Whole life carbon modules A to C explained

7 min readBy PlanScope Editorial Team

A carbon figure means nothing until you know its scope. What modules A, B, C and D cover, and which assumptions a reviewer should test first.

A whole life carbon figure means nothing until you know which modules it covers. Two assessments of the same building can differ by a factor of two because one stops at practical completion and the other runs to demolition and disposal sixty years later. The modules are the scope, and stating them is the first job of the assessment.

The module structure comes from the European standard for assessing the sustainability of construction works, which the RICS professional standard on whole life carbon applies in a UK context. Modules are lettered by life cycle stage: A for product and construction, B for use, C for end of life, and D for benefits and loads beyond the system boundary.

What each module covers

The breakdown is worth memorising, because every conversation about carbon scope uses it.

Module Stage What it counts
A1 to A3 Product Raw material supply, transport to factory, manufacturing
A4 Transport Delivery of products from factory gate to site
A5 Construction Site activities, plant and energy, construction waste, and pre-construction demolition
B1 Use Emissions in use from the fabric itself, such as refrigerant leakage
B2 to B5 Maintenance to refurbishment Maintenance, repair, replacement of components and refurbishment
B6 Operational energy Regulated and unregulated energy use in operation
B7 Operational water Water supply and treatment in operation
C1 to C4 End of life Deconstruction, transport, waste processing and disposal
D Beyond the boundary Reuse, recovery and recycling potential, and exported energy

Embodied carbon is usually taken to mean modules A1 to A5 plus B1 to B5 plus C1 to C4. Whole life carbon adds the operational modules. Module D is reported separately and is never netted off the total, because it describes benefits that fall outside the building's own life cycle.

Product and construction stages in practice

A1 to A3 dominate most assessments, commonly accounting for the majority of embodied carbon in a new building. Structure and substructure typically carry the largest share, which is why the structural option appraisal is where carbon reduction is actually delivered rather than in specification tweaks at the end.

A4 is small in comparison, though it becomes material for heavy, low-value materials moved long distances. Aggregates and precast concrete are the usual examples. Recording actual sourcing distances rather than default assumptions is worth doing where a local supply chain is part of the argument.

A5 covers site energy, plant, temporary works, waste arising during construction and, in the current RICS approach, pre-construction demolition. That last inclusion changes the answer for redevelopment schemes and is one reason retention options score better than they used to. Where an existing building is being taken down, a pre-redevelopment audit identifying what can be reused or recovered feeds directly into both the A5 figure and any circular economy commitments.

In use emissions and replacement cycles

The B modules are where assumptions do the heavy lifting, and where two competent assessors can produce different answers in good faith.

Replacement cycles under B4 depend on assumed service lives. A facade system assumed to last 60 years is never replaced within the study period. The same system assumed to last 30 years is replaced once, and its A1 to A3 carbon is counted twice. Publish the service life assumptions in a table, because a reviewer cannot check the result without them.

B6 is operational energy, and it should be consistent with the energy assessment submitted alongside. Where the energy statement models one heating strategy and the carbon assessment assumes another, the inconsistency is the first thing a reviewer will find. Carbon factors for grid electricity change over the study period, and the assessment should say whether a decarbonisation trajectory has been applied and on what basis.

B1 catches refrigerant leakage from heat pumps and cooling systems, which is easy to overlook and can be substantial where high global warming potential refrigerants are specified. Low GWP refrigerant selection is a real carbon decision, not a compliance detail.

End of life and the beyond boundary module

C1 to C4 cover taking the building apart, transporting the material, processing it and disposing of what cannot be recovered. The figures rest on assumptions about future waste treatment that nobody can verify, which is why they are usually modelled from standard datasets rather than project data.

Module D is the one most often misused. It reports the potential benefit of materials being reused or recycled after the building's life, and of energy exported from the site. Because those benefits accrue to a future system rather than to this building, the standard requires them to be reported separately. An assessment that subtracts module D to reach a headline figure has overstated the result, and a reviewer will ask for the total without it.

Design for deconstruction improves module D and is worth describing in the narrative: mechanical fixings rather than adhesives, bolted rather than welded connections, avoidance of composite materials that cannot be separated, and a materials passport. Those choices also support the commitments in a circular economy statement where one is required.

Data sources and their quality hierarchy

Not all carbon data is equal, and the assessment should state which tier each material used.

  1. Product-specific environmental product declarations, verified to the relevant standard, for the products actually specified.
  2. Manufacturer average declarations covering a range of products from one manufacturer.
  3. Industry average or sector declarations.
  4. Generic database figures.

Early in design, generic data is appropriate and honest. At the point of a planning submission, the more the assessment relies on generic figures, the less weight it carries, particularly for the structure. Where a product-specific declaration has been used for a material that later changes at procurement, the figure changes with it, which is an argument for conservative assumptions rather than best-case ones.

State the database version and the date. Carbon factors are revised, and an assessment quoting a figure without a source cannot be checked.

