Professionals and Qualifications

Who can carry out a Phase 2 ground investigation

6 min readBy PlanScope Editorial Team

A Phase 2 ground investigation must be designed, supervised and interpreted by suitably qualified and experienced people. What councils look for, and how to check it before you appoint.

A Phase 2 ground investigation has to be designed, supervised, interpreted and signed by someone the local planning authority will accept as suitably qualified and experienced. That phrase comes from BS 10175 and from the Planning Practice Guidance on land affected by contamination, and it is the test the contaminated land officer applies when the report lands on their desk. Phase 2 contaminated land competence is judged on the report and the team behind it rather than on a single certificate, which is why two reports on similar sites can get very different receptions.

A Phase 2 report is also the document that carries the most liability of anything in a planning pack. It says the ground is safe for the proposed use. Get it wrong and the consequences arrive years later, in the hands of people who bought houses on the strength of it.

Why the officer asks who wrote it

Planning policy places responsibility for securing safe development on the developer or landowner, and the local planning authority has to be satisfied that the site can be made suitable for its proposed use. The officer is not equipped to re-run your risk assessment. What they can do is check the conceptual site model, the sampling rationale, the laboratory certificates and the qualifications of the people who produced them.

A report that reads as a data dump with no interpretation, or one where the author cannot be identified, gets sent back. So does one where the sampling pattern shows no relationship to the Phase 1 findings.

What suitably qualified and experienced means in practice

There is no statutory register of contaminated land assessors. Competence is demonstrated through a combination of qualifications, chartered status, membership of a relevant body and demonstrable experience of similar sites, and the officer weighs those together.

The markers councils look for:

  • A named author with chartered status in a relevant discipline, such as chartered geologist, chartered environmentalist, chartered scientist or chartered engineer.
  • Membership of a body whose remit covers land condition, and evidence of continuing professional development in risk assessment.
  • Registration on a specialist scheme for land condition or ground engineering, where the assessment of competence has already been made by peers.
  • Project experience on comparable ground conditions and comparable end uses, because a residential end use with private gardens is a different problem from a warehouse with a concrete slab.

None of these alone is sufficient. A chartered geologist who has never designed a residential ground gas assessment is not the right author for one.

Fieldwork supervision and desk interpretation are different jobs

This is the split that goes wrong most often. The drilling contractor is not the assessor. The person logging the arisings on site should be a geotechnical or environmental specialist working to the logging conventions in the site investigation standards, and their logs are the primary record everything else rests on.

Three practical requirements for the fieldwork:

  1. Continuous supervision by a competent logger, not spot visits to a self-recording contractor.
  2. Sampling decisions made on site against the conceptual site model, with the authority to add locations where the ground does not match the prediction.
  3. Ground gas monitoring visits spread across a range of falling atmospheric pressure conditions, because a set of visits taken in settled high pressure tells you very little.

The interpretation then belongs to the risk assessor, who takes the logs, the laboratory results and the monitoring data and tests them against the conceptual site model. Where those two roles sit with the same person on a small site, say so in the report.

Laboratory accreditation and why it is checked

Soil and water analysis should come from a laboratory holding accreditation for the specific determinands being reported, not simply accreditation in general. The certificates should be appended in full, with sample identifiers that match the logs, dates that fall within the holding times for each analysis, and the limits of detection stated.

A common failing is a laboratory report where the detection limit for a contaminant sits above the assessment criterion being used. The result reads as not detected and proves nothing. Our note on accredited laboratories for soil and water analysis covers what to check on the certificate before it goes in the appendix.

Registers, chartership and what they actually prove

Registers of specialists in land condition and of ground engineering professionals exist because the industry needed a way to signal competence that a client could check. They work as a filter rather than a guarantee. What a register tells you is that a panel has reviewed that individual's experience against defined criteria at a point in time.

What it does not tell you is whether the individual has done your kind of site. Ask for two recent examples with the same end use and similar ground, and ask who will actually sign the report rather than who is in the pitch.

Peer review before submission

On anything other than a simple site, an internal technical review by a second assessor is worth the day it takes. The reviewer should check the conceptual site model against the data, confirm that every potential pollutant linkage identified in Phase 1 has been addressed or discounted with reasons, and test whether the remediation strategy follows from the findings.

Where a scheme is contentious or the end use is sensitive, an independent review commissioned by the developer before submission costs less than the delay of a refusal and a resubmission. Councils sometimes ask for one and charge the cost to the applicant, so having already done it is the stronger position.

Where the liability sits

The consultant's duty runs to the client under the appointment, and the limit of liability and the professional indemnity cover are set there. Read them. A cap set at the fee level on a report supporting 80 houses is not meaningful cover.

