Householder Extensions and Conversions

Wrap around extensions and the Class A limits

7 min readBy PlanScope Editorial Team

Rear limits and side limits both apply to a wrap around, and the side element usually fails first. How to work out whether yours is permitted development.

A wrap around extension has to satisfy the rear limits and the side limits of Class A at the same time, and the side element is what usually fails. Under Part 1 of Schedule 2 to the Town and Country Planning (General Permitted Development) (England) Order 2015, a side extension must be single storey, no more than 4 metres high, and no wider than half the width of the original dwellinghouse. A wrap around extension planning question therefore begins with a tape measure on the front of the house rather than with the rear garden.

The second thing that catches people is that the larger home extension route, the one giving 6 metres of depth on a terrace or semi through prior approval, applies only to rear extensions. Wrap the extension round the side and that route closes.

How the rear and side limits interact

Take the two elements separately and apply both sets of limits to the relevant part.

For the rear element on a terraced or semi-detached house, a single storey extension may project 3 metres beyond the rear wall of the original house, or 4 metres on a detached house, with a maximum height of 4 metres. The prior approval route doubles those depths to 6 and 8 metres, subject to a neighbour consultation process, and only for extensions that do not also extend beyond a side wall.

For the side element, the extension must be single storey, no more than 4 metres high, and no more than half the width of the original dwellinghouse. That last figure is measured against the original house, not against the house as it stands today.

Where the two meet in an L, every part has to comply with the limits that apply to it. A 3 metre rear projection with a side element 2.5 metres wide on a house originally 6 metres wide works. The same rear projection with a side element 3.5 metres wide does not, because it exceeds half the original width.

Width restrictions on the side element

Measure the original dwellinghouse at its widest point on the elevation the side extension will sit against, and halve it. That is your maximum.

Two mistakes recur. Measuring the house as extended, which is wrong and generous. And measuring the plot rather than the building, which is wrong and much more generous.

On a typical two bedroom terrace around 5 metres wide, the side element cannot exceed 2.5 metres, which after wall thicknesses gives an internal width of about 2.2 metres. That is a corridor, a utility or a widened kitchen, not a room. If you need more than that, you are applying for permission, and knowing so on day one changes the whole design conversation.

Article 2(3) land removes the side extension entirely. In a conservation area, a National Park, a National Landscape, the Broads or a World Heritage Site, Class A does not permit any extension beyond a side wall of the original dwellinghouse, so a wrap around is never permitted development in those areas.

Height at the eaves next to a boundary

Within 2 metres of a boundary of the curtilage, the eaves height of the extension must not exceed 3 metres. On a wrap around this bites twice, because both the side element and the flank of the rear element are usually close to a boundary.

The practical consequence is a flat roof or a low mono-pitch along the boundary edge, with any height gained towards the middle of the plot. It is also the reason so many wrap arounds end up with a flat roof and rooflights rather than a pitched roof, and why the internal ceiling height at the perimeter can be disappointing if nobody checked the levels first.

Measure from the highest ground level next to the building, not from the internal floor. On a sloping plot that distinction can be several hundred millimetres, which is the difference between complying and not.

Cumulative effect of earlier extensions

Class A is cumulative. The limits apply to the enlarged house as a whole, which means any previous extension counts against your allowance even if it was built by someone else forty years ago.

A house with an existing 2 metre rear addition has 1 metre of remaining depth under the ordinary rear limit, not 3. A house with an existing side addition of a quarter of its original width has a quarter left. And separately, the total area of ground covered by buildings within the curtilage, excluding the original house, must not exceed half the area of the curtilage, which catches large gardens with outbuildings less often than it catches small ones with a garage and a shed.

Check the planning history before you draw. Historic aerial imagery, the council's online register and the title plan will usually tell you what was there and when.

The original dwellinghouse and why it matters

Original means the house as it was first built, or as it stood on 1 July 1948 for anything older. Not as you bought it, and not as the previous owner left it.

This is the definition that decides the side width calculation and the cumulative rear depth, and it is the one most often got wrong. A 1930s semi that was widened in 1975 is measured on its 1930s width.

Where the history is unclear, a Lawful Development Certificate for proposed works under section 192 of the Town and Country Planning Act 1990 is the way to get the council's formal view before spending money. It is the only formal way to confirm that works are lawful, and it is worth having on any wrap around, because the calculation is exactly the sort of thing a buyer's conveyancer will query.

Design of the resulting rear elevation

A compliant wrap around is not automatically a good one. The elevation that results is usually long, low and flat roofed, running the full width of the plot, and it can read as a lean-to if the glazing and the roof edge are not handled with care.

