Use Classes and Change of Use

Betting shops, loan shops and the 2015 use class change

Updated 6 min readBy PlanScope Editorial Team

The 2015 amendment to the Use Classes Order made betting offices and pay day loan shops sui generis, and the 2020 Class E reform left them there. Here is what a change of use application has to prove.

Turning a shop into a betting office needs planning permission, and it has done since April 2015. That is the short answer, and it surprises people who remember when a betting shop could open in a former estate agency without asking anyone. The Town and Country Planning (Use Classes) (Amendment) (England) Order 2015 pulled betting offices and pay day loan shops out of the old Class A2 and made them sui generis, meaning they belong to no class at all. Five years later the 2020 reform swept most high street uses into Class E and left these two exactly where the 2015 order had put them.

What the 2015 order actually did

Before 15 April 2015, a betting office was a Class A2 use, sitting alongside banks, building societies, estate agents and employment agencies. Anything in A2 could become anything else in A2 without a planning application, because movement within a use class is not development. A branch that closed could reopen as a betting shop and the council had no say.

The 2015 order removed both betting offices and pay day loan shops from A2 and left them classless. The government's stated purpose was to give local authorities control over where these uses opened, particularly where several were clustering in the same parade. At the same time, permitted development rights were introduced in the opposite direction, so that an existing betting office or loan shop could move back into ordinary retail or professional services without an application.

That asymmetry is the whole design. Getting out is easy. Getting in requires a decision.

Where the uses sit after Class E

The Town and Country Planning (Use Classes) (Amendment) (England) Regulations 2020 revoked Classes A1, A2, A3 and B1 from 1 September 2020 and replaced them with Class E, a broad commercial, business and service class covering shops, financial and professional services, cafes and restaurants, indoor sport, medical uses, creches, offices, research and light industry. Movement within Class E is still free.

Betting offices and pay day loan shops were not swept in. Neither were hot food takeaways, pubs, drinking establishments, live music venues, cinemas, theatres, bingo halls or casinos. They all remain sui generis, and a change from Class E to any of them is a material change of use.

Use Position today Change from a Class E shop
Betting office Sui generis since 15 April 2015 Planning permission required
Pay day loan shop Sui generis since 15 April 2015 Planning permission required
Bank or estate agency Class E(c) No permission needed
Cafe or restaurant Class E(b) No permission needed
Hot food takeaway Sui generis Planning permission required

Part 3 of the General Permitted Development Order still allows a betting office to move into Class E use without an application, so a unit that has operated as a betting shop can revert to a shop, a cafe or an office. Check the current text of Part 3 before relying on it, because the classes it refers to were renumbered after 2020.

Applying for the change of use today

The application is a full application for change of use, not a householder or prior approval route. It needs a site location plan, existing and proposed floor plans, a shopfront elevation if the frontage is altered, and a Planning Statement that addresses the development plan policies on retail frontage, town centre vitality and amenity.

Establish the lawful use first. If the unit has been vacant for years, the last lawful use may not be what the letting agent says it is, and the assessment starts from what is lawful rather than what was last advertised. Where a unit has been subdivided or amalgamated, the planning unit may not match the shop front you are looking at.

Expect the application to be determined within eight weeks as a minor application, and expect neighbour notification and a site notice. These proposals attract objections, so the case should be made properly in the statement rather than left for the officer to construct.

Frontage and clustering policies

Most town centre policies work by counting. A primary shopping frontage policy might resist a non-retail use where it would take the proportion of non-retail units above a stated percentage, or where it would create three or more adjoining non-retail units. The figures vary by authority and by centre, and they are set out in the adopted local plan rather than in national policy.

Do the count yourself before applying. Walk the frontage defined on the policies map, record the lawful use of each unit rather than the trading name on the fascia, and present the result as a table. An officer who has to do that survey themselves will do it in the way that supports refusal.

Vacancy is the other half of the argument. Where a unit has been empty for a long period and has been marketed without success, that marketing evidence carries weight against a policy designed to protect active retail frontage.

Health, wellbeing and the limits of what can be weighed

National policy asks planning to support healthy and safe communities, and many authorities have adopted policies restricting gambling premises within a stated distance of schools, colleges or premises used by vulnerable groups. Where such a policy exists, it is a material consideration and the application should address it directly.

Where no such policy exists, the position is harder for the authority. General concern about gambling is not by itself a planning objection, and an inspector will look for a policy hook and evidence rather than sentiment. The honest position for an applicant is that the outcome depends heavily on which authority you are in.

Licensing runs on a separate track

A betting office also needs a premises licence under the Gambling Act 2005 from the licensing authority, and an operating licence and personal licences from the Gambling Commission. The two regimes do not speak to each other. Licensing authorities are told to aim to permit gambling in line with the licensing objectives and the authority's own statement of licensing policy, and they are not to treat planning permission as a licensing matter.

