Balcony design where combustible materials are restricted

7 min readBy PlanScope Editorial Team

On relevant buildings a balcony is a specified attachment, so decking, soffit and balustrade must reach A2-s1,d0. The depth, drainage and amenity consequences land on the planning drawings.

The balcony combustible materials restriction changes the architecture before it changes the fire strategy. On a relevant building, regulation 7(2) of the Building Regulations 2010 requires materials in the external walls and in specified attachments to achieve European class A2-s1,d0 or better, and a balcony attached to an external wall is a specified attachment. Timber decking, timber soffits and timber handrails are out. What replaces them is heavier, deeper and drains differently, and all three consequences land on the planning drawings.

Architects who treat this as a building control matter to resolve after permission end up with a consented elevation they cannot build.

Which buildings the restriction applies to

The regulation 7(2) requirement applies to relevant buildings, defined by height and use. The height trigger is a storey at least 18 metres above ground level, and the use categories cover dwellings, institutions and rooms for residential purposes, with later amendments bringing hotels, hostels and boarding houses within scope and banning metal composite material panels more widely. Check the current consolidated text, because this area has been amended several times since 2018.

Below 18 metres the regulation does not apply, but two other things do. Approved Document B sets provisions for buildings above 11 metres, including sprinkler provision in blocks of flats, and many clients and warranty providers apply an A2 specification to balconies below 18 metres as a matter of policy. So the practical cut off in the market is lower than the regulatory one.

Separately, a scheme that meets the definition of a relevant building for Planning Gateway One needs a Fire Statement with the planning application under Article 9A of the Development Management Procedure Order 2015, and the Health and Safety Executive is a statutory consultee. The balcony specification is one of the things the statement has to address, which means the decision has to be made before submission rather than at technical design.

What the restriction covers on a balcony

The attachment is the whole assembly where it is fixed to the external wall: the structural frame or cantilever, the deck, the soffit or underside lining, the balustrade including infill panels and handrail, any privacy screen, and the drainage components. Regulation 7(3) exempts a list of minor components such as seals, gaskets, fixings, membranes and thermal break material, so a compliant assembly is not impossible. It is just not a timber one.

Two items catch people out. Privacy screens between adjacent balconies are part of the attachment, so a timber slatted screen that solves an overlooking objection at committee is not available. And planters, trellis and soft landscaping fixed to the balustrade raise the same question, which is why conditions about balcony planting on upper floors of tall buildings need thinking about before they are agreed.

Decking, soffit and balustrade choices that remain

Element Usual compliant options Design consequence
Deck Extruded aluminium planks, steel grating, concrete topping, mineral based board Metallic appearance, acoustic ring underfoot, thermal gain in summer
Soffit Aluminium or steel sheet, cement board, exposed concrete Visible fixings and joint lines on the elevation below
Balustrade frame Steel or aluminium posts and rails Heavier sections than a glazed timber capped detail
Infill Toughened or laminated glass, perforated metal, mesh Reflectivity, cleaning access, wind loading
Handrail capping Metal, with a thermal break where needed Cold to touch, so position matters on north elevations
Privacy screen Metal frame with glass or perforated infill Less visual softness than timber slats

Aluminium plank decking is the default on most schemes. It comes in widths that read as boards from the ground, which helps where a planning condition requires a particular appearance, but the colour range is narrower than a stained timber and it will not weather. Where the elevation relies on warmth, the places to find it are the soffit colour, the balustrade infill and the wall finish behind.

Mass timber structures raise the question in a sharper form, and our note on mass timber schemes and the questions planners ask covers how authorities and consultees approach those proposals.

Depth, drainage and the thermal break

Three dimensions move. A thermal break connector between the slab and a cantilevered balcony adds depth at the junction and constrains where the deck can sit relative to the internal floor level. A free draining aluminium deck needs a gap below for water to fall away, which adds build up. And a level threshold for accessibility has to be achieved across both of those.

Free draining decks throw water onto the balcony below unless the detail controls it. The usual answers are a solid tray under the deck draining to an outlet, a drip edge with a nosing that keeps water off the soffit, or a deliberate sacrificial strip at the outer edge. Each has a visible consequence on the elevation, and the first adds the complication of a rainwater pipe to show on the drawings.

Show the junction on a section at 1:10 in the planning submission if the elevation depends on a particular reveal or shadow gap. Officers approve elevations, and an elevation drawn with a 40 millimetre deck on a 200 millimetre cantilever will not survive the structural design.

Amenity space policy and the areas you still have to hit

The deeper build up and the heavier balustrade frame eat into the clear usable area, which is what policy measures. The London Plan sets minimum private outdoor space areas and a minimum depth and width, and many authorities outside London have their own standard in an adopted design guide or housing SPD. Measure the clear internal dimension between balustrade faces, not the structural extent.

Where the numbers do not work, the options are a wider cantilever, a recessed or inset balcony that borrows depth from the floor plate, a Juliet balcony with compensating communal provision, or a reduction in unit count. Taking the hit on amenity area and hoping it passes validation is a poor plan, because amenity standards are usually a local validation requirement and the application will be checked.

