The RICS whole life carbon standard fixes the modules, the 60 year study period, the data rules and the reporting format. Most differences between assessments come from scope choices, not arithmetic.

Two whole life carbon assessments of the same building can differ by a wide margin and both be defensible. The reason is almost never arithmetic. It is module scope, the reference study period, the source of the carbon factors and what was counted as part of the building. So whole life carbon assessment competence is mostly about the discipline to declare those choices and the experience to make them consistently.

The RICS professional standard exists to narrow that gap. It is mandatory for RICS members and regulated firms, and it is the methodology London boroughs and an increasing number of authorities outside London expect to see cited.

What the methodology requires of the assessor

The RICS whole life carbon assessment standard, second edition published in 2023, sets rules for scope, data, calculation and reporting. The important consequence for an architect is that it fixes things that used to be left to the assessor's discretion.

It specifies the life cycle stages to be reported, following the framework in BS EN 15978. It sets the reference study period for buildings, which is 60 years, so an assessment run over a different period is not comparable. It sets rules for data quality and for how carbon factors are sourced. And it prescribes the reporting format, including normalisation by gross internal area.

Competence is not licensed. Nobody is legally required to hold a certificate to produce one of these assessments. What authorities look for is familiarity with the standard, experience of the building type, and a report that declares every assumption. Councils generally expect a suitably qualified author for this report, and professional review is strongly advised.

Data quality and the sources used for materials

The carbon factors do most of the work in the result, and where they come from matters.

Product-specific environmental product declarations prepared to the European product standard are the strongest data, because they relate to the material actually specified. Generic industry average data from a recognised database is acceptable at early stages and is weaker, because it averages across manufacturing routes that differ substantially.

Three practical rules follow.

  • Use product-specific data for the materials that dominate the total, which on most buildings means concrete, steel, reinforcement, glazing and insulation.
  • Record the data source for every line, with the declaration reference and date, in a schedule the reviewer can check.
  • Do not mix a product-specific factor for one concrete mix with a generic factor for another in the same element, because the comparison between design options then means nothing.

Quantities deserve the same scrutiny. An assessment built from a quantity surveyor's measured bill is a different animal from one built from a design stage model with assumed build-ups, and the report should say which it is.

Module scope and where assessments diverge

Choice Why two assessments differ
Modules reported upfront carbon only, versus the full life cycle including replacement and end of life
Reference study period a shorter period reduces replacement cycles and the reported total
Scope boundary whether substructure, external works, fit-out and services are included
Data source product-specific declarations versus generic averages
Sequestration how biogenic carbon in timber is treated and reported
Operational energy basis which calculation underpins the use stage energy figure
Module D reported separately, or mistakenly netted off the total

Module D is the one that causes arguments. Benefits beyond the system boundary, such as the future reuse or recycling of materials, are reported separately from the building's own total, and an assessment that deducts them to produce a flattering headline figure has not followed the standard.

The second edition widened what has to be reported compared with the first, so check which modules the current version requires rather than reusing a template from an earlier project. That is also the most common reason a resubmission is asked for.

Reviewing an assessment submitted by someone else

Ask for the workings. A summary figure in kilograms of carbon dioxide equivalent per square metre tells you nothing about whether it is right.

  1. The completed reporting template, in the format the standard or the authority requires.
  2. The quantities source, and whether it is a measured bill or a model-derived estimate.
  3. A materials schedule with the carbon factor for each line and its data source reference.
  4. The modules reported, the reference study period and the scope boundary, stated explicitly.
  5. The treatment of sequestration and of module D.
  6. The gross internal area used for normalisation, and how it was measured.

Then run one sanity check. Compare the proportion of the total attributable to the structure and substructure against your own experience of similar buildings. A result that looks unusually low in those elements usually means something has been left out of the scope, not that the design is remarkably efficient.

Authority requirements and reporting templates

In London, the London Plan policy on whole life-cycle carbon requires an assessment for referable applications, submitted on the Greater London Authority's own reporting template at planning stage and again post-construction. The template is prescriptive, and a report written to the RICS standard but not transposed into the template will be returned.

Outside London, requirements vary and are growing. Some authorities require an assessment through local plan policy, some ask for one through pre-application advice and some condition it. Check the adopted policy and the validation checklist for the authority rather than assuming.

Where an assessment is required, it usually sits alongside the Whole Life Carbon Assessment material in the submission and relates closely to a Circular Economy Statement, because reuse and material efficiency decisions show up in both documents. Keep the two consistent. Reviewers read them together and notice when the retained structure in one is demolished in the other.

