes referable to the Mayor when it falls into one of the categories of potential strategic importance set out in the Town and Country Planning (Mayor of London) Order 2008. For most developers the trigger is residential scale: more than 150 houses or flats makes a scheme referable wherever it sits in London. Floorspace and height triggers catch commercial schemes, and development on Green Belt or Metropolitan Open Land is caught at a much smaller size.

Referral does not move the decision to City Hall. It gives the Mayor a right to comment, a right to direct refusal and a right to take the application over, exercised through a two stage process that runs alongside the borough's own determination.

Where the referral categories sit in law

The categories are in Schedule 1 to the 2008 Order, which replaced the 2000 Order and lowered the residential threshold from 500 units to 150. Boroughs remain the local planning authority throughout unless the Mayor takes a scheme over.

The Order has been amended, so check the current consolidated version rather than working from a summary table in an old committee report. Whether a scheme is referable is a matter of fact rather than judgement, and getting it wrong has a procedural consequence: a borough that determines a referable application without referring it has not followed the statutory process.

One point that catches people out. The categories say "comprising or including", so a mixed use scheme with 160 flats above a shop is referable on the residential category even though the commercial element is small. Schemes are also assessed as a whole, so splitting a site into two applications to stay under a threshold invites a finding that the development is a single scheme, as with any other threshold that appears as a scheme grows.

Residential units, floorspace and height

The three quantitative categories are the ones most often in play.

Category Trigger
Residential More than 150 houses, flats, or houses and flats
Floorspace in the City of London More than 100,000 m²
Floorspace in Central London More than 20,000 m²
Floorspace elsewhere in Greater London More than 15,000 m²
Height adjacent to the River Thames More than 25 metres
Height in the City of London More than 150 metres
Height elsewhere More than 30 metres

Height is measured to the top of the building, and the Thames category bites at a low figure precisely because the river frontage is a strategic view corridor. A nine or ten storey block on the south bank can be referable on height alone while an identical block a mile inland is not.

Central London for these purposes is a defined area rather than a loose description, so confirm it against the Order and not against a mental map of Zone 1. Borough boundaries cut through it.

Protected land and the smaller triggers

Development on Green Belt or Metropolitan Open Land is referable at a far lower level. The designation has a strategic function that does not depend on the size of the building. The practical effect is that a modest sports pavilion or a school expansion on Metropolitan Open Land can be referable when a much larger building on an ordinary infill site is not.

Other categories cover mining and waste development, and development that would prejudice the use of land for strategic purposes. These come up less often, but they are the ones where a scheme's referability is easiest to miss at feasibility stage, because nobody thinks to check them.

Where a scheme is also Schedule 2 development under the Town and Country Planning (Environmental Impact Assessment) Regulations 2017, the Environmental Impact Assessment screening question and the referral question are separate and answered separately. The Environmental Statement must be prepared by competent experts, and a PlanScope draft is a starting point for that team rather than a substitute for it.

Stage one: the Mayor's initial view

The borough sends the application to the Greater London Authority once it is validated. The Mayor then has six weeks to issue a Stage 1 report setting out whether the scheme complies with the London Plan, what would need to change for it to comply, and whether there are grounds on which he might later direct refusal or take the application over.

A Stage 1 report is a public document and it is the most useful thing a developer gets from the process. It tells you, in writing and before the borough's committee report is drafted, which policies the strategic authority thinks are unresolved. Affordable housing under Policy H5 and the threshold approach, design and tall buildings under Policy D9, fire safety under Policy D12, and energy and carbon under the relevant Policy SI provisions account for most of the substantive comments on residential schemes.

Referable status also pulls in documents that smaller schemes do not need. Greater London Authority guidance expects a Whole Life Carbon Assessment and a Circular Economy Statement for referable applications, which is a different exercise from the borough's own energy requirements and is why energy and carbon evidence changes as a scheme scales.

Stage two: direction, release or takeover

When the borough has resolved what it intends to do, it refers the application back. The Mayor then has 14 days to take one of three courses: allow the borough to issue its decision, direct the borough to refuse, or take over the application and determine it himself.

A takeover means the Mayor becomes the local planning authority for that application. In practice this is followed by a representation hearing at City Hall, at which the applicant, the borough and objectors are heard before the Deputy Mayor for Planning. The hearing is public and the decision is published with reasons.

Direction to refuse is rare. Takeover is rarer, and is usually reserved for schemes where the strategic authority supports development that the borough has resolved to refuse. Most referable applications are released at Stage 2 with no change, which is why the Stage 1 report matters so much: the negotiation happens before then, not after.

What referral does to the programme

The statutory determination period is unchanged by referral. A major application still carries 13 weeks, and 16 weeks where an Environmental Statement is submitted, but in practice boroughs rarely issue a decision on a referable scheme within those periods.

