Viability, Obligations and Commercial

When an inspector reopens viability at appeal

7 min readBy PlanScope Editorial Team

Viability appeals turn on a handful of inputs, and benchmark land value is usually the biggest. Here is how inspectors test the figures and how to narrow the dispute before the hearing.

Viability at appeal is won on three or four numbers, and one of them is almost always benchmark land value. An inspector reopens viability when the council's reason for refusal turns on affordable housing or obligations and the appellant says the policy package cannot be afforded. From that moment the appeal becomes an evidential exercise about inputs, and the party whose inputs are better sourced tends to win.

Inspectors are not valuers. They are experienced at spotting an input that has been chosen rather than derived.

The policy starting point

National policy expects viability to be tested at plan making, so that adopted policy requirements are already deliverable across the plan area. Planning Practice Guidance follows through: a viability assessment at application stage should only be necessary where particular circumstances justify it, and the applicant has to demonstrate those circumstances.

That framing matters at appeal because it puts the burden where it sits. The appellant has to explain why this site is different from the sites the plan assumed. Abnormal ground conditions, a heritage asset with a repair liability, a severely constrained access, an existing use with a value the plan did not anticipate: these are the arguments that work. A general assertion that build costs have risen is not, because the plan viability evidence has its own indexation.

The Planning Practice Guidance is equally direct on land price. The price paid for land is not a justification for failing to comply with policy requirements. Inspectors quote that sentence often.

When viability becomes a main issue at appeal

It becomes a main issue in three situations. The refusal cites a failure to provide policy compliant affordable housing and the appellant relies on viability. The council and the appellant agree the principle of development but disagree about the obligations package. Or the appellant appeals a refusal on other grounds and the council adds an obligations reason, which happens more often than it should.

Procedure choice follows from that. A viability dispute with two expert valuers is hard to run by written representations, because the inspector cannot test the inputs. Hearings work for a narrow dispute on one or two inputs. An inquiry is the right forum where benchmark land value, build costs and profit are all contested, and where cross examination will do real work.

Decide procedure early and say why in the appeal form. An inspector who reads a written representations appeal containing two irreconcilable appraisals will often convert it, and the conversion costs weeks.

Disclosure and the presumption of transparency

The Guidance is clear that viability assessments should be publicly available, in an accessible form, with an executive summary. Redaction is limited to commercially sensitive material, and the reasons for any redaction have to be given.

Appellants underestimate how badly a redaction fight goes. A council that cannot see the inputs cannot agree them, the inspector cannot test them, and the practical result is that the assessment carries less weight. If a land transaction cannot be disclosed at all, consider whether the case can be run without relying on it rather than redacting the document that supports it.

Put the appraisal in as a working file where the inspector's directions allow it, with the formulae intact. A locked PDF of an appraisal invites the council's expert to rebuild it, and rebuilt appraisals surface every assumption you hoped would pass unnoticed.

The statement of common ground on inputs

This is where most of the value lies. Agree what you can, line by line, and leave the inspector with a short list of genuine disputes.

Input Usually agreed Usually disputed
Gross development value Unit mix and floor areas Achievable values per square metre and sales rates
Build cost Source and base date of the cost data Abnormals, external works and contingency
Professional fees Percentage basis Whether a percentage or a fixed sum fits the scheme
Finance Structure of the cash flow Interest rate and whether it reflects current lending
Developer return That a return is needed The percentage and whether it is on cost or on value
Benchmark land value The method in the Guidance Existing use value and the premium

A statement of common ground that agrees the first column and sets out each side's figure in the second column is worth more than a two hundred page appraisal. It also protects you on costs, because it shows the issues were narrowed properly.

Benchmark land value and why it dominates

The Guidance sets benchmark land value on an existing use value plus a premium basis, with the premium reflecting a reasonable return to a willing landowner, and with the policy requirements and levy liability taken into account. Alternative use value is only relevant where there is an existing implementable permission for that alternative.

Disputes cluster in two places. The existing use value itself, where the parties disagree about the income the current use generates or about whether a use is still continuing in fact. And the premium, where there is no fixed percentage and the arguments run on comparables, on landowner behaviour in the local market and on what the plan viability evidence assumed.

Illustrative example: a former builder's yard with a short unexpired lease. The appellant valued the existing use on the passing rent capitalised at a yield drawn from recent local transactions, and applied a premium at the upper end. The council took the same rent but argued the yield reflected hope value rather than the existing use, and applied a lower premium. The gap between the two benchmark figures was larger than the entire disputed affordable housing contribution, which is a common pattern and a reason to resolve the benchmark first.

Where the scheme involves the loss of a vacant building, the credit position is its own argument and we cover it in vacant building credit and why councils resist it.

The council's rebuttal and its expert

Councils instruct external valuers for appeal viability, and the instruction is usually narrow: review the appellant's appraisal and report on the inputs. That produces a rebuttal rather than a competing appraisal, which is tactically useful to the council because it only has to show that the appellant's figures are unreliable.

