Use Classes and Change of Use

Retail to residential above a shop

6 min readBy PlanScope Editorial Team

Upper floors above a shop are often part of the shop's planning unit rather than separate. That single point decides which application you make.

Converting the space above a shop into flats starts with a question most people skip. Are the upper floors already residential in planning terms, or are they part of the shop below. A flat above shop planning application is straightforward when the answer is the first and considerably less so when it is the second, because the second means a change of use from Class E to Class C3 with everything that follows.

The physical appearance tells you very little. Upper floors with a kitchen, a bathroom and a bedroom can still be part of the retail planning unit if that is how they have been used.

Identifying the planning unit

The planning unit is the area in one occupation used for a single main purpose, together with anything ancillary to it. A shop occupying the ground floor and using the first floor for stock and a staff room is one planning unit with one use, Class E.

Where the upper floors have been let separately, on their own tenancy, with their own entrance and their own council tax band, they are a separate planning unit in residential use. The two situations sit either side of a line, and title deeds do not decide which side you are on.

Evidence settles it. Council tax records, electoral roll entries, separate utility accounts, historic tenancy agreements, rating list entries for the shop showing whether the upper floors are included, and photographs of the access arrangements. Assemble that before deciding what to apply for, because getting the description of development right depends on it.

Where the upper floors are already residential

If the use is already C3 and has not been abandoned, no change of use application is needed. The work becomes a building regulations exercise, plus planning permission for any external alterations such as new windows, a dormer, a new door or a change to the shopfront.

That is the good outcome and it is worth spending money to establish. A certificate of lawfulness of existing use under section 191 of the Town and Country Planning Act 1990 converts an argument into a document, and lenders like it.

Watch for abandonment where the floors have stood empty for a very long time and have deteriorated. A long period of disuse alongside physical decay can end a residential use, and reviving it then needs permission.

Access arrangements and the shared entrance

Access is where most schemes get difficult. Flats need an independent entrance that does not pass through the commercial unit, and on a Victorian parade the original side door was frequently blocked up when the shop was modernised.

Three options usually present themselves. Reopen a historic side entrance, which is the cleanest solution where the opening survives. Take a slice of the shop frontage for a new door, which reduces the retail unit and changes the frontage. Or form an access from the rear, which works where there is a service yard and fails where the rear is a fire escape onto someone else's land.

Each has a planning consequence. A new opening in a shopfront affects the character of the street and needs care in a conservation area. On a listed building it needs listed building consent, and the case for cutting a new opening through a historic frontage is a hard one to make.

Rear access raises questions about lighting, surveillance and whether the route is available in perpetuity rather than by a neighbour's tolerance.

Noise from the commercial unit below

Introducing homes above a trading unit creates a relationship that will be tested. Plant noise from a refrigeration pack, early morning deliveries, a shutter opening at 6am, and extract from a kitchen all become the residents' problem.

Environmental health officers assess this at application stage. The usual evidence is a Noise Impact Assessment measuring the existing sound environment and testing the proposed construction against internal criteria taken from BS 8233:2014 for living rooms and bedrooms.

The mitigation is mostly construction. An acoustically separating floor between the commercial unit and the flats, resilient details at junctions, and glazing and ventilation specified together so that windows do not have to be opened to ventilate the rooms.

Where the unit below is or could become a hot food use, the odour question comes with it, and our note on where the takeaway line falls covers how the use classes work in that situation. Extract ducting to roof level has to be designed before the flats are laid out, because the duct route through the building is not something that can be added later.

Refuse, cycle storage and amenity

Requirement What councils usually expect Common problem
Refuse Secure store, short carry to the collection point No yard, no room at ground floor
Cycles Covered, secure, ground floor Competing with the bin store for the same space
Amenity space Some private or shared external space None available on a tight town centre plot
Daylight Adequate natural light to habitable rooms Deep plan floors with windows on one elevation only

Amenity space requirements are usually applied flexibly in town centres, where the trade-off is accepted in return for the reuse of upper floors. Refuse and cycle storage are not, because they have practical consequences on the street.

Daylight is the constraint that kills schemes. A first floor over a deep shop, with windows only on the front elevation, may not be capable of providing an acceptable standard of light to a bedroom at the back. Rooflights are not an option under a further storey, and a light well is expensive.

Space standards for the new units

The nationally described space standard sets minimum gross internal areas by the number of bedrooms and bedspaces, along with minimum bedroom areas and widths and a built-in storage requirement. It applies to prior approval schemes as a matter of law, and most authorities apply it through local plan policy to full applications too.

