When the Inspectorate allocates a hearing instead

7 min readBy PlanScope Editorial Team

The Inspectorate chooses the procedure, not the appellant. Hearings suit disputes about interpretation and design where no cross-examination is needed.

The Planning Inspectorate chooses the appeal procedure, not the appellant. You state a preference on the appeal form and give reasons, and the Inspectorate applies its published criteria to decide between written representations, a hearing and an inquiry. Hearings sit in the middle and get allocated where the issues need discussion rather than cross-examination.

Knowing which way a case will go matters for cost and programme. A hearing typically needs a statement of case, a hearing statement, a day or two of attendance and a planning witness who can hold a conversation under pressure. An inquiry needs advocates, proofs of evidence, cross-examination and, on anything substantial, a costs exposure several times larger.

The three procedures and who chooses

Written representations is the default and handles the large majority of appeals. Everything is in writing, the inspector makes a site visit, and there is no hearing.

A hearing is an inquisitorial discussion led by the inspector around a table. There are no advocates in the usual sense, no evidence on oath and no cross-examination. The inspector works through an agenda, asking questions of whoever can answer them.

An inquiry is adversarial. Advocates lead evidence from witnesses, cross-examine the other side's witnesses and make closing submissions, and the inspector manages the process rather than driving the questioning.

The Inspectorate decides, applying criteria published in its procedural guidance. It can also change the procedure later, which happens where the issues turn out to be narrower or wider than the parties described. Where an appellant's stated preference is refused, the Inspectorate gives reasons, and those reasons are usually a fair summary of how it sees the case.

The criteria that point to a hearing

Four features tend to produce a hearing allocation.

The issues need explanation and discussion rather than testing by cross-examination. A design and character dispute, a heritage balance, or a question about whether a scheme fits a policy is often best explored by an inspector asking questions.

The evidence is largely undisputed but its interpretation is not. Where both parties agree the figures and disagree about what they mean, cross-examination adds little.

There is a substantial interested party interest, particularly from a parish council or a residents' group who want to be heard but are not going to instruct counsel. A hearing lets them participate in a way an inquiry does not.

The case is too complex or too contentious for written representations alone, but the disputed issues are few enough that a day or two of discussion will resolve them.

By contrast, an inquiry is indicated where evidence needs testing under cross-examination, where there is significant technical conflict between expert witnesses, where the case turns on the credibility of evidence, or where the scale of the proposal and the public interest justify the formality. Viability disputes and housing land supply arguments commonly go this way.

Written representations Hearing Inquiry
Format Documents only Inspector-led discussion Advocates and cross-examination
Evidence tested by Reading Questions from the inspector Cross-examination
Advocates None Not usually Yes
Typical attendance None One to two days Several days
Suits Simple, narrow issues Interpretation and design disputes Conflicting expert evidence

How a hearing session actually runs

The inspector opens, explains the procedure, confirms who is present and runs through the agenda. That agenda is issued in advance and it is the structure of the day.

Discussion is then topic by topic. The inspector asks a question, someone answers, the other party responds, interested parties contribute where the topic touches them, and the inspector moves on when satisfied. There is no examination in chief, no re-examination and no formal closing speeches, though the inspector usually invites brief final comments.

Two things surprise people at their first hearing. The inspector may ask the question you were hoping to avoid, directly, of the person least prepared to answer it. And the pace is conversational, which makes it easy to concede something in passing that you would have defended carefully in writing.

The site visit usually follows the hearing, often accompanied, and the inspector may ask further questions on site. Treat it as part of the process rather than as a formality.

Preparing a hearing statement

The hearing statement is the main written submission and it should be written for an inspector who will read it once, the week before, alongside four other cases.

Structure it around the issues rather than around the refusal reasons, unless they happen to coincide. Deal with the policy framework briefly and accurately. Then take each disputed issue, state the council's position, state yours, and identify precisely where the disagreement lies.

What makes a hearing statement work:

  1. A short summary of the case at the front, three or four paragraphs, so the inspector knows the argument before reading the detail.
  2. Agreed matters identified explicitly, which narrows the discussion and saves time on the day.
  3. Appendices that are used rather than assembled, each cross-referenced from the text.
  4. Plain statements of fact with their source, rather than assertion.
  5. A proposed set of conditions, agreed with the council where possible.

Length discipline matters. A hearing statement is not a proof of evidence, and a 90-page document with 400 pages of appendices signals that the case should have been an inquiry. The reasoning behind what goes into a statement of case in the first place is covered in writing a statement of case an inspector can use.

Where new material is being introduced that was not before the council, deal with the reason for it openly, because the Inspectorate takes a firm line, as set out in new evidence at appeal and when it is refused.

Who speaks and in what order

There are no witnesses in the formal sense. Anyone present who can help on a topic may be asked to speak, and the inspector decides who and when.

In practice the appellant's planning consultant leads on planning matters, with technical specialists brought in for their topics. The council's case officer does the same. Interested parties speak on the topics that concern them, usually after the main parties on each item.

Two practical points. Bring the person who actually did the work, because an inspector asking about a survey methodology wants the person who carried it out, not a summary from the planner. And agree in advance within your team who takes which topic, because two people answering the same question differently is the worst outcome available.