Answer it on its own terms. Take each criticised input, state the source, state the date, and state what the figure would be on the council's method. Where the council's expert is right about something, concede it and show the sensitivity. Conceding a build cost point and demonstrating that the conclusion survives is far stronger than defending every number.

Both sides' authors should be working to the RICS professional statement on financial viability in planning, which requires objectivity regardless of who instructs. Councils generally expect a suitably qualified author, and professional review of any draft is strongly advised. If the appellant's appraisal was prepared by someone without valuation credentials, expect that to be raised.

Costs risk on a weak viability case

Costs awards follow unreasonable behaviour that causes wasted expense. A viability case that is advanced and then abandoned at the inquiry, an assessment that withholds inputs until the last minute, or a refusal reason on obligations that the council cannot evidence: all three have drawn costs applications.

So test the case before you run it. If the viability position depends on a single contested input, and losing that input loses the appeal, consider offering a review mechanism instead. A late stage review clause in the agreement gives the council its upside if values improve and gives the scheme its consent now, and the mechanics are set out in overage clauses and review mechanisms in a section 106. The interaction with the policy requirement itself is covered in the Affordable Housing Statement, and the underlying document is the Viability Assessment.

This is general guidance, not legal advice; check the position with your local planning authority or a qualified professional before relying on it.

Enter your postcode on PlanScope to see which supporting documents your scheme is likely to need.

PlanScope provides AI-assisted draft reports for planning applications. Reports should be reviewed before submission. We do not guarantee planning approval.

Frequently asked questions

Can I keep my viability appraisal confidential at appeal?

Only in narrow terms. Planning Practice Guidance expects assessments to be publicly available with an executive summary, and limits redaction to commercially sensitive material with reasons given. A heavily redacted appraisal cannot be agreed by the council or tested by the inspector, so it carries less weight in the decision.

Does the price paid for the land justify a reduced obligations package?

No. Planning Practice Guidance states that the price paid for land is not a justification for failing to comply with policy requirements, and inspectors quote it. Benchmark land value is set on an existing use value plus premium basis, taking the policy requirements and levy liability into account, rather than on the transaction price.

Which appeal procedure suits a viability dispute?

Written representations rarely work where two expert appraisals conflict, because the inspector cannot test the inputs. A hearing suits a narrow dispute over one or two figures. An inquiry is appropriate where benchmark land value, build costs and developer return are all contested and cross examination will do useful work.

What should a statement of common ground on viability contain?

Agreed unit mix and floor areas, the source and base date of build cost data, the cash flow structure, the method for benchmark land value, and then a short schedule setting out each party's figure on the disputed inputs. Narrowing the dispute this way carries more weight than a long appraisal and reduces costs exposure.

Can a costs award follow a viability case?

Yes, where behaviour is unreasonable and causes wasted expense. Advancing a viability case and abandoning it at the inquiry, withholding inputs until late, or a council maintaining an obligations reason it cannot evidence have all attracted costs applications. Test the case honestly before running it, and consider a review mechanism instead.

Sources and further reading

viabilityappealssection 106affordable housingbenchmark land value

This article is general guidance about the planning system in England and, where stated, the rest of the UK. It is not legal or professional advice. Check your local planning authority’s validation requirements and take professional advice for your specific site.

More in Viability, Obligations and Commercial

View all →
Viability, Obligations and Commercial8 min read

Marriage value and site assembly in a viability appraisal

Assembly costs are real, but most of them do not reduce what a scheme can contribute. Where acquisition costs, ransom premiums and created marriage value each belong in the appraisal.

Read article →
Viability, Obligations and Commercial7 min read

Varying a planning obligation after five years

After the five year relevant period, a statutory application under section 106A replaces negotiation, and a refusal can be appealed under section 106B. What the authority can decide and what it cannot.

Read article →
Viability, Obligations and Commercial7 min read

Social infrastructure contributions and how they are justified

Contribution requests are built from a yield factor, a capacity claim and a published cost. The arithmetic is usually right, so the argument belongs on the capacity evidence and the statutory tests.

Read article →
Viability, Obligations and Commercial7 min read

Pooling restrictions and clawback in planning obligations

Regulation 123 and the five obligation pooling cap went in September 2019. What remains is the statutory test in regulation 122, the infrastructure funding statement, and careful drafting against duplication.

Read article →
Viability, Obligations and Commercial8 min read

Indexation of section 106 contributions and which index applies

The index family and the base date decide how far an indexed contribution moves. Name the series exactly, set the base date to the prices the figure is expressed in, and recalculate every demand.

Read article →
Viability, Obligations and Commercial8 min read

Phasing a scheme to manage section 106 triggers

Phasing moves when obligations fall due rather than how much they total. Define phases by land parcel, build in a revised phasing plan mechanism, and tie affordable delivery to occupation within each phase.

Read article →