Measure carefully. Areas under a ceiling height below 1.5 metres do not count, and the storage requirement is additional to the overall minimum rather than part of it. A scheme drawn to fit the building and then checked against the standard usually needs one fewer unit than the first layout suggested.

Choosing between prior approval and a full application

Class MA in Part 3 of Schedule 2 to the GPDO 2015 permits change of use from Class E to dwellinghouses, subject to conditions and limitations and to prior approval on specified matters including transport, contamination, flooding, noise from commercial premises, the provision of adequate natural light in all habitable rooms, and in some cases the effect on a conservation area. The provisions have been amended since they were introduced, so read the current text rather than a summary written earlier.

An Article 4 direction removes the right in many town centres, and checking for one is the first step rather than the last.

A full application costs more and takes longer, and it gives the council a wider discretion. It also allows a scheme that does not fit inside the permitted development limits, permits external alterations to be dealt with in the same application, and produces a permission that is easier to explain to a funder. On a building with a new shopfront opening and a rear extension, the full application is usually the shorter route in practice.

A focused Planning Statement that establishes the planning unit first, then the access, then the residential standards, matches the order a case officer will work through. Browse all 66 report types to see the technical documents a mixed use conversion normally needs.

This is general guidance, not legal advice. Check the position with your local planning authority or a qualified professional before relying on it.

PlanScope provides AI-assisted draft reports for planning applications. Reports should be reviewed before submission. We do not guarantee planning approval.

Frequently asked questions

Are the flats above a shop already residential?

Often not in planning terms. If the upper floors have been used for stock, staff facilities or offices connected with the shop, they form part of the shop's planning unit even when they look like a flat. Evidence of separate residential occupation, separate council tax banding and a separate access supports a claim that a residential use already exists.

Can I use Class MA for upper floors only?

Class MA applies to a change of use from Class E to dwellinghouses, and it can apply to part of a building. The practical constraints are the conditions and limitations in the Order itself, together with any Article 4 direction removing the right in that area. The provisions have been amended more than once, so check the current wording rather than an earlier summary.

Does the shop below need to close?

No. A mixed use building with a trading shop at ground floor and flats above is common and entirely normal. What changes is that the residential units become sensitive receptors, so noise, odour and delivery activity from the commercial unit are assessed against their windows. That is often the point at which conditions appear on the commercial use.

What about refuse and cycle storage?

Both are standard requirements and both are hard on a tight town centre site. Councils normally want secure, covered cycle parking and a bin store within a reasonable carrying distance of the entrance, with collection from the highway. Solutions that rely on bins being wheeled through the shop are rejected, because the arrangement fails the moment the shop changes hands.

Do space standards apply to a prior approval scheme?

Yes. Dwellings created through permitted development rights must meet the nationally described space standard, and this is checked at prior approval stage. Minimum gross internal areas apply by number of bedrooms and bedspaces, along with minimum floor areas and widths for bedrooms, and built-in storage. A unit that misses the standard by a square metre is refused on that ground alone.

Sources and further reading

flat above shopclass machange of useplanning unitconversionnoise

This article is general guidance about the planning system in England and, where stated, the rest of the UK. It is not legal or professional advice. Check your local planning authority’s validation requirements and take professional advice for your specific site.

More in Use Classes and Change of Use

View all →
Use Classes and Change of Use7 min read

Co-living schemes and what use class they fall into

Large-scale purpose-built shared living fits no class in the Use Classes Order, so it is sui generis. That shapes room sizes, affordable housing contributions and the conditions on any consent.

Read article →
Use Classes and Change of Use7 min read

Trampoline parks and indoor leisure capacity

Indoor trampoline parks usually sit in Class E(d), so the planning risk moves to restrictive conditions, structure-borne impact noise and the occupancy figure the fire strategy allows.

Read article →
Use Classes and Change of Use7 min read

Crematoria and burial grounds: use class and consents

Neither a crematorium nor a burial ground falls within any use class, so both need planning permission. A crematorium also carries statutory separation distances and an emissions permit, and a burial ground needs a groundwater risk assessment.

Read article →
Use Classes and Change of Use6 min read

Sports and social clubs: Class F2 or sui generis?

A sports and social club can sit in Class F2 as a local community facility, or outside the use classes entirely if the bar becomes the main event. The distinction decides what you can change without permission.

Read article →
Use Classes and Change of Use6 min read

Film and television studios and the use class question

Film and television production is not named in the Use Classes Order, so a studio consent turns on how the primary use is described and how the planning unit is drawn. Sound stages, set workshops and production offices can each fall differently.

Read article →
Use Classes and Change of Use7 min read

Data centres: which use class applies

Classifying a data centre is a matter of fact and degree, and the answer rarely decides the scheme. Grid capacity and plant noise do.

Read article →