Professionals and Qualifications

Who can write a Gateway One fire statement for planning

6 min readBy PlanScope Editorial Team

There is no statutory register of fire engineers, so the applicant carries the competence question. What to look for in an author, and what belongs in the planning stage statement.

The fire statement that accompanies a planning application for a tall residential building has to be prepared by someone with fire engineering competence, and the form itself asks who wrote it and what qualifies them. If you are asking who can write a fire statement, the honest answer is that there is no statutory register, so the burden falls on you as applicant to appoint someone whose competence you could defend if the Health and Safety Executive queries the submission. In practice that means a chartered or incorporated engineer with fire engineering experience on buildings of the type proposed.

Where the fire statement requirement comes from

Article 9A of the Town and Country Planning (Development Management Procedure) (England) Order 2015 requires a fire statement with applications for relevant development. It was inserted in 2021 and it applies where the development involves the provision of one or more relevant buildings.

A relevant building is one containing two or more dwellings, or educational accommodation, that meets the height condition: 18 metres or more in height, or seven or more storeys, whichever is reached first. That definition drags in student accommodation and some institutional residential schemes that people assume are outside it.

The statement must be on the form published by the Secretary of State. It is not a free-form document, and a bespoke fire strategy report submitted instead of the form does not satisfy the requirement, though it can and usually should be appended to it. This first stage is commonly called Planning Gateway One, sitting ahead of the building control approval and completion stages under the Building Safety Act 2022 regime.

The competence the regulator expects

The form asks for the name, professional qualifications and relevant experience of the author. There is no licensing scheme for fire engineers in the way there is for, say, an ecologist holding a survey licence. What exists instead is a set of recognised indicators.

  • Chartered or incorporated engineer registration through the Engineering Council, with fire engineering as the practising discipline.
  • Membership of the Institution of Fire Engineers at a grade that reflects assessed competence rather than subscription alone.
  • Demonstrable experience on buildings of comparable height, use and construction, including any relevant work on external wall systems and evacuation strategy.
  • Professional indemnity insurance that actually covers fire engineering advice on higher-risk buildings, which is not a given.

Ask for evidence of all four before appointment. And ask to see it in writing. The competence question has become sharper since the Building Safety Act 2022 introduced duties around competence for those working on higher-risk buildings, and a designer who cannot evidence their own competence is a risk you carry rather than one they carry.

Where a scheme is complex, the practical answer is often a named lead fire engineer supported by a practice, with the individual identified on the form. Anonymous corporate authorship invites a request for further information.

How the Health and Safety Executive reviews it

For applications involving relevant buildings, the Health and Safety Executive is a statutory consultee at the planning stage. It reviews the fire statement against the matters that are properly planning matters and responds to the local planning authority within the consultation period.

What comes back is not an approval. It is a consultee response that the authority weighs alongside everything else, and it can be a request for more information, a set of comments, or a substantive objection. A response that identifies gaps in the statement usually means a resubmission of the form rather than a refusal, provided the design principles are sound.

The most common gaps are practical rather than theoretical: no dimensioned fire appliance access shown on the site plan, no confirmation of the available water supply for firefighting, no statement about how the layout works if one stair is compromised, and no explanation of how the fire strategy interacts with the proposed external wall build-up.

Scope at planning stage against building control

The planning stage deals with the things planning can actually control. The building control stage deals with detailed design. Keeping the two apart saves a great deal of wasted effort.

Matter Planning stage fire statement Building control approval stage
Site layout and appliance access Yes, with dimensions and turning Confirmed against the detailed design
Water supplies for firefighting Principles and available supply Detailed hydrant and main provision
Evacuation strategy Principles and their effect on layout and cores Full design, travel distances, smoke control
External wall construction Principles and materials strategy Full specification and test evidence
Internal compartmentation Not usually a planning matter Yes

A Fire Statement prepared for planning should therefore be shorter than people expect and more spatial than people expect. Where a fuller document is needed, a Fire Safety Strategy to BS 9991 or BS 9999 is the fire engineering document, and both are areas where a competent professional is legally required rather than merely advisable. An AI-assisted draft can structure the narrative and the policy framing, and it cannot supply the engineering judgement.

Programme implications for a relevant building

Appoint the fire engineer at the same time as the architect, not after the layouts are fixed. Three decisions get made early and are expensive to unpick later: the number and position of stair cores, the position and width of the fire appliance route, and the extent of the external wall system.

