Use Classes and Change of Use

Beauty salons, nail bars and tattoo studios: use class

8 min readBy PlanScope Editorial Team

Personal care services fall within Class E, so a former shop, bank or office can become a salon without planning permission. Conditions, article 4 directions, tattoo studios and extraction are where the work lies.

A beauty salon use class question almost always answers itself once you look at the Use Classes Order as amended in 2020. Hair and beauty salons, nail bars and most personal care businesses sit within Class E, the commercial, business and service class, because they provide services it is appropriate to provide in a commercial or service locality. Movement between uses inside Class E is not development, so a former shop, a former bank branch or a former office can become a salon without planning permission. Tattoo and piercing studios are the exception worth pausing over, and licensing is a separate matter from planning in every case.

Where personal care sits in Class E

Class E of the Town and Country Planning (Use Classes) Order 1987, as recast with effect from 1 September 2020, brought together retail, financial and professional services, cafes and restaurants, offices, light industry, clinics, nurseries and indoor fitness. Personal care services fall most comfortably within limb E(c)(iii), covering other services appropriate to a commercial, business or service locality.

Two adjacent limbs matter for reading the Order correctly. Limb E(e) covers medical or health services provided principally to visiting members of the public, which is where a clinic sits. A salon offering non-surgical cosmetic treatments delivered by a clinician can sit closer to E(e) than to E(c), and the distinction is about the nature of the service rather than the shopfront.

Tattoo studios are the genuine uncertainty. The Order does not name them, and authorities read the position differently, with some treating a studio as a Class E service and others as sui generis on the basis that it is not a service of a kind appropriate in a general commercial locality. Before you sign a lease on the strength of an assumed class, either get a written pre-application view or apply for a certificate of lawfulness for a proposed use under section 192 of the Town and Country Planning Act 1990. That certificate is the only way to make the answer binding.

Movement within Class E and the traps

Because a change from one use in Class E to another use in the same class is not development under section 55 of the 1990 Act, there is nothing to apply for. That is the whole point of the 2020 reform, and it is why changing use within Class E has become the default route for occupiers of small high street units.

Four things still stop it.

First, a planning condition. If the unit was permitted subject to a condition restricting it to retail use, or to a named use only, that condition overrides the general freedom and you need a section 73 application to vary it. Read the original decision notice rather than assuming.

Second, an article 4 direction. Councils have made directions covering movement within Class E in some centres, and a direction turns the free change back into a planning application.

Third, the existing lawful use may not be what the previous occupier's sign said. A unit that traded as a shop for three years without permission is not automatically in Class E, and proving the existing lawful use is the first piece of work on any change of use file.

Fourth, the unit may be sui generis already. A former hot food takeaway is not in Class E, and moving from a sui generis takeaway to a salon is a change of use requiring permission, even though the reverse direction is not permitted either.

Skin piercing and the separate licensing regime

Treatments that break the skin bring a registration or licensing requirement that runs entirely separately from planning. Sections 13 to 17 of the Local Government (Miscellaneous Provisions) Act 1982 provide for registration of premises and practitioners carrying out acupuncture, tattooing, ear-piercing and electrolysis. Section 120 of the Local Government Act 2003 extended that to cosmetic piercing and semi-permanent skin-colouring, which brings microblading and similar treatments into scope where the authority has adopted the provisions.

In London, the position is different again. The London Local Authorities Act 1991 provides a special treatment licensing regime covering a wider range of beauty and massage treatments, administered by the borough.

Keep the two regimes apart in your paperwork and in your conversations. A planning officer cannot refuse an application because the practitioner is not yet registered, and an environmental health officer cannot refuse registration because the use class is unresolved. What does happen is that the environmental health team is consulted on the planning application, and its comments on ventilation, waste and hygiene will read across.

Extraction for nail bars and solvent vapour

Acrylic nail systems release methacrylate vapour, and the smell travels. Local exhaust ventilation at each workstation, rather than a general extract in the ceiling, is what controls it, and the Health and Safety Executive publishes specific guidance on ventilation in nail bars under the Control of Substances Hazardous to Health Regulations 2002.

The planning question is what the ventilation looks like from outside and where it discharges. A duct on a rear elevation, a terminal above eaves level, or a flue on a building in a conservation area will need planning permission for the external alteration, separately from any change of use. Discharge close to a residential window above or behind the unit produces the objection that most often derails these applications.

Where extraction is part of the scheme, a ventilation and extraction statement setting out the system, the discharge point, the flow rate and the odour control measures will answer the officer's questions before they are asked. The same document does duty for the environmental health consultation.

Hours, plant noise and a residential parade

A salon in a parade with flats above is judged on amenity, not on retail policy. Three things are conditioned routinely: opening hours, plant operating hours, and the noise level from fixed plant at the nearest residential window.

Plant noise is assessed to BS 4142:2014+A1:2019 for sound of an industrial and commercial nature. Extract fans and air conditioning condensers are the usual culprits, and the lowest cost unit the shopfitter can source is where the problem starts. Specify the plant before you submit, get a sound power level from the manufacturer, and have the assessment done against measured background levels rather than assumed ones.

Late opening is the other pressure point. Evening appointments are commercially important and a 20:00 or 21:00 closing condition in a residential parade is common. Ask for the hours you actually need, with a reasoned justification, rather than asking for more and accepting a cut.

Waste, sharps and storage

Tattoo and piercing premises produce clinical waste and sharps, which must go through a licensed carrier under the duty of care in section 34 of the Environmental Protection Act 1990. That is a waste regulation matter, and planning only engages with the physical consequence: where the bins and the sharps containers are kept, whether they are enclosed, and how collections reach them.

