Trees and Arboriculture

Woodland creation and when planning permission is needed

7 min readBy PlanScope Editorial Team

The trees need no planning permission. The screening opinion, the access track, the designated site consent and the grant conditions are four separate processes with four timescales.

Woodland creation planning permission is, in most cases, not needed. Planting trees is not a building, engineering or mining operation, and a change from farming to forestry is not treated as a material change of use, so the planting itself falls outside the definition of development in section 55 of the Town and Country Planning Act 1990. You do not apply to the council to plant a wood.

What you may well need is something else: a screening opinion from the Forestry Commission under the forestry environmental assessment regime, prior approval for the tracks and buildings that come with the wood, consent from Natural England if the land is designated, and evidence on land quality if you want a grant. Those are four separate processes with four separate timescales, and none of them is a planning application.

Whether planting is development at all

The starting point is the definition. Development means the carrying out of building, engineering, mining or other operations in, on, over or under land, or the making of any material change in the use of buildings or other land. Putting a tree in the ground is none of those.

Two qualifications are worth stating because they catch people out.

Ground preparation can cross the line. Normal forestry cultivation, scarifying, mounding and drainage on a modest scale goes with the planting. Large-scale earth moving, terracing a hillside or cutting substantial new drainage channels starts to look like an engineering operation, and at that point the council has an interest.

And the things that support the wood are frequently development in their own right. Tracks, gates, barns, stacking areas and deer fencing above two metres are all separate questions from the trees.

Where afforestation triggers environmental screening

This is the requirement most first-time planters miss. The Environmental Impact Assessment (Forestry) (England and Wales) Regulations 1999 bring afforestation, deforestation, forest roads and forest quarries within an assessment regime administered by the Forestry Commission rather than the local planning authority.

Above the stated area thresholds you need the Forestry Commission's opinion on whether the project is likely to have significant environmental effects, and consent if it is. The thresholds are lower in sensitive areas, which include National Parks, National Landscapes, sites of special scientific interest and scheduled monuments among others. Verify the current thresholds before you rely on a figure, because they have been amended.

Note what regime this is not. The Town and Country Planning EIA Regulations 2017 apply to development, and planting is not development, so the planning EIA process does not engage. Mixing the two up is common and it wastes months.

Project element Consent route Body
The planting itself None under planning n/a
Afforestation above the threshold area Screening opinion, then consent if required Forestry Commission
Access tracks and forestry buildings Prior notification and approval Local planning authority
Works on a designated site Consent Natural England
Works affecting a scheduled monument Scheduled monument consent Historic England route
Later felling Felling licence Forestry Commission

Access tracks, fencing and buildings that do need permission

Part 6 of Schedule 2 to the General Permitted Development Order 2015 gives rights for development reasonably necessary for forestry on land used for that purpose, covering buildings, private ways and associated operations. Those rights come with conditions, and the important one is procedural: the siting, design and external appearance of a building, and the siting and means of construction of a private way, need the local planning authority's prior approval before work begins.

So a forestry track is not simply permitted. You submit details, the authority has a period in which to decide whether it wishes to approve them, and you wait. Build first and you have unauthorised development on a site where the enforcement position is straightforward.

Dwellings are excluded from Part 6 entirely. A forestry worker's dwelling is a full planning application with an occupational need case to make, and it is a hard case in open countryside.

Fencing sits under a different part of the Order, with a general two metre limit away from a vehicular highway. Most deer fencing comes in under that, and a higher fence needs permission.

Best and most versatile land

National policy expects the economic and other benefits of the best and most versatile agricultural land to be taken into account, meaning grades 1, 2 and 3a. Because planting is not development, that policy does not bite through a planning decision on the trees.

It bites in two other places. Grant schemes restrict or discourage planting on higher grade land and will ask for evidence of land classification. And if the wood later becomes part of the case for something that is development, a barn or a dwelling or a change of use, the land grade becomes a material consideration at that point.

Where the question matters, get the classification assessed rather than relying on the published provisional maps, which are drawn at a scale too coarse for a field. An Agricultural Land Classification survey is the document that settles it, and councils expect a suitably qualified author, usually a soil scientist, with professional review strongly advised.

Landscape and heritage effects of new planting

Trees are not always an environmental improvement, and this is the argument that catches people who assume planting is inherently benign.

New woodland changes an open landscape permanently. On a chalk downland, a heathland or an unenclosed upland edge, blocks of trees remove the very quality the designation protects, and objections from a National Park authority or a National Landscape partnership are common and well founded.

Heritage is the sharper risk. Tree roots damage buried archaeology, and planting on or near a scheduled monument requires consent under the Ancient Monuments and Archaeological Areas Act 1979. Ridge and furrow, earthworks, historic field patterns and designed landscapes can all be harmed by planting that nobody thought needed checking. Search the Historic Environment Record before you order stock.

Ecology cuts both ways too. Planting over species-rich grassland, wet meadow, or a site that supports ground nesting birds destroys a habitat of higher value than the woodland replacing it. Where the land adjoins existing ancient woodland, the buffer principles in our note on ancient woodland buffers apply to new planting as well, and where the site is a site of special scientific interest, operations require Natural England's consent under section 28E of the Wildlife and Countryside Act 1981.

Grant scheme requirements running in parallel

Public funding for woodland creation carries its own conditions, and they are usually stricter than anything in the planning system.