A single stair scheme is the sharpest example. Where policy or regulation points towards a second stair for buildings above a given height, adding one after the massing is set costs floor area on every level and can undermine the viability case. Get the fire engineer's view on that in week one.

Budget for a resubmission cycle. If the regulator responds with questions at week five of a thirteen week determination period, you need the author available to respond inside two weeks rather than in a month's time.

Appointing and briefing a fire engineer

A short, specific brief gets a better fee and a better document.

  1. State the building height in metres and the storey count, and say how both were measured.
  2. Confirm the use: dwellings, student accommodation, or a mix, and whether any part is institutional.
  3. Provide the site plan showing the adopted highway, the proposed access route and any gradients or restrictions.
  4. Provide the general arrangement plans and the core strategy, even in outline form.
  5. Say what the external wall build-up is likely to be, including balconies and any combustible elements.
  6. Confirm who is completing the form and who signs it.
  7. Ask for the response to any consultee comments to be included in the fee, with a stated turnaround.

Where you need help identifying a reviewer who can sign off a draft, the professional directory is the route PlanScope provides for professional review and sign-off. PlanScope provides AI-assisted draft reports for planning applications. Reports should be reviewed before submission. We do not guarantee planning approval.

This is general guidance, not legal advice, and the height condition and form requirements are set by legislation that changes, so check the current article 9A wording and the published form before submitting. Browse the report types on PlanScope to see what else a tall residential scheme is likely to need.

Frequently asked questions

Which applications need a fire statement?

Applications for relevant development under article 9A of the Development Management Procedure Order 2015. That means development providing a building containing two or more dwellings or educational accommodation which is 18 metres or more in height or has seven or more storeys. Student accommodation is caught by the educational accommodation limb.

Is there an approved list of fire engineers for Gateway One?

No statutory register exists. Applicants are expected to appoint someone whose competence they can evidence, typically chartered or incorporated engineer registration with fire engineering as the practising discipline, an assessed membership grade of the Institution of Fire Engineers, comparable project experience and professional indemnity cover that extends to higher-risk buildings.

Can I submit a fire strategy report instead of the form?

No. The statement must be on the form published by the Secretary of State, and an application submitted without it can be treated as invalid. A fuller fire strategy report is useful as an appendix, particularly where the scheme is complex, but it does not replace the prescribed form.

Does the Health and Safety Executive approve the fire statement?

It responds as a statutory consultee, and its response is a material consideration for the local planning authority rather than an approval. Comments usually ask for missing information, most often appliance access dimensions, firefighting water supply, evacuation principles or the external wall strategy.

How does the planning stage differ from building control?

The planning statement covers matters planning can control: site layout, appliance access, water supplies, evacuation principles and the external wall strategy at a principles level. Detailed compartmentation, travel distances, smoke control design and test evidence belong to the building control approval stage under the Building Safety Act 2022 regime.

Sources and further reading

fire statementgateway onebuilding safety actcompetencetall buildings

This article is general guidance about the planning system in England and, where stated, the rest of the UK. It is not legal or professional advice. Check your local planning authority’s validation requirements and take professional advice for your specific site.

More in Professionals and Qualifications

View all →
Professionals and Qualifications7 min read

Species licence returns and a consultant's track record

A mitigation licence ends when the returns and monitoring are complete, not when the works finish. Here is what the conditions require, why a consultant's compliance record is a programme risk, and the questions to ask before appointing.

Read article →
Professionals and Qualifications6 min read

What a chartered title does not cover

Chartered membership shows assessed competence in a broad field and a code of conduct. It does not show that someone has produced your document before. Here is what actually decides competence, report type by report type.

Read article →
Professionals and Qualifications7 min read

When junior staff are the right people for the work

Most of a planning evidence base is data collection and policy assembly, which supervised junior staff do well. Here is where professional judgement cannot be delegated, and how to check the supervision is real.

Read article →
Professionals and Qualifications7 min read

Who can act as agent on a planning application

Planning consultant is not a protected title, so anyone can submit your application. What the agent takes on, why ownership certificates carry criminal liability, and what to ask before instructing.

Read article →
Professionals and Qualifications7 min read

Outdated technical reports and the CPD behind them

Three Framework editions in under three years broke the citations in a lot of reports. The tells that a report is working from old guidance, and how to specify currency in the appointment.

Read article →
Professionals and Qualifications7 min read

Telecommunications declarations and who signs them

The ICNIRP declaration is an operator liability, not a consultant opinion. What it certifies, the radio frequency competence behind it, and why shared masts need a cumulative assessment.

Read article →