Timing the assessment against design stages

An assessment produced after planning submission is a compliance document. One produced at concept design is a design tool, and the difference in outcome is large.

The decisions with the biggest effect on upfront carbon are made early: whether to retain existing structure, the structural material and grid, the substructure solution, the floor build-up and the facade system. By the time those are fixed, the remaining scope for reduction is in specification detail.

So run a first assessment when the structural concept is being chosen, with option comparisons on a like-for-like scope boundary. Update it when the design is coordinated, and again post-construction where that is required. Each update should hold the scope and the study period constant, because a reduction achieved by narrowing the boundary is not a reduction.

What to require in the appointment

Write the deliverable into the scope of services. The appointment should name the standard and edition, require the authority's template where one applies, and require the materials schedule with data sources, the stated scope boundary and the model or measurement basis. It should set the assessment points against design stages and allocate the post-construction update to someone who will still be appointed.

Add professional indemnity cover with a stated limit, and the right to receive the calculation file rather than a locked summary. A report you cannot interrogate is a report you cannot defend at committee.

Where the figures are contested or the scheme is large, an independent second opinion on the technical evidence is proportionate, and our professional directory is the route to a reviewer who can sign off a draft.

For specialist technical reports, qualified professional input may be required. PlanScope provides AI-assisted draft reports for planning applications. Reports should be reviewed before submission. We do not guarantee planning approval.

Frequently asked questions

What reference study period does the RICS standard use?

Sixty years for buildings. That period determines how many replacement cycles fall within the assessment, so a report run over a shorter period produces a lower total and is not comparable. Hold the study period constant across design option comparisons and across successive updates of the same assessment.

Is a qualification required to produce a whole life carbon assessment?

No statutory qualification exists. The RICS professional standard is mandatory for RICS members and regulated firms, and authorities look for familiarity with the standard, experience of the building type and a report that declares every assumption. Councils generally expect a suitably qualified author, and professional review is strongly advised.

How should module D be reported?

Separately from the building's own total. Module D covers benefits and loads beyond the system boundary, such as future reuse or recycling of materials, and deducting it to produce a lower headline figure does not follow the standard. Check whether a submitted assessment has netted it off.

What carbon data should be used for materials?

Product-specific environmental product declarations for the materials that dominate the total, typically concrete, steel, reinforcement, glazing and insulation, with generic industry average data acceptable only at early stages. Record the source and reference for every line, and avoid mixing specific and generic factors within the same element.

When should the first assessment be carried out?

When the structural concept is being chosen, because retention of existing structure, structural material and grid, substructure, floor build-up and facade system drive most of the upfront carbon. An assessment produced after submission can only report the outcome. Update at coordination stage and post-construction where required.

Sources and further reading

whole life carbonricsembodied carbonlondon plancompetencebs en 15978

This article is general guidance about the planning system in England and, where stated, the rest of the UK. It is not legal or professional advice. Check your local planning authority’s validation requirements and take professional advice for your specific site.

More in Professionals and Qualifications

View all →
Professionals and Qualifications6 min read

Who signs a Design and Access Statement

There is no signature block and no prescribed author for a Design and Access Statement. Article 9 of the DMPO 2015 says when one is needed and what it must explain.

Read article →
Professionals and Qualifications6 min read

Checking a consultant's membership and currency

Letters after a name tell you somebody passed an assessment once. Currency, indemnity cover and the right institute are what protect you.

Read article →
Professionals and Qualifications6 min read

Odour assessment competence and who can sign one

An odour risk assessment needs dispersion judgement as well as ductwork knowledge. The two skills rarely sit in the same person, and almost never in the supplier.

Read article →
Professionals and Qualifications7 min read

Transport evidence: who signs a trip generation note

A trip generation note is only as good as the judgement behind the site selection. Here is the competence highway authorities look for and what to put in the brief.

Read article →
Professionals and Qualifications7 min read

Overheating assessments and CIBSE TM59 competence

Nobody is licensed to run a CIBSE TM59 overheating assessment, so competence is judged on the inputs. The weather file, assumptions schedule and per-room results are the places to look.

Read article →
Professionals and Qualifications6 min read

What MRTPI tells you about a planning agent

Chartered membership of the Royal Town Planning Institute signals assessed competence and a binding code of conduct. It is not a financial remedy, and planning consultancy has no protected title at all.

Read article →