Collateral warranties or reliance letters extend the duty to funders, purchasers and the eventual homeowners' warranty provider, and they have to be agreed at appointment rather than negotiated afterwards. Where the consultant is novated to the contractor, the reliance position changes, which we look at in novating a consultant appointment to the contractor.

Statutory liability is separate. Part IIA of the Environmental Protection Act 1990 attaches to the person who caused or knowingly permitted the contamination, and in its absence to the current owner or occupier, regardless of what any consultant's appointment says.

Getting the commission right

Write the brief around the Phase 1 findings. A Phase 2 scope that was copied from another site is visible to the officer within a page, and it is usually visible to the consultant too, who will price it as instructed rather than as needed.

Where ground engineering and contamination overlap, a single combined investigation avoids two mobilisations, and a Geotechnical Assessment can share boreholes with the environmental sampling. The contamination reporting itself sits in the contaminated land assessment, which covers both the Phase 1 desk study and the Phase 2 intrusive stage.

Land contamination assessment is a report type where a suitably qualified and competent professional is legally expected: the NPPF places responsibility on the developer and authorities expect investigation carried out in accordance with the relevant British Standard by suitably qualified and experienced persons. An AI-assisted draft is a starting point for that professional rather than a substitute for them. Reviewers listed in the PlanScope professional directory can review and sign off a draft where the report type allows it.

This is general guidance, not legal advice. Check the position with your local planning authority or a qualified professional before relying on it. PlanScope provides AI-assisted draft reports for planning applications. Reports should be reviewed before submission. We do not guarantee planning approval. For specialist technical reports, qualified professional input may be required.

Frequently asked questions

Is there a licence needed to write a contaminated land report?

No statutory licence or register exists. Competence is judged from chartered status in a relevant discipline, membership of a body covering land condition, registration on a specialist land condition or ground engineering scheme, and demonstrable experience of comparable sites and end uses. The local planning authority weighs those together when it reads the report.

Can the drilling contractor log the boreholes?

Logging should be done by a competent geotechnical or environmental specialist working to recognised logging conventions, under continuous supervision rather than spot visits. The logs are the primary record that the risk assessment rests on, and a self-recording drilling contractor gives you no one able to change the sampling plan when the ground differs from the prediction.

How many ground gas monitoring visits are needed?

Enough to cover a range of conditions, including periods of falling and low atmospheric pressure, because gas emissions rise as pressure drops. The number depends on the gas regime and the generation potential identified in the conceptual site model. A short run of visits taken in settled high pressure weather will usually be rejected as unrepresentative.

What should I check on a laboratory certificate?

That the laboratory holds accreditation for each determinand reported, that sample identifiers match the borehole logs, that analysis dates fall within holding times, and that the limits of detection sit below the assessment criteria you are comparing against. A detection limit above the screening value produces a not detected result that proves nothing.

Does a consultant's report protect me from liability?

Only to the extent of the appointment. The duty runs to the client, subject to whatever liability cap and professional indemnity cover the contract sets, and reliance for funders or purchasers has to be agreed at appointment. Statutory liability under Part IIA of the Environmental Protection Act 1990 is separate and attaches to the polluter, or failing that the owner or occupier.

Sources and further reading

contaminated landground investigationcompetenceprofessional reviewphase 2

This article is general guidance about the planning system in England and, where stated, the rest of the UK. It is not legal or professional advice. Check your local planning authority’s validation requirements and take professional advice for your specific site.

More in Professionals and Qualifications

View all →
Professionals and Qualifications6 min read

Checking a consultant's membership and currency

Letters after a name tell you somebody passed an assessment once. Currency, indemnity cover and the right institute are what protect you.

Read article →
Professionals and Qualifications6 min read

Odour assessment competence and who can sign one

An odour risk assessment needs dispersion judgement as well as ductwork knowledge. The two skills rarely sit in the same person, and almost never in the supplier.

Read article →
Professionals and Qualifications7 min read

Transport evidence: who signs a trip generation note

A trip generation note is only as good as the judgement behind the site selection. Here is the competence highway authorities look for and what to put in the brief.

Read article →
Professionals and Qualifications6 min read

Whole life carbon assessment competence and scope

The RICS whole life carbon standard fixes the modules, the 60 year study period, the data rules and the reporting format. Most differences between assessments come from scope choices, not arithmetic.

Read article →
Professionals and Qualifications7 min read

Overheating assessments and CIBSE TM59 competence

Nobody is licensed to run a CIBSE TM59 overheating assessment, so competence is judged on the inputs. The weather file, assumptions schedule and per-room results are the places to look.

Read article →
Professionals and Qualifications6 min read

What MRTPI tells you about a planning agent

Chartered membership of the Royal Town Planning Institute signals assessed competence and a binding code of conduct. It is not a financial remedy, and planning consultancy has no protected title at all.

Read article →