Reporting format an officer can read

Officers assessing a whole life carbon assessment are typically looking for four things: the scope, the result against a benchmark, the reduction measures adopted, and the assumptions that could change the answer.

Present results in kg CO2 equivalent per square metre of gross internal area, broken down by module and by building element, over a stated reference study period, normally 60 years for a building. Include the total with and without module D. State the gross internal area used and reconcile it with the accommodation schedule.

Where the London Plan applies, follow the Greater London Authority's whole life-cycle carbon assessment guidance and its reporting template, which sets the required modules, benchmarks and the pre- and post-construction reporting stages. Check the current version, because the template and the benchmarks have been updated since the plan was adopted.

Assumptions that change the answer most

If you have limited time to interrogate an assessment, these are the inputs to test.

The structural option, because structure and substructure usually dominate A1 to A3. The assumed service lives driving B4 replacements. The gross internal area used as the denominator, which can flatter a result if measured generously. The treatment of module D. The concrete specification, particularly cement replacement levels and whether the assumed mix is achievable for the programme. The reuse assumptions for any retained structure, which need survey evidence rather than optimism. And the decarbonisation trajectory applied to grid electricity in B6.

Change any one of those and the headline figure moves. That is not a weakness of the method, but it does mean an assessment without a stated assumption set is a number rather than an analysis. Ask for the assumptions before you ask for the result.

Whole life carbon assessments are normally expected to be prepared by a suitably qualified assessor working to the current RICS professional standard, and professional review is strongly advised before submission.

PlanScope drafts sustainability and carbon documents structured to UK planning policy, with modelled figures and assumptions flagged for your assessor to supply. Browse the report types and start a draft. Reports should be reviewed before submission, and we do not guarantee planning approval.

Frequently asked questions

What do modules A, B, C and D cover?

A covers product and construction, from raw material supply through manufacture, transport to site and construction activities. B covers the use stage, including maintenance, replacement, operational energy and water. C covers end of life, from deconstruction to disposal. D reports benefits and loads beyond the system boundary, such as reuse, recycling potential and exported energy.

What is the difference between embodied and whole life carbon?

Embodied carbon is usually taken as modules A1 to A5, B1 to B5 and C1 to C4, meaning everything except operational energy and water. Whole life carbon adds the operational modules B6 and B7. Always state which scope a figure uses, because the same building can produce very different totals depending on the boundary.

Why is module D reported separately?

Because the benefits it describes accrue to a future system rather than to the building being assessed. The standard requires module D to be reported outside the total, so an assessment that subtracts it to reach a headline figure has overstated the result. Reviewers routinely ask for the total with and without it.

Which assumptions change a carbon result most?

The structural option, since structure and substructure usually dominate the product stage. Then assumed service lives driving replacements, the gross internal area used as the denominator, the concrete specification and cement replacement levels, reuse assumptions for retained structure, and any decarbonisation trajectory applied to grid electricity.

What carbon data should be used?

In order of preference: product-specific environmental product declarations for the products actually specified, manufacturer average declarations, industry or sector averages, and generic database figures. Generic data is appropriate early in design. At planning submission, heavy reliance on generic figures for the structure reduces the weight the assessment carries.

Sources and further reading

whole life carbonembodied carbonricssustainabilitylondon plannet zero

This article is general guidance about the planning system in England and, where stated, the rest of the UK. It is not legal or professional advice. Check your local planning authority’s validation requirements and take professional advice for your specific site.

More in Energy, Sustainability and Carbon

View all →
Energy, Sustainability and Carbon6 min read

Renewable energy requirements on employment units

A renewables percentage applied to a shell and core warehouse depends entirely on what it is measured against. How to settle the definition and draft a condition that can be complied with.

Read article →
Energy, Sustainability and Carbon7 min read

Solar panels on a pitched roof: permission and policy

Class A of Part 14 allows roof-mounted solar on a house, including the front slope and in conservation areas, subject to a 0.2 metre projection limit and conditions on appearance.

Read article →
Energy, Sustainability and Carbon7 min read

Whole life carbon: modules A to C and what gets reported

Whole life carbon is modules A plus B plus C, with D reported separately and never netted off. What each module covers, which assumptions drive the result, and how to present it so a reviewer can check it.

Read article →
Energy, Sustainability and Carbon7 min read

Communal heat networks and what planning policy requires

National policy says little about site heat networks; the requirement comes from local plans and, in London, policy SI 3. What evidence persuades, how zoning changes the safeguarding argument, and which conditions work.

Read article →
Energy, Sustainability and Carbon8 min read

Heat pumps in an energy strategy: what officers check

A heat pump energy strategy is judged on three things: the seasonal performance figure against the design flow temperature, the external unit's location, and the noise assessment positions.

Read article →
Energy, Sustainability and Carbon7 min read

Future Homes Standard transitional rules for consented sites

A planning permission does not fix which edition of the energy requirements applies. The transitional mechanism works plot by plot, so the evidence of a start on each individual dwelling is what matters.

Read article →