Illustrative example: a 19 storey block proposes 1.65 metre deep cantilevered balconies. A 90 millimetre thermal break connector plus a 60 millimetre drainage void plus a 90 millimetre balustrade base channel leaves 1.4 metres of clear depth, which drops the smaller units below the adopted minimum. The design moves to a 1.9 metre cantilever on the south elevation and inset balconies on the north. Dimensions are illustrative only.

Overheating and shading, pulled in two directions

A deep balcony shades the window below, which helps the Part O overheating assessment. A solid balustrade reduces cross ventilation at the opening behind it, which hurts. A metal deck in full sun raises the surface temperature of the amenity space itself, which neither assessment captures but occupants notice.

Run the Overheating Risk Assessment with the balcony geometry and balustrade porosity modelled as designed, not as a simplified rectangle. A perforated metal infill with a stated free area behaves differently from solid glass, and the difference can decide whether a unit needs mechanical cooling. Where the simplified method is used, check whether the balcony arrangement takes the unit outside its scope.

Writing the specification so the condition can be discharged

Materials conditions on tall buildings are now specific, and a schedule that says metal balustrade will be rejected. Submit a table listing each element, the product type, the finish and colour reference, and the reaction to fire classification with the test standard. Add a note on where samples will be made available.

Keep the fire classification evidence in the same file as the planning approval. The documents that matter later are the approved materials schedule, the classification reports for each attachment component, the approved sections showing the drainage detail, and the warranty provider's acceptance. Our note on structural warranties and what the planning file should hold explains how to assemble that record.

And decide the deck product early. Changing it after permission usually changes the elevation, which means a section 96A amendment at best and a fresh application at worst.

Fix the balcony assembly before the elevations are finalised. Enter your postcode on PlanScope to see which fire and sustainability documents your building is likely to need, and have any draft reviewed before submission. PlanScope provides AI-assisted draft reports for planning applications. We do not guarantee planning approval. This is general guidance, not legal advice, so check the position with your local planning authority or a qualified professional before relying on it.

Frequently asked questions

Which buildings are caught by the combustible materials restriction?

Regulation 7(2) of the Building Regulations 2010 applies to relevant buildings, defined by a storey at least 18 metres above ground level together with specified residential uses, extended by later amendments to hotels, hostels and boarding houses. Metal composite material panels are restricted more widely. The provisions have changed several times, so check the current consolidated text.

Is balcony decking part of the external wall?

A balcony attached to an external wall is a specified attachment, so the frame, deck, soffit, balustrade, privacy screen and drainage components fall within the requirement. Regulation 7(3) exempts minor components such as seals, gaskets, fixings, membranes and thermal break material, which is what makes a compliant assembly achievable in practice.

Can I still use timber decking below 18 metres?

The regulation 7(2) requirement does not apply, so timber is not prohibited by it. In practice many clients, insurers and warranty providers apply an A2 specification to balconies on buildings above 11 metres as a matter of policy, and Approved Document B contains separate provisions above 11 metres. Check the warranty position before committing.

How does the restriction affect private amenity space?

Thermal break connectors, drainage voids and heavier balustrade base channels all reduce the clear usable depth that policy measures. The London Plan and many local design guides set minimum areas and a minimum depth and width, measured between balustrade faces. Build the deductions into the plan early or widen the cantilever.

Does the balcony specification need to be in the fire statement?

Where the scheme is a relevant building for Planning Gateway One, a fire statement is required with the application under Article 9A of the Development Management Procedure Order 2015 and the Health and Safety Executive is consulted. The balcony assembly is one of the matters addressed, so the decision has to be made before submission.

Sources and further reading

balconiesfire safetybuilding regulationsamenity spacetall buildingsmaterials

This article is general guidance about the planning system in England and, where stated, the rest of the UK. It is not legal or professional advice. Check your local planning authority’s validation requirements and take professional advice for your specific site.

More in Fire, Structural and Basements

View all →
Fire, Structural and Basements6 min read

Working on a pavement vault beneath the footway

The highway authority consents cellars and vaults under a street separately from planning. Ownership of the subsoil is usually unresolved until you look.

Read article →
Fire, Structural and Basements6 min read

Basement car parks beneath residential blocks

Excavation, ventilation and a ramp buy you spaces that most urban transport policy now wants fewer of. Test the parking count against the evidence first.

Read article →
Fire, Structural and Basements7 min read

Roof terraces on tall buildings and escape provision

Amenity policy pushes communal space onto the roof of tall residential buildings. The fire strategy decides whether it can be built as drawn.

Read article →
Fire, Structural and Basements7 min read

Firefighting shafts in a single core apartment plan

The firefighting shaft is the largest fixed element on a residential floor plate. Five checks that take an hour each and decide whether the massing works.

Read article →
Fire, Structural and Basements7 min read

Bin stores, chutes and fire separation in plan

Five requirements compete for the same few square metres next to the entrance. How carrying distances, collection access and fire separation are reconciled.

Read article →
Fire, Structural and Basements7 min read

Car park ventilation and charging bays in a layout

Open-sided, naturally ventilated or mechanically ventilated is a planning-stage decision, not a technical design one. How it fixes elevations, plant and layout.

Read article →