The practical consequence is a sequencing decision. A premises licence granted for a unit that has no planning permission for the use is worth very little, and planning enforcement is unaffected by the existence of a licence. Applying for planning permission first is usually the safer order.

The evidence a council expects

A submission that anticipates the objections tends to be short and specific:

  1. A frontage survey table showing lawful uses across the policy frontage, with the resulting percentage.
  2. Marketing evidence for the unit, with dates, asking terms and any offers received.
  3. Proposed opening hours, with a note on how they compare with the neighbouring units.
  4. A shopfront and signage proposal, especially in a conservation area, where window treatments and internal illumination are usually the sticking point.
  5. Servicing and waste arrangements, and details of any external plant.
  6. A statement on proximity to schools or other sensitive premises where local policy requires it.

Where the scheme also involves the floors above, the residential element brings its own requirements, and converting space above a shop follows a different route with its own standards.

Browse all 66 PlanScope report types and start a draft if you want to see which supporting documents a change of use of this kind normally needs.

This is general guidance, not legal advice; check the position with your local planning authority or a qualified professional before relying on it. PlanScope provides AI-assisted draft reports for planning applications. Reports should be reviewed before submission. We do not guarantee planning approval.

Frequently asked questions

Do I need planning permission to open a betting shop in a vacant shop unit?

Yes. Betting offices have been sui generis since the Use Classes Order was amended on 15 April 2015, so a change from a Class E shop is a material change of use needing a full planning application. Movement within Class E is free, but Class E to sui generis is not. Establish the unit's lawful use before you apply.

Can a betting office change back into a shop without permission?

Generally yes. Part 3 of the General Permitted Development Order allows a betting office or pay day loan shop to move into Class E use, so the unit can become a shop, cafe or office. The right runs one way only. Check the current text of Part 3 first, because the use classes it refers to were renumbered in 2020.

Why were betting offices taken out of Class A2?

The stated purpose of the 2015 amendment was to give local planning authorities control over where betting offices and pay day loan shops open, particularly where several were clustering in one parade. While they sat in Class A2 they could replace a bank or estate agency with no application at all, so councils had no opportunity to assess the effect on the centre.

Does a gambling premises licence replace planning permission?

No. The premises licence under the Gambling Act 2005 and planning permission are separate consents decided on different tests. Licensing authorities are directed to aim to permit gambling in line with the licensing objectives and are not to treat planning as a licensing matter. A licence gives no protection against planning enforcement.

What evidence helps a betting shop change of use application?

A frontage survey recording the lawful use of each unit in the policy frontage, marketing evidence for the vacant unit, proposed opening hours, a shopfront and signage proposal, servicing and waste arrangements, and a response to any local policy on distance from schools. Present the frontage count as a table rather than leaving the officer to compile it.

Sources and further reading

use classesbetting officesui generischange of useclass ehigh street

This article is general guidance about the planning system in England and, where stated, the rest of the UK. It is not legal or professional advice. Check your local planning authority’s validation requirements and take professional advice for your specific site.

More in Use Classes and Change of Use

View all →
Use Classes and Change of Use7 min read

Serviced offices and flexible workspace in Class E(g)

Co-working and managed workspace fall within Class E(g)(i) alongside conventional offices, so most changes need no application. Subdivision, a change of character and conditions restricting Class E flexibility are the exceptions.

Read article →
Use Classes and Change of Use7 min read

Religious use in an industrial unit: the route

A place of worship in an industrial unit always needs planning permission. The use class is rarely the obstacle: employment land protection policy, Sunday parking peaks and fire occupancy capacity decide the outcome.

Read article →
Use Classes and Change of Use7 min read

Waste transfer and scrap metal: which class applies

Article 3(6) of the Use Classes Order excludes scrapyards and certain waste installations from every class, making them sui generis. Transfer stations sit in a greyer area, and the permit regime runs alongside planning.

Read article →
Use Classes and Change of Use7 min read

Container storage yards and the use of open land

Storage on open land falls within Class B8 because the Use Classes Order applies to land as well as buildings. Stacking height, surfacing, drainage and HGV movements decide whether a yard is acceptable.

Read article →
Use Classes and Change of Use7 min read

Soft play centres: Class E(d) or Class F2?

Indoor recreation sits in Class E(d); Class F2 covers outdoor recreation and community halls. This explains how to classify a play centre, why it matters for later flexibility, and the noise and parking evidence expected.

Read article →
Use Classes and Change of Use7 min read

Shisha lounges and where they sit in the use classes order

A shisha venue is classified by what it primarily does, and the smoke-free definition of substantially enclosed premises dictates what can be built. This sets out both tests and the conditions that follow.

Read article →