AI and Planning

What an inspector notices in a poorly drafted statement

6 min readBy PlanScope Editorial Team

Statements that fail share one defect. They assert the conclusion the inspector is being asked to reach without supplying the material that makes it available.

Read twenty written representations decisions in a row and the appeal statement common faults stop looking like style problems. They are structural. The statements that fail share the same defect: they assert a conclusion the inspector is being asked to reach, without putting the inspector in a position to reach it.

An inspector determining a section 78 appeal has to decide the case on its planning merits, applying section 38(6) of the Planning and Compulsory Purchase Act 2004, and has to give reasons. Every sentence in your statement either helps that reasoning or gets in its way.

Assertion doing the work that evidence should

"The proposal would not harm the character of the area" is a conclusion. It is the conclusion the inspector has to reach, and writing it down does not advance it.

What advances it is the material that makes the conclusion available. The prevailing plot widths on the street, measured. The ridge heights of the neighbouring pairs. The fact that three properties in the same terrace already have two-storey rear additions of similar depth, with their application references. Photographs taken from the viewpoints the officer used.

The pattern to watch for in your own drafting is the adjective doing structural work. Modest, subordinate, appropriate, sympathetic, in keeping. Each of those needs a measurement or a comparison behind it in the same paragraph, or it is decoration.

This is where AI-assisted drafting helps least and is most often misused. A draft can produce a well-organised paragraph asserting that a scheme respects local character. It cannot know the plot widths. Unverified facts should be flagged rather than smoothed over, and the flags are the work list, which is the same discipline described for factual errors to look for in a drafted planning document.

Policy quoted and never applied

The commonest padding in appeal statements is a block quotation of a development plan policy followed by a sentence saying the proposal accords with it.

Policies contain tests. A design policy might require development to respect the scale, form and materials of its surroundings, respond to the topography, and retain boundary planting. That is three tests and a fourth. An inspector reading a statement that quotes the policy and asserts compliance has to work out for themselves which limb is in dispute.

Do the work instead. Set out the limb, state the fact, state the consequence. Where a limb is not met, say so and explain why it does not tip the balance, because the inspector will find it anyway and a concession made voluntarily costs less than one extracted.

Cite the Framework by its current edition. The Framework published on 17 August 2026 is organised by policy codes rather than the paragraph numbers used in earlier editions, so a statement citing paragraph numbers from a 2023 or 2024 copy tells the inspector something unhelpful about how recently the drafting was checked. Verify the current reference on gov.uk before you file.

Drifting away from the reasons for refusal

The reasons for refusal are the agenda. An inspector will address them, and anything else you raise competes for attention with the things that actually decide the appeal.

Structure the statement around them. One main heading per reason, in the council's order, using the council's own words as the heading. If there are three reasons and your statement has seven sections, two of which deal with the history of your dealings with the case officer, the balance is wrong.

Where a reason for refusal has been overtaken, say so early and shortly. If the council's ecology objection has been resolved by a survey carried out since refusal, put that in the second paragraph rather than on page 14.

And resist rebutting third party representations at length unless the inspector will have to deal with them. Objections that raise non-material matters need one sentence, not three pages.

Comparisons with other sites that go nowhere

Every planning consultant has been handed a photograph of something down the road and told to use it.

Comparisons can work. They need three things: evidence that the comparator was permitted rather than merely built, the application reference and decision date, and an explanation of why the circumstances are materially similar. Without all three, an inspector will note that each case is determined on its own merits and move on.

Appeal decisions are worth citing where they deal with the same issue, and they should be described as indicative of how inspectors have approached a question rather than as binding precedent. Quote the relevant passage, give the reference, and explain the similarity in facts. A list of appeal references with no analysis attached is worse than nothing, because it invites the inspector to read them and find the distinctions.

Length that buries the argument

Long statements are not more thorough. They are usually less edited.

The problem is not the page count as such. It is that the decisive point ends up on page 22 with the same weight as a paragraph about the site's bus connectivity. If you cannot say in two sentences at the top what the appeal turns on, the statement is not ready.

A practical test. Write the paragraph you would want the inspector to write in the decision letter. If your statement does not give them everything needed to write it, add that. If it contains material that has nothing to do with it, cut that. The internal review checklist for submissions is the place to make that a habit rather than an intention.

Appendices nobody is asked to open

An appendix that is never referenced in the text will not be read, and should not be there.