Councils in dense parades care about this more than the volume of waste suggests. A refuse strategy on a plan, showing an enclosure with a door that opens onto a route a collection vehicle can reach, removes an easy reason for objection.

Signage and shopfront alterations

Most signage on a commercial unit needs advertisement consent under the Town and Country Planning (Control of Advertisements) (England) Regulations 2007, and some signs benefit from deemed consent within set limits on size, height and lighting. Internally illuminated fascia signs in conservation areas are usually resisted, and halo-lit or externally lit lettering is the compromise that tends to be accepted.

Replacing the shopfront itself is development. New stallrisers, a recessed entrance, a roller shutter or a change of glazing line all need permission, and in a conservation area the council will apply its shopfront design guidance. Where the building is listed, listed building consent is needed as well as planning permission, including for internal works.

What to submit if an application is needed

Where a condition, an article 4 direction or a sui generis starting point means you do need permission, the pack is short but it has to be specific.

  1. A plan showing the unit, its curtilage and the servicing arrangements.
  2. Evidence of the existing lawful use, with dates.
  3. Proposed hours of opening and of plant operation.
  4. A ventilation and extraction statement where treatments involve solvents, dust or heat.
  5. A plant noise assessment where fixed plant is proposed near residential windows.
  6. A refuse and recycling strategy, covering sharps where relevant.
  7. A short statement on parking and access, drawing on local standards rather than national averages.

An illustrative example. A 60 m² unit in a suburban parade, last used as a travel agency, becomes a three-chair salon with two nail stations. No planning application is needed for the use, because both sit in Class E and the original permission carried no restrictive condition. What is needed is permission for the rear extract duct, plus a special treatment licence because the borough is in London, plus a variation of nothing at all. The whole job turns on the duct.

If your scheme does need a full application, browse the report types by category to see what the council is likely to ask for. Enter your postcode on PlanScope to see which reports your site needs.

This is general guidance, not legal advice. Check the position with your local planning authority or a qualified professional before relying on it, and remember that a Lawful Development Certificate is the only formal way to confirm that a use is lawful. PlanScope provides AI-assisted draft reports for planning applications. Reports should be reviewed before submission. We do not guarantee planning approval.

Frequently asked questions

What use class is a beauty salon or nail bar?

Both sit within Class E of the Use Classes Order, most comfortably under limb E(c)(iii) covering services appropriate to a commercial, business or service locality. Because movement within Class E is not development, a former shop, bank branch or office can be occupied as a salon without a planning application, subject to any restrictive condition on the original permission.

Is a tattoo studio in Class E or sui generis?

The Order does not name tattoo studios and authorities read the position differently, with some treating a studio as a Class E service and others as sui generis. Get a written pre-application view, or apply for a certificate of lawfulness for a proposed use under section 192 of the Town and Country Planning Act 1990, which is the only binding answer.

Do I need a licence as well as planning permission?

For treatments that break the skin, yes. Sections 13 to 17 of the Local Government (Miscellaneous Provisions) Act 1982 cover registration for acupuncture, tattooing, ear-piercing and electrolysis, extended to cosmetic piercing and semi-permanent skin-colouring by the Local Government Act 2003. London boroughs operate a wider special treatment licensing regime.

Does a nail bar extract duct need planning permission?

Usually yes, because it is an external alteration to the building. The use change may be free within Class E while the duct is not. Show the route, the terminal height, the flow rate and the odour control in a ventilation and extraction statement, and keep the discharge point well away from residential windows above or behind the unit.

Can the council restrict my opening hours?

Yes, where permission is needed. Hours of opening and of plant operation are routinely conditioned in residential parades, with closing times around 20:00 or 21:00 being common. Ask for the hours the business genuinely needs, supported by a reasoned justification, rather than asking high and accepting a reduction.

Sources and further reading

use classesclass echange of usebeauty salonnail barextractioncommercial occupier

This article is general guidance about the planning system in England and, where stated, the rest of the UK. It is not legal or professional advice. Check your local planning authority’s validation requirements and take professional advice for your specific site.

More in Use Classes and Change of Use

View all →
Use Classes and Change of Use6 min read

Purpose-built student accommodation and the use classes

Cluster student accommodation sits outside the Use Classes Order. Self-contained studios are the arguable case, and the description of development is what fixes the answer.

Read article →
Use Classes and Change of Use6 min read

C4, large HMOs and where sui generis begins

Six residents is the ceiling for Class C4. The seventh takes the property into sui generis, where no permitted change applies and concentration policy bites.

Read article →
Use Classes and Change of Use7 min read

Class Q and the structural soundness test

Class Q permits conversion, not rebuilding. If the barn needs a new structural frame or new load-bearing walls to work as a house, the right does not apply.

Read article →
Use Classes and Change of Use7 min read

Veterinary practices: Class E or sui generis?

Consulting surgeries are usually treated as Class E. Boarding, catteries and dog day care sit outside the Use Classes Order entirely, so a practice doing both runs a mixed use with no fallback.

Read article →
Use Classes and Change of Use7 min read

Dentists, clinics and the limits of Class E(e)

Dentists and clinics sit in Class E(e), so movement from another Class E use is not development. Surgeries attached to a practitioner's home, overnight care and restrictive conditions are where that breaks down.

Read article →
Use Classes and Change of Use8 min read

Betting shops, payday lenders and amusement arcades

Betting offices, pay day loan shops and amusement arcades sit outside the use classes, so there is no permitted change into them and no fallback use to rely on.

Read article →