Build the sequence into the programme honestly:

  1. Validation, then referral to the Greater London Authority.
  2. Six weeks to the Stage 1 report.
  3. Borough consultation, consultee responses and officer negotiation, usually overlapping Stage 1.
  4. Committee resolution.
  5. Referral back and 14 days to the Stage 2 decision.
  6. Section 106 completion, then the decision notice.

An extension of time agreement is the norm rather than the exception on referable schemes, and a Planning Performance Agreement is worth considering where the borough's resources are the binding constraint.

Preparing for a strategic review

Engage with the Greater London Authority before submission, not after Stage 1. The authority publishes a charging schedule for pre-application planning advice, so check the current rates and build the fee into the appraisal.

Two habits pay for themselves. Write the planning submission so that London Plan compliance can be read policy by policy, with a short table cross-referring each strategic policy to the document that deals with it. And resolve the affordable housing position early, because a scheme that cannot use the threshold approach faces a viability assessment on top of everything else, which adds months rather than weeks.

This is general guidance, not legal advice. The referral categories are set by statutory instrument and have been amended, so confirm the current text of the Order and the London Plan position with the borough or a qualified planning professional before relying on it.

PlanScope can draft the London Plan compliance narrative and the supporting statements a referable scheme needs, so you can see which reports your site is likely to need from the postcode. PlanScope provides AI-assisted draft reports for planning applications. Reports should be reviewed before submission. We do not guarantee planning approval.

Frequently asked questions

How many homes make an application referable to the Mayor?

More than 150 houses, flats, or houses and flats, anywhere in Greater London. The 2008 Mayor of London Order lowered the figure from the 500 units used under the 2000 Order. The category is worded as comprising or including residential units, so a mixed use scheme with more than 150 flats is caught even if the commercial floorspace is modest.

Does referral mean the Mayor decides my application?

Not usually. The borough remains the local planning authority unless the Mayor takes the application over at Stage 2. Most referable schemes are released back to the borough with no change. The Mayor also has a power to direct refusal, but both takeover and direction are used sparingly compared with the volume of referrals.

What is a Stage 1 report?

A public report the Greater London Authority issues within six weeks of receiving a referable application. It sets out whether the scheme complies with the London Plan, what changes would be needed for compliance, and whether grounds might exist for a later direction or takeover. It is the clearest early signal of the strategic issues on a scheme.

How long does Stage 2 take?

Fourteen days from the borough referring the application back after resolving what it intends to do. Within that period the Mayor either allows the borough to issue its decision, directs refusal, or takes the application over to determine it. A takeover is normally followed by a public representation hearing at City Hall.

Does referral change the statutory determination period?

No. A major application still carries 13 weeks, and 16 weeks where an Environmental Statement is submitted. In practice boroughs rarely decide a referable scheme inside those periods once Stage 1, consultee responses, committee and Stage 2 are sequenced, so an extension of time agreement is normal.

Which extra documents does referable status trigger?

Greater London Authority guidance expects a Whole Life Carbon Assessment and a Circular Economy Statement for referable applications, alongside the borough's own energy requirements. Tall building, fire safety and affordable housing policies in the London Plan also generate specific evidence that smaller schemes are not asked for.

Sources and further reading

londonmayoral referrallondon planmajor developmentplanning processgreater london authority

This article is general guidance about the planning system in England and, where stated, the rest of the UK. It is not legal or professional advice. Check your local planning authority’s validation requirements and take professional advice for your specific site.

More in Residential Scale Thresholds

View all →
Residential Scale Thresholds6 min read

When a scheme needs environmental impact screening

More than 150 dwellings or more than five hectares puts a scheme into Schedule 2 of the EIA Regulations 2017. Crossing a threshold does not mean an environmental statement is needed, but it does make screening unavoidable.

Read article →
Residential Scale Thresholds7 min read

What changes for a scheme of one new dwelling

One new house is not a householder application. Net gain exemptions, the levy start notice and foul drainage evidence are where single plot schemes go wrong.

Read article →
Residential Scale Thresholds7 min read

What changes when a scheme includes affordable housing

Crossing the major development threshold brings a percentage requirement, a tenure mix to agree with a registered provider, and a section 106 agreement that has to be enforceable years later.

Read article →
Residential Scale Thresholds7 min read

What changes when a site crosses into a flood zone

A site that straddles a flood zone boundary is judged on where you build, not on a single classification. Here is how the sequential approach, levels and access work.

Read article →
Residential Scale Thresholds7 min read

What changes at eighteen metres in height

Eighteen metres or seven storeys pulls in Planning Gateway One, the higher-risk building regime and three Building Regulations changes. Here is how the tests are measured and what each one costs the plan.

Read article →
Residential Scale Thresholds7 min read

What changes at two thousand five hundred square metres

Two thousand five hundred square metres is the national default threshold for retail impact assessment outside a town centre, and the figure most highway authorities use for a Transport Assessment. The sequential test has no threshold at all.

Read article →