A solicitor or counsel may attend a hearing, and occasionally does where a legal point arises, but the format does not reward advocacy and an inspector will steer away from it.

Costs and time compared with an inquiry

A hearing costs a fraction of an inquiry, and the difference is mostly in people.

An inquiry needs an advocate, proofs of evidence from each expert, rebuttals, a statement of common ground, and several days of attendance by a team. A hearing needs the statement, the attendance of the consultant and any relevant specialist, and no advocate. On a mid-sized residential scheme the gap is substantial and it is the main reason appellants ask for a hearing.

Timescales are closer than the cost difference suggests, since the allocation, the statement exchange and the listing all take time whichever route applies. The Inspectorate publishes indicative timescales that are worth checking at the point of appeal rather than relying on memory.

Costs awards are available in all procedures for unreasonable behaviour, and the fact that a hearing feels informal does not change that.

Requesting a different procedure

State your preferred procedure on the appeal form and give reasons that engage the criteria rather than the convenience.

A request for a hearing works best when it explains why the issues need discussion, identifies how many issues there are, confirms that no cross-examination is needed and notes the level of local interest. A request that says only that an inquiry would be expensive will not persuade anyone.

Where the Inspectorate allocates a procedure you did not want, you can ask it to reconsider, with reasons, and the request is more likely to succeed where circumstances have changed or where the council agrees. A joint request from appellant and council carries real weight.

And consider whether the appeal is the right step at all. Where the refusal reasons are capable of being designed out, a revised application is frequently faster and cheaper than any appeal procedure, and the comparison is set out in resubmitting a refused scheme instead of appealing. Where the refusal turns on a single defensible policy point, the analysis in deciding whether a refusal reason is worth appealing is the place to start.

Browse all 66 report types on PlanScope if the appeal needs supporting evidence the original application lacked.

This is general guidance rather than legal advice. Appeal procedures and timescales change, so check the Planning Inspectorate's current procedural guidance or take advice from a qualified professional before relying on it. PlanScope provides AI-assisted draft reports for planning applications. Reports should be reviewed before submission. We do not guarantee planning approval.

Frequently asked questions

Who decides whether an appeal goes to a hearing?

The Planning Inspectorate, applying criteria in its published procedural guidance. The appellant states a preference on the appeal form with reasons, and the council can comment, but the decision is the Inspectorate's. It can also change the procedure later where the issues turn out to be narrower or wider than the parties described.

What kind of case gets allocated to a hearing?

One where the issues need explanation and discussion rather than testing by cross-examination. Design and character disputes, heritage balances and questions of policy interpretation are typical. Substantial local interest also points to a hearing, because it lets residents and parish councils participate without instructing an advocate.

Is there cross-examination at a hearing?

No. A hearing is inquisitorial, led by the inspector around a table, with no evidence on oath, no examination in chief and no cross-examination. Advocates may attend and occasionally do where a legal point arises, but the format does not reward advocacy and an inspector will steer away from it.

How long should a hearing statement be?

Short enough to be read once, the week before, alongside other cases. Structure it around the disputed issues, identify agreed matters explicitly, and cross-reference every appendix from the text. A 90-page statement with 400 pages of appendices signals that the case should have gone to inquiry instead.

Can I ask the Inspectorate to change the allocated procedure?

Yes, with reasons. A request is more likely to succeed where circumstances have changed since the appeal was lodged, or where the appellant and the council make the request jointly. Reasons that engage the published criteria work; reasons that amount to cost or convenience generally do not.

Sources and further reading

appealsplanning inspectoratehearinginquirywritten representationsplanning consultants

This article is general guidance about the planning system in England and, where stated, the rest of the UK. It is not legal or professional advice. Check your local planning authority’s validation requirements and take professional advice for your specific site.

More in Refusals and Appeals

View all →
Refusals and Appeals8 min read

Refusal on fire safety information at Gateway One

A Gateway One refusal is usually about what is missing from the drawings rather than anything wrong with the building, which makes it a drafting failure with a determination period attached.

Read article →
Refusals and Appeals8 min read

Lapsed permissions, withdrawn appeals and the route back

There is no extension application and no revival procedure for an expired permission. What you have is a fresh application on a site with a helpful planning history.

Read article →
Refusals and Appeals8 min read

Refusal where the development plan is out of date

The out-of-date plan argument is the most powerful move on appeal and the most frequently mishandled, because appellants assert the trigger rather than proving it.

Read article →
Refusals and Appeals8 min read

Contamination refusals without intrusive investigation

A desk study that identifies a credible pollutant linkage and then stops can get an application refused outright. The gap is between what the report raised and what the application proved.

Read article →
Refusals and Appeals6 min read

HMO refused for over-concentration: testing the count

Concentration refusals turn on data the council never compiled for the purpose. How to test the count address by address and answer the supporting reasons.

Read article →
Refusals and Appeals6 min read

Front garden parking refused: hardstanding and the kerb

Two consents, two decision makers. What the permitted development condition on surfacing actually says, and why the highway authority refuses most crossings on depth.

Read article →