  1. Compliance with the UK Forestry Standard, which sets the baseline for design, species and protection.
  2. A woodland creation plan or design plan, with stocking densities, species mix and open space proportions.
  3. Evidence on land classification, designations, archaeology and protected species.
  4. Consultation with statutory bodies and, in many schemes, with neighbours and the local authority.
  5. Maintenance obligations lasting years, with payments tied to establishment.

Illustrative example: a 9 hectare block on former arable land, partly within a National Landscape. The owner obtains a Forestry Commission screening opinion, commissions a land classification survey and a Historic Environment Record search, submits prior notification for a 320 metre access track, and applies for grant funding with a design plan showing 20 per cent open space and a riparian buffer. No planning application is made for the planting. Figures here are illustrative.

Expect the grant timetable rather than the planning timetable to set your programme. Applications are seasonal and planting stock is ordered months ahead.

Evidence to assemble

Pull the documents together before you commit to anything, because each of them can stop the project.

A designations check covering statutory sites, National Landscapes and National Parks, scheduled monuments, registered parks and gardens, and public rights of way across the land. A Historic Environment Record search. A land classification position. A protected species and habitat appraisal appropriate to the site. A soil and drainage assessment. And a landscape appraisal where the site is prominent or designated, which a Landscape Strategy can frame.

Keep the rights of way question in view. Planting that obstructs a public footpath is an offence, and the route has to stay open at its legal width throughout establishment, which means the planting plan has to respect it rather than the contractor working around it later.

And think about the exit. Woodland you plant will one day need thinning and felling, which brings the felling licence regime and possibly a woodland management plan into play. Our note on woodland orders and felling licences sets out how those interact.

Enter your postcode on PlanScope to see which reports a rural project at your site is likely to need. This is general guidance, not legal advice; check the position with your local planning authority or a qualified professional before relying on it. PlanScope provides AI-assisted draft reports for planning applications. Reports should be reviewed before submission. We do not guarantee planning approval.

Frequently asked questions

Do I need planning permission to plant a wood?

Generally no. Planting is not a building, engineering or mining operation, and a change from farming to forestry is not treated as a material change of use, so it falls outside the definition of development in section 55 of the Town and Country Planning Act 1990. The associated tracks and buildings are a separate matter.

What is forestry environmental screening?

Under the Environmental Impact Assessment (Forestry) (England and Wales) Regulations 1999, afforestation above stated area thresholds needs an opinion from the Forestry Commission on whether the project is likely to have material environmental effects, and consent if it is. Thresholds are lower in sensitive areas and have been amended, so verify the current figures.

Is a forestry access track permitted development?

Part 6 of Schedule 2 to the GPDO 2015 covers private ways reasonably necessary for forestry, subject to a procedural condition: the siting and means of construction need the local planning authority's prior approval before work begins. So the right exists but you must submit details and wait for the authority's response.

Can I plant on best and most versatile land?

Planting itself is not a planning decision, so national policy on higher grade agricultural land does not bite through a permission. It bites through grant scheme rules, which restrict or discourage planting on grades 1, 2 and 3a, and later if the wood forms part of a case for something that is development.

Does planting ever harm heritage or ecology?

Frequently. Roots damage buried archaeology, and planting on or near a scheduled monument requires consent under the Ancient Monuments and Archaeological Areas Act 1979. Planting over species-rich grassland or ground nesting bird habitat destroys something of higher value than the woodland replacing it. Search the Historic Environment Record before ordering stock.

What if the land is a site of special scientific interest?

Operations on a site of special scientific interest require Natural England's consent under section 28E of the Wildlife and Countryside Act 1981, and planting is such an operation. That consent is separate from planning and from forestry screening, and proceeding without it carries its own penalties. Check the designation before any ground preparation.

Sources and further reading

woodland creationforestrypermitted developmentafforestationrural

This article is general guidance about the planning system in England and, where stated, the rest of the UK. It is not legal or professional advice. Check your local planning authority’s validation requirements and take professional advice for your specific site.

More in Trees and Arboriculture

View all →
Trees and Arboriculture7 min read

Tree planting conditions: species, size and maintenance

Tree planting conditions ask for a plan, a species schedule, a specification and a maintenance period. A complete discharge package is usually determined without correspondence.

Read article →
Trees and Arboriculture7 min read

Pruning specifications councils will condition

Reduce by 30 per cent means nothing to a tree officer. BS 3998 specifies pruning by the dimensions of the crown that remains, and a specification written that way can be approved in one pass.

Read article →
Trees and Arboriculture7 min read

Soil volumes and pit design for new street trees

Soil volume decides whether a street tree reaches the size on the drawing or dies at fifteen years. Sizing it from mature canopy area, and specifying the pit, matters more than species choice.

Read article →
Trees and Arboriculture7 min read

Answering a tree officer's loss of amenity objection

A tree officer's objection is a professional opinion, not a refusal. Answer it on arboricultural terms by isolating what is disputed and evidencing that point alone.

Read article →
Trees and Arboriculture7 min read

Trees, subsidence and the planning answer

Blaming a protected tree for cracks is not enough. Consent turns on a full season of monitoring, trial pits, soil desiccation data and root identification, plus the heave risk of removal.

Read article →
Trees and Arboriculture6 min read

Woodland creation on a development site and its upkeep

New woodland is easy to draw and hard to keep alive. The planting design, the establishment regime and the legal mechanism all have to agree with each other.

Read article →