Professionals and Qualifications

Who prepares a viability assessment, and independence

6 min readBy PlanScope Editorial Team

A viability assessment is only as strong as the valuer behind it. What the RICS professional statement requires, and how the council's reviewer will test your inputs.

A viability assessment in planning should be prepared by a suitably experienced valuer, normally a chartered surveyor and RICS registered valuer, working to the RICS professional statement on financial viability in planning. That statement sets mandatory requirements on objectivity, conflicts of interest and reporting, and it applies to the applicant's assessor and to the reviewer the council appoints. If you are a developer commissioning one, the person you choose and the basis on which you pay them will shape how much weight the assessment carries before a single number is read.

Councils have grown sceptical of viability evidence, and the fastest way to confirm that scepticism is to appoint someone whose independence can be questioned.

The standard that applies

The RICS professional statement on financial viability in planning sets conduct and reporting requirements for practitioners advising on viability, whether for an applicant, a landowner or a local planning authority. The practical content is about behaviour rather than method: act with objectivity and impartiality, identify and manage conflicts, do not accept instructions on terms that make the fee depend on the outcome, and disclose assumptions and their sources so that another valuer could rerun the appraisal.

The national Planning Practice Guidance on viability supplies the policy method that sits alongside it, covering benchmark land value, developer return and the treatment of planning obligations.

Neither document makes a viability assessment a legally reserved activity. Anyone can write one. But an assessment prepared by someone outside the professional framework will be given the weight the officer thinks it deserves, which in practice is very little.

What independence actually means

Independence here is not the same as neutrality about the outcome. An applicant's assessor is entitled to act for the applicant and to present the appraisal that supports the case, provided the inputs are defensible and the assumptions are stated.

What the standard prohibits is more specific. Acting where a conflict cannot be managed. Taking a success fee or any arrangement where payment rises with the level of affordable housing avoided. Allowing the client to dictate an input that the valuer does not consider supportable. Suppressing a comparable that undermines the conclusion.

The same firm cannot sensibly act for the applicant and for the authority on the same scheme, and most councils now ask both sides to confirm in writing that no such conflict exists. Our wider piece on independence and conflicts in planning evidence covers how this plays out across other specialisms, where the rules are looser and the risk is higher.

There is a softer conflict worth watching too. A valuer who acts for most of the landowners in a district and then advises its council will find their objectivity questioned at committee, whatever the paperwork says.

The applicant's assessor and the authority's reviewer

The usual pattern on a major application is two assessments. The applicant submits one. The council instructs an independent reviewer, almost always at the applicant's cost through a fee agreement signed before the review starts.

The reviewer's client is the authority. Their job is to test the applicant's appraisal, not to produce a rival scheme, and their report will usually accept large parts of the submitted work while disputing two or three inputs. Those disputed inputs are where the affordable housing number moves.

Expect the reviewer to ask for the underlying appraisal file rather than a printed summary. Refusing to provide it is a reliable way to lose the argument, because a reviewer who cannot interrogate the model will simply substitute their own assumptions.

Where the two sides cannot agree, some councils appoint a second reviewer or take the dispute to committee with both positions set out. A viability assessment that anticipates this and evidences every contested figure at the outset shortens the process considerably.

The inputs a reviewer will test

Input What the reviewer checks
Gross development value Comparable evidence, dates, adjustments for size and specification, and whether the sales mix matches the drawings
Build costs Source and date of the cost data, level of abnormals claimed, and whether contingency is double counted
Benchmark land value Existing use value plus a premium, or an alternative use value supported by an actual permission or clear policy support
Developer return Whether the return sits in the range national guidance describes, and whether a lower return has been applied to affordable housing
Finance and programme Interest rate, drawdown profile and build period against the phasing shown on the application
Obligations Section 106 contributions, the levy where it applies, and whether both have been counted once

The guidance on viability describes a return in the range of 15 to 20 per cent of gross development value as potentially suitable for market housing, with a lower figure often appropriate for affordable housing delivery. Those are national reference points rather than entitlements, and a reviewer will ask why a particular figure was chosen for this scheme.

Benchmark land value is where most disputes actually live. An assessment that adopts the price the developer paid, rather than an existing use value plus premium, is not following the guidance and will be marked down.

Transparency and publication

National guidance is clear that viability assessments should be prepared on the basis that they will be made publicly available, other than in exceptional circumstances, and that even then a summary should be published in a form that allows the public to understand the conclusions.

That changes how you write. Anything you would not want a parish council reading aloud at committee should not be in the report at all. Commercially sensitive material belongs in a short annexe with a reasoned case for withholding it, not scattered through the main text.

