Protected Species Survey

Protected species surveys are specialist ecological assessments that determine whether legally protected wildlife is present on or near a development site. Under UK wildlife law, it is an offence to kill, injure, or disturb protected species or damage their habitats without a licence. Getting this wrong can result in prosecution, injunctions, and significant project delays.

Typical Cost

£300 – £5,000+

Turnaround

1 – 6 weeks

AI Report

Minutes

Generate your Protected Species Survey with AI

Skip the weeks of waiting. Get a professional draft in minutes.

Get Started

What is a Protected Species Survey?

A protected species survey is a targeted field survey designed to establish whether a particular protected species or group of species is using a site. Each species group has its own established survey methodology, seasonal constraints, and minimum survey effort requirements set out in published guidelines. The survey determines whether the species is present, the size and status of the population, how the species uses the site (breeding, foraging, commuting, hibernating), and the likely impact of the proposed development.

When is a Protected Species Survey required?

Protected species surveys are required when a Preliminary Ecological Appraisal or other initial assessment identifies that protected species could reasonably be present on or adjacent to the development site. The local planning authority's ecologist will review the PEA and request specific surveys based on the habitat features present. Common triggers include buildings with bat roost potential, ponds within 500 metres for great crested newts, scrubby vegetation for reptiles, sett-like holes for badgers, and watercourses for water voles and otters.

What does a Protected Species Survey include?

A protected species survey report includes a description of the survey methodology used, the dates, times, and weather conditions of each survey visit, the results including species recorded and population estimates where applicable, an assessment of the conservation status of the species at the site, an evaluation of the likely impact of the development, proposed mitigation and compensation measures, and details of any licensing requirements. For bat surveys, this may also include static detector data and sonogram analysis.

How much does a Protected Species Survey cost?

Costs vary significantly depending on the species being surveyed. Bat emergence surveys cost £400 to £700 per visit, with multiple visits usually required. Great crested newt presence/absence surveys (eDNA) cost £300 to £600, or £1,500 to £3,000 for full population surveys. Reptile surveys typically cost £500 to £1,500 for a standard seven-visit programme. Badger surveys cost £300 to £800. Water vole surveys range from £500 to £1,500. A site requiring multiple species surveys can easily accumulate costs of £3,000 to £8,000 or more.

Who can prepare a Protected Species Survey?

Protected species surveys must be carried out by ecologists with the appropriate expertise and, where legally required, a valid survey licence. Bat surveys require a Natural England Class Licence or individual survey licence. Great crested newt surveys similarly require a survey licence. Badger surveys do not require a licence, but disturbance of setts does. All surveyors should be suitably experienced and hold membership of the Chartered Institute of Ecology and Environmental Management (CIEEM) at an appropriate level.

How long does a Protected Species Survey take?

The critical factor is seasonal timing. Bat activity surveys must be conducted May to September. Great crested newt surveys run from March to June (eDNA: April to June). Reptile surveys are best conducted April to June and September. Breeding bird surveys span March to June. Dormouse surveys require nest tube monitoring from April to November. Because of these seasonal constraints, missing a survey window can delay your planning application by up to 12 months. This is why early commissioning of ecological surveys is essential.

Frequently Asked Questions

Which species are legally protected in the UK?

The main protected species encountered on development sites include all 18 UK bat species, great crested newts, badgers, all native reptile species, water voles, otters, dormice, red squirrels, barn owls, and nesting birds (all wild birds are protected while nesting). Protection comes from the Wildlife and Countryside Act 1981, the Conservation of Habitats and Species Regulations 2017, and the Protection of Badgers Act 1992. The level of protection varies between species.

What happens if protected species are found on my site?

Finding protected species does not automatically prevent development. It means that the impacts must be properly assessed and appropriate mitigation or compensation measures designed. For European protected species such as bats and great crested newts, a Natural England licence will be required before works can proceed. The licensing process requires you to demonstrate that there is no satisfactory alternative, that the development is for imperative reasons of overriding public interest, and that the conservation status of the species will be maintained.

Can I carry out protected species surveys at any time of year?

No. Each species group has specific survey seasons dictated by their ecology and behaviour. Bat emergence surveys must be done between May and September. Great crested newt surveys are valid from mid-March to mid-June. Reptile surveys should be conducted in April to June and September to October. Missing the correct survey window means waiting until the following year, which is why planning ahead is critical.

What is an eDNA survey for great crested newts?

An eDNA (environmental DNA) survey involves collecting water samples from ponds and analysing them in a laboratory for traces of great crested newt DNA. It is a reliable and cost-effective method for determining presence or likely absence. Samples must be collected between mid-April and late June when newts are breeding. A positive eDNA result confirms presence; a negative result provides reasonable confidence of absence, though it does not guarantee it absolutely.

Do I need a licence to survey for badgers?

You do not need a licence to survey for badger setts or signs of badger activity, provided the survey does not involve entering or blocking a sett or otherwise disturbing badgers. However, if the development will affect a badger sett — through closure, disturbance, or destruction — a licence from Natural England is required before any works can proceed. It is an offence under the Protection of Badgers Act 1992 to interfere with a sett without a licence.

How many bat survey visits are needed for a building?

The number of visits depends on the building's assessed potential to support roosting bats, as determined during the Preliminary Roost Assessment. Low potential: one dusk emergence or dawn re-entry survey. Moderate potential: two surveys, at least one dusk and one dawn, separated by at least two weeks. High potential: three surveys, at least two dusk and one dawn, with a minimum two-week gap between visits. These requirements follow the Bat Conservation Trust survey guidelines.

What is a European Protected Species licence?

A European Protected Species (EPS) mitigation licence is issued by Natural England (or equivalent bodies in Wales and Scotland) and permits activities that would otherwise be illegal under the Conservation of Habitats and Species Regulations 2017 — such as destroying a bat roost or capturing and relocating great crested newts. The licence application must include a detailed method statement prepared by a licensed ecologist and typically takes 30 working days to determine.

Can I start building before protected species surveys are complete?

This is extremely risky. Starting works before surveys are complete could result in killing or injuring protected species, which is a criminal offence carrying unlimited fines and up to six months imprisonment. The planning authority can also issue a stop notice requiring all works to cease. Even if no protected species are ultimately found, the absence of surveys means you cannot demonstrate due diligence, and enforcement action is likely.

How long are protected species survey results valid?

Survey results are generally considered valid for one to two breeding or activity seasons, depending on the species. If more than two years have passed since the survey, most planning authorities will require updated surveys. Site conditions can change rapidly — new habitats may establish, species may colonise or abandon sites — so recent survey data is essential for an accurate impact assessment.

What is a District Level Licence for great crested newts?

The District Level Licence (DLL) is a strategic approach to great crested newt conservation that allows developers to make a financial contribution to a habitat compensation scheme rather than carrying out individual site surveys and mitigation. It is administered by Natural England and currently available in participating local authority areas. The DLL can significantly reduce delays and survey costs, but it is not available everywhere, so check whether your local authority participates in the scheme.