Every appendix needs a call-out at the point where it matters, with a page or figure reference. "The tree constraints plan at Appendix C shows the root protection areas, and the proposed footprint at Figure 2 sits outside all of them" does something. "See Appendix C" does less. A bare list of appendices does nothing at all.

The same applies to technical reports prepared by others. Summarise the finding in the statement, in your own words, with a reference to the paragraph in the report. Inspectors notice when a statement quietly hopes a 90 page acoustic report will be taken as read.

Writing for the decision rather than the client

The hardest habit to break is writing to reassure the client that their money is being spent.

Signs of it: adjectival praise for the scheme, criticism of the council's conduct, references to the applicant's personal circumstances where they are not a material consideration, and a tone of grievance. None of it helps, and the costs regime cuts both ways. Unreasonable behaviour can attract an award against either party, so a statement that spends its energy attacking the authority rather than the reasons for refusal carries a risk of its own.

The register that works is flat and factual. State the issue, state the evidence, state the conclusion, move on. The same discipline that makes a design and access statement an officer can use makes an appeal statement an inspector can use, and both are written for a reader with a decision to justify.

One honest uncertainty. Inspectors vary in how much weight they give to written material against what they see on site, and a site visit sometimes resolves a point that pages of argument did not. Write the statement so that it directs attention to the right places on site, with viewpoints marked on a plan, and it will work whichever way that falls.

Authorship matters too, and the question of who wrote your report reaches appeals as well as applications.

This is general guidance, not legal advice. Check the position with a qualified planning professional before relying on it. PlanScope provides AI-assisted draft reports for planning applications. Reports should be reviewed before submission. We do not guarantee planning approval.

Frequently asked questions

How should an appeal statement be structured?

Around the reasons for refusal, in the council's order, using the council's own wording as the headings. Anything outside them competes for attention with the issues that decide the appeal. Where a reason has been overtaken by evidence produced since refusal, say so in the opening paragraphs rather than deep in the document.

Can I rely on other developments nearby?

Only with evidence. You need proof the comparator was permitted rather than merely built, its application reference and decision date, and an explanation of why the circumstances are materially similar. Without all three an inspector will note that each case is determined on its own merits and give the comparison no weight.

Are appeal decisions binding on an inspector?

No. They are indicative of how inspectors have approached an issue rather than precedent. Cite them where the issue is the same on the facts, quote the relevant passage, give the reference and explain the factual similarity. A list of references with no analysis invites the inspector to find the distinctions for themselves.

Does a longer statement carry more weight?

No, and it often carries less. The risk with length is that the decisive point sits on page 22 with the same prominence as a paragraph about bus routes. If the appeal issue cannot be stated in two sentences at the top of the statement, the drafting is not finished.

Can an appeal statement attract a costs award?

Yes, in both directions. Costs can be awarded where a party has behaved unreasonably and put the other to unnecessary expense. A statement that devotes its energy to criticising the authority rather than engaging with the reasons for refusal carries a risk, as does an authority defending reasons it cannot substantiate.

Sources and further reading

appealsplanning inspectoratewritten representationsdraftingevidence

This article is general guidance about the planning system in England and, where stated, the rest of the UK. It is not legal or professional advice. Check your local planning authority’s validation requirements and take professional advice for your specific site.

More in AI and Planning

View all →
AI and Planning6 min read

Why an AI draft flags a missing site fact

A plausible invented floor level is worse than a blank, because nobody checks it. How to read the flags in a draft as a scope document for the application.

Read article →
AI and Planning6 min read

What a validation officer checks that AI cannot know

Validation turns on administrative facts about a specific site, owner and council. The six checks to run on a drafted report before it is submitted.

Read article →
AI and Planning7 min read

Where site judgement cannot be drafted in a design statement

A draft can carry the structure, the policy references and the checklist. Context, character and the access arrangements that depend on levels come from looking.

Read article →
AI and Planning6 min read

Explaining an AI-assisted draft to a client or a committee

Sooner or later a client, an officer or an objector asks how a document was produced. A planner who has thought about the answer in advance gives a better one.

Read article →
AI and Planning7 min read

Why planning applications are returned as invalid

Validation is a completeness check against the national requirements and the council's own local list. Here are the defects that cause a return and how to deal with an invalidity notice.

Read article →
AI and Planning7 min read

Drafting to an appeal deadline without cutting corners

Appeal timetables do not move, and a statement of case submitted late is normally returned unread. Here is where drafting buys time and where only evidence will do.

Read article →