Commercial Occupiers

Brewery tap in a railway arch: the planning route

7 min readBy PlanScope Editorial Team

Brewing plus a tap room is a mixed use including a sui generis drinking establishment, so a full application is unavoidable. The arch itself then sets the constraints.

A tap room is a drinking establishment, and a drinking establishment is sui generis under the Use Classes Order. There is no permitted development route into it from storage, light industry or anything else, so railway arch planning permission for a brewery tap means a full application, every time. Budget for that and for the three technical questions the arch structure forces: where the extract goes, how sound gets out through the front, and where the drainage runs when the floor sits below the sewer.

The brewing side is more flexible than the drinking side. It is the bar that drives the application.

Use class analysis for an arch unit

Most arches are let for storage and distribution, which is Class B8. Brewing on any commercial scale is normally general industrial, Class B2, because of the processes and the associated plant. A small operation with no detriment to amenity can sit in the light industrial limb of Class E, but that is a judgement rather than a given.

Add a tap room and the position changes. A drinking establishment is listed as sui generis in article 3 of the Town and Country Planning (Use Classes) Order 1987 as amended, which puts it outside every class and therefore outside every permitted change. The resulting unit is a mixed use: production plus a sui generis drinking establishment.

So describe the proposal accurately on the form. An application described as "ancillary tasting area" where the floor plan shows a 60 cover bar will be re-described by the officer, and the re-description usually arrives with a request for the noise and extract evidence you had hoped to avoid.

Off sales change the analysis again, and the distinction between a tap room and a shop selling for consumption elsewhere is set out in off sales from a brewery or bottle shop.

Arches are let on leases from an estate owner, and two separate permissions are in play. The lease permitted use clause, which may not extend to a drinking establishment. And a licence for alterations, which you will need for any work to the structure.

On the planning side, ownership certificates matter. Where the applicant is not the freeholder, a certificate under article 13 of the Development Management Procedure Order 2015 is completed and notice is served on the owner. Certificate A is for a sole owner. A leaseholder applicant normally serves notice and completes Certificate B. Getting this wrong invalidates the application, and it is the single most common validation failure on arch schemes.

Serve the notice before you submit, and keep the dated copy.

Noise breakout through the arch structure

A brick barrel vault is heavy and performs well. The weak elements are everywhere else.

  • The front screen, which is usually a roller shutter or a glazed infill, and which carries most of the breakout
  • The entrance, where an open door during trading defeats whatever the screen achieves
  • The party construction between adjoining arches, often blockwork that stops short at the crown
  • The arch crown itself, where gaps around services connect one unit to the next
  • Any opening formed in the front for ventilation, which is an acoustic hole by definition

Mitigation follows that list. An acoustic lobby with two doors on a self-closing arrangement. A secondary glazed screen set behind the shutter line rather than in it. Sealing the crown and the party construction properly, which costs little during fit-out and a great deal afterwards. A noise limiter on any amplified system, set and sealed by the acoustician.

Fixings are the constraint people do not expect. Estate and infrastructure owners restrict drilling into the arch barrel, so acoustic treatments often have to be independently framed off the floor rather than hung from the structure. Ask about fixing restrictions before the acoustician designs anything.

A Noise Impact Assessment handles plant noise against the rating level method and music breakout against the relevant criteria. Councils usually expect a suitably qualified author for this work, and professional review before submission is strongly advised.

Ventilation where there is no roof access

This decides many arch applications. You cannot normally take a flue up through the barrel, because the structure is not yours to penetrate and the railway sits above it. That leaves the front elevation or a designated service route, and a kitchen extract discharging at low level beside a footway is exactly what environmental health objects to.

Three workable answers. Take a riser up the face of the arch head where the estate permits it and the appearance is acceptable. Use a designated service void where the estate has provided one. Or design the food offer so that extraction is not the problem, which for a tap room usually means cold food, or a limited hot offer with no frying or grilling.

A Ventilation and Extraction Statement describing the system, the air volume and the discharge point is what the validation list asks for. Where the cooking is more intensive, a full odour assessment follows.

Decide the food offer before the fit-out drawings. Changing from a pizza oven to a cold counter after the application is in means redrawing the whole servicing strategy.

Access, servicing and loading

Arch frontages often sit on a street with no loading bay and a narrow footway. The officer will want to know where a dray stops, how casks get from the kerb to the cellar, and what happens to the footway while that occurs.

Put it on a plan. A servicing plan showing the delivery position, the vehicle type, the frequency and the times, plus a note on waste storage and collection, answers most highway queries without a transport consultant. Cycle parking and a short note on customer dispersal cover the rest on a smaller scheme.

Dispersal is a substantive issue rather than a formality. Customers leaving an arch stand on the footway, and a management plan naming closing procedures and external drinking cut-off times is normally conditioned anyway.