Applicants sometimes ask whether they can submit viability evidence in confidence. The honest answer is that they can ask, and they will usually be refused.

Where assessments lose credibility

Optimistic sales values paired with pessimistic build costs, both drawn from different dates. Abnormals that appear in the appraisal but not in the engineer's report. A benchmark land value that exceeds the value the site would have with the policy-compliant scheme. Contingency counted twice, once in the cost plan and once in the profit line.

And, more often than any of these, an appraisal presented without the file behind it. Reviewers are not hostile by disposition. They are sceptical because they cannot see the working.

Reading an opposing assessment critically is a skill in itself, and our guide to reviewing a report you did not commission sets out the questions worth asking first.

Appointing and instructing

  1. Ask for the valuer's RICS registration and their recent experience of schemes of your type and scale in the same market area.
  2. Agree a fixed fee. Never a fee linked to the affordable housing outcome, which the professional standard prohibits and the council will ask about.
  3. Confirm in writing that the firm holds no conflicting instruction for the authority or for a landowner with an interest in the site.
  4. Give the valuer the cost plan, the accommodation schedule and the programme at the same time, not in instalments.
  5. State in the brief that the report will be published, so the valuer writes it accordingly.

A clear written brief does more for the quality of the evidence than any amount of chasing afterwards, and our note on writing a brief for a specialist report covers what to include.

PlanScope can draft the structure and policy framing of a viability assessment as a starting point for the valuer who will sign it. For specialist technical reports, qualified professional input may be required. You can find reviewers through the professional directory.

PlanScope provides AI-assisted draft reports for planning applications. Reports should be reviewed before submission. We do not guarantee planning approval. This is general guidance, not legal advice. Check the position with your local planning authority or a qualified professional before relying on it.

Frequently asked questions

Who is qualified to prepare a viability assessment?

Councils expect a chartered surveyor and RICS registered valuer with recent experience of comparable schemes in the same market. Viability work is not a legally reserved activity, so anyone may write an assessment, but one prepared outside the professional framework is given little weight when the officer comes to balance the evidence.

Can a viability assessment be paid for on a success fee?

No. The RICS professional statement on financial viability in planning prohibits arrangements where the fee depends on the outcome, because they compromise the objectivity the assessment depends on. Agree a fixed fee, and expect the council to ask how the valuer was engaged if the conclusions are contested.

Who pays for the council's independent reviewer?

In almost all cases the applicant does, under a fee agreement signed before the review begins. The reviewer's client is still the local planning authority, and their duty runs to the council rather than to the party paying. Budget for it at the outset on any scheme where affordable housing is being reduced.

Will my viability assessment be published?

Assume so. National planning guidance says assessments should be prepared on the basis that they will be made publicly available, other than in exceptional circumstances, and that a summary should be published even then. Keep genuinely sensitive material in a short annexe with a reasoned case for withholding it.

What is benchmark land value based on?

National guidance uses existing use value plus a premium to the landowner, or an alternative use value where that use has permission or clear policy support. The price actually paid for the site is not the benchmark. Adopting the purchase price is the single most common reason a reviewer rejects an assessment.

Sources and further reading

viability assessmentricsaffordable housingsection 106professional standards

This article is general guidance about the planning system in England and, where stated, the rest of the UK. It is not legal or professional advice. Check your local planning authority’s validation requirements and take professional advice for your specific site.

More in Professionals and Qualifications

View all →
Professionals and Qualifications6 min read

Who signs a Design and Access Statement

There is no signature block and no prescribed author for a Design and Access Statement. Article 9 of the DMPO 2015 says when one is needed and what it must explain.

Read article →
Professionals and Qualifications6 min read

Checking a consultant's membership and currency

Letters after a name tell you somebody passed an assessment once. Currency, indemnity cover and the right institute are what protect you.

Read article →
Professionals and Qualifications6 min read

Odour assessment competence and who can sign one

An odour risk assessment needs dispersion judgement as well as ductwork knowledge. The two skills rarely sit in the same person, and almost never in the supplier.

Read article →
Professionals and Qualifications7 min read

Transport evidence: who signs a trip generation note

A trip generation note is only as good as the judgement behind the site selection. Here is the competence highway authorities look for and what to put in the brief.

Read article →
Professionals and Qualifications6 min read

Whole life carbon assessment competence and scope

The RICS whole life carbon standard fixes the modules, the 60 year study period, the data rules and the reporting format. Most differences between assessments come from scope choices, not arithmetic.

Read article →
Professionals and Qualifications7 min read

Overheating assessments and CIBSE TM59 competence

Nobody is licensed to run a CIBSE TM59 overheating assessment, so competence is judged on the inputs. The weather file, assumptions schedule and per-room results are the places to look.

Read article →