Three moves help. Break the roof line, with a raised section or a rooflight run over the deeper part. Vary the glazing rather than running one continuous band of bifolds. And keep a proportion of solid wall at the junction with the original house so the old rear elevation stays legible.

Materials matter for compliance as well as for looks. Class A requires materials of similar appearance to the existing house for exterior work, and the materials of similar appearance test applies to a wrap around as much as to anything else. A dark grey render wrap on a red brick semi is not obviously similar in appearance.

Deciding between permitted development and an application

Go the permitted development route where the calculations work with room to spare, where the planning history is clear, and where the neighbours are not a concern. Certainty is fast and free of policy argument.

Apply where any of the following is true: the side element needs to be wider than half the original width, the house is on article 2(3) land, the eaves cannot come down to 3 metres near the boundary, the cumulative position is unclear, or the design you actually want breaks a limit by a small margin. A householder application takes eight weeks and gives you the design rather than the compromise.

A Planning Statement explaining the relationship to neighbouring gardens and the daylight position does most of the persuading on a householder application, and on a terrace the side return infill analysis is the closest comparison for the side element. A formal Design and Access Statement is not required for most householder applications, though a page of design reasoning attached to the drawings serves the same purpose.

This is general guidance, not legal advice. Permitted development rights vary with designations, conditions and Article 4 directions, so check the position with your local planning authority or a qualified professional before relying on it.

Enter your postcode on PlanScope to see which documents your extension is likely to need. Reports should be reviewed before submission, and we do not guarantee planning approval.

Frequently asked questions

Can a wrap around extension be permitted development?

Yes, where every part complies with the limits that apply to it. The rear element must meet the rear depth and height limits, and the side element must be single storey, no more than 4 metres high and no wider than half the width of the original dwellinghouse. On article 2(3) land side extensions are not permitted at all.

How is the half width rule measured?

Against the original dwellinghouse, meaning the house as first built or as it stood on 1 July 1948 for older properties, measured at its widest point. Not the house as extended, and not the plot. On a 5 metre wide terrace the side element cannot exceed 2.5 metres overall, giving roughly 2.2 metres internally.

Can I use the 6 metre larger home extension route?

Not for a wrap around. The prior approval route that allows 6 metres of depth on a terraced or semi-detached house, and 8 metres on a detached house, applies only to rear extensions. An extension that also projects beyond a side wall falls outside it, so the ordinary 3 and 4 metre limits apply.

What is the eaves height limit near a boundary?

Three metres where any part of the extension is within 2 metres of a boundary of the curtilage. Height is measured from the highest ground level next to the building rather than from the internal floor, which matters on a sloping plot. This limit is why most wrap arounds end up flat roofed along the boundary.

Do earlier extensions count against my allowance?

Yes. Class A limits apply cumulatively to the house as enlarged, so an extension built by a previous owner counts. A house with an existing 2 metre rear addition has 1 metre of ordinary rear depth remaining. Separately, buildings within the curtilage other than the original house must not cover more than half the curtilage.

Sources and further reading

permitted developmentextensionclass ahouseholdergpdodesign

This article is general guidance about the planning system in England and, where stated, the rest of the UK. It is not legal or professional advice. Check your local planning authority’s validation requirements and take professional advice for your specific site.

More in Householder Extensions and Conversions

View all →
Householder Extensions and Conversions7 min read

Counting back to the original dwellinghouse

Previous owners' extensions eat into your allowance, and conservatories count. Here is how the original dwellinghouse baseline is fixed and proved.

Read article →
Householder Extensions and Conversions7 min read

Householder applications where Article 4 applies

An Article 4 direction withdraws a permitted development right, it does not ban the work. Here is how to read the schedule and apply without a fee.

Read article →
Householder Extensions and Conversions7 min read

Decking and raised platforms in a garden

The 300 millimetre raised platform threshold decides whether garden decking needs permission. Here is how it is measured and what an application must show.

Read article →
Householder Extensions and Conversions7 min read

Replacing windows: when it is development at all

A like for like window swap is usually not development. Changing material, opening pattern or glazing bars can be, and flats and listed buildings follow different rules.

Read article →
Householder Extensions and Conversions7 min read

Dormer windows on a front roof slope

Class B of Part 1 excludes work extending beyond a roof slope that forms the principal elevation and fronts a highway. Both limbs must apply, so a few front slopes can still take a dormer.

Read article →
Householder Extensions and Conversions7 min read

Annexes for a dependent relative and the planning unit

An annexe for a relative is lawful as part of the house while it remains ancillary. Access, kitchen provision, garden division and separate services decide whether a second planning unit has been created.

Read article →