Flooding and drainage in an arch

Arch floors sit low, sometimes below the invert of the nearest sewer, which means a pumped connection with a holding sump rather than a gravity discharge. Price that early, because it affects the floor build-up and therefore the headroom.

Surface water runs towards the arch mouth. A threshold detail, a channel drain across the opening and a route for that water to go are needed whether or not the site is in a mapped flood zone. Where the site does fall in Flood Zone 2 or 3, a Flood Risk Assessment is required and should address both the fluvial risk and the practical surface water route at the opening.

Grease management for any food offer comes in here too, since a pumped system with a grease trap needs access for maintenance in a unit with one door.

Conditions to expect

Condition What it typically controls
Hours of opening Trading hours, often with earlier closing on the external area
Noise limit Rating level at the nearest residential facade, with post-installation verification
Amplified music Limiter setting, and no music audible at the nearest noise sensitive facade
Extract installation Installed in accordance with approved details before the use starts, and maintained
Management plan Dispersal, external drinking, waste and deliveries
Waste storage Location and screening of bins

Licensing runs separately under the Licensing Act 2003, with its own application, its own hearing and its own hours. A premises licence does not authorise a use that planning has not permitted, and a planning permission does not authorise sales without a licence. Run both timetables together rather than sequentially.

Before you commission anything, enter the postcode to see which reports the site is likely to need.

PlanScope provides AI-assisted draft reports for planning applications. Reports should be reviewed before submission. We do not guarantee planning approval. For specialist technical reports, qualified professional input may be required.

This is general guidance, not legal advice. Check the position with your local planning authority or a qualified professional before relying on it.

Frequently asked questions

Is there a permitted development route to a tap room?

No. A drinking establishment is listed as sui generis in article 3 of the Use Classes Order, which places it outside every use class and therefore outside the permitted changes in Part 3 of the General Permitted Development Order. A full planning application is required whatever the arch is currently used for.

Can I call the bar ancillary to the brewery?

Only where it really is ancillary. A small tasting area serving visitors to a production unit can be ancillary, but a bar with substantial covers, its own hours and its own trade is a separate primary use. Officers re-describe applications that understate this, and the re-description usually brings a request for noise and extract evidence.

Why is the extract such a problem in an arch?

Because you normally cannot penetrate the barrel vault to take a flue upwards, since the structure belongs to the infrastructure owner and the railway sits above. That leaves the front elevation or a designated service void, and a kitchen discharge at low level next to a footway attracts an environmental health objection.

What ownership certificate does a leaseholder complete?

Normally Certificate B, together with service of notice on the freeholder, under article 13 of the Development Management Procedure Order 2015. Certificate A is only for a sole owner of the whole application site. Completing the wrong certificate is a common validation failure on arch applications, so serve notice before submitting and keep the dated copy.

Does a premises licence cover the planning position?

No. Licensing under the Licensing Act 2003 and planning control operate separately, with different tests, different hearings and often different hours. A premises licence does not authorise a use planning has not permitted, and a planning permission does not authorise alcohol sales. Run both applications in parallel rather than one after the other.

Sources and further reading

railway archchange of usesui generisbrewerynoisecommercial occupiers

This article is general guidance about the planning system in England and, where stated, the rest of the UK. It is not legal or professional advice. Check your local planning authority’s validation requirements and take professional advice for your specific site.

More in Commercial Occupiers

View all →
Commercial Occupiers7 min read

Adding beauty treatment rooms to a hairdressing salon

Most treatment rooms added to a salon stay within Class E. The traps are a condition tying the unit to hairdressing, licensing for particular treatments and the flats above.

Read article →
Commercial Occupiers6 min read

Vehicle repair noise when flats are approved next door

An existing repair business facing a residential application next door needs its own baseline evidence. What to measure, what to say and what to ask the council to condition.

Read article →
Commercial Occupiers6 min read

Hand car wash on a petrol forecourt: the planning position

Why a hand car wash on a petrol forecourt is a change of use in its own right, and what the council, the highway authority and the sewerage undertaker each want to see.

Read article →
Commercial Occupiers7 min read

Opening a dog day care unit on an industrial estate

Day care applications are decided on barking. Here is the use class position, the acoustic design that gets approval, and how the animal activities licence runs alongside.

Read article →
Commercial Occupiers6 min read

Planning permission for a barber or hairdresser

Moving into a former shop or office to open a barber shop usually needs no change of use permission. The applications you will need are for the shopfront and the sign.

Read article →
Commercial Occupiers7 min read

Opening a late-night bar: planning and licensing compared

A drinking establishment is sui generis and needs planning permission plus a premises licence. Here is what each regime controls, how hours conflicts arise, and which application to submit first.

Read article →