Commercial Occupiers

Planning permission for a barber or hairdresser

6 min readBy PlanScope Editorial Team

Moving into a former shop or office to open a barber shop usually needs no change of use permission. The applications you will need are for the shopfront and the sign.

A barber shop or hairdresser sits within Class E of the Use Classes Order, so taking over a former shop, office, cafe or bank unit normally needs no change of use permission at all. Barber shop planning permission becomes an issue in two situations only: the previous lawful use was outside Class E, or the works you want to do to the front of the building amount to development in their own right.

Check the existing lawful use before anything else. Not what the last tenant did, but what the building is lawfully permitted to be used as, which is a question for the planning history and sometimes for a certificate.

Whether a change of use is needed at all

Movement between uses in the same class is not development. Section 55(2)(f) of the Town and Country Planning Act 1990 takes it outside the definition, and article 3(1) of the Town and Country Planning (Use Classes) Order 1987 as amended does the rest. Since the 2020 amendments brought shops, offices, cafes, financial and professional services, gyms, nurseries and most health uses into one Class E, the pool of units you can occupy without an application is wide.

Where it stops is sui generis. The Use Classes Order lists uses that sit in no class at all, and a launderette, a hot food takeaway, a drinking establishment, a betting office and a taxi business are among them. A change from any of those to a barber shop is a change of use and needs to be authorised.

Before assuming a full application, check Part 3 of Schedule 2 to the General Permitted Development Order 2015. Several changes out of sui generis uses into Class E are permitted development subject to conditions and, in some cases, prior approval. The route is faster and costs less than an application where it is available.

Two caveats that catch people. An Article 4 direction can remove a permitted change in a defined area, and the direction is published by the authority. And a unit vacant for a long period can leave the lawful use in doubt, in which case a certificate of lawfulness under section 191 of the 1990 Act is the only way to settle it.

Where personal care falls in Class E

Hairdressing was expressly within the old Class A1 shops class. When the 2020 amendments revoked Class A1, hairdressing moved into Class E, and authorities treat it either as retail-style use under E(a) or as a service appropriate to a commercial, business or service locality under E(c)(iii).

The sub-paragraph rarely matters. What matters is that it is Class E, because the freedom to move within the class is the same whichever limb applies. Nail bars, beauty treatment rooms and barbers are generally handled the same way.

Tattoo studios and piercing are the exception worth knowing. They are commonly treated as sui generis rather than Class E, so a barber adding tattooing as a sideline may have created a mixed use needing permission.

Massage and some beauty treatments raise a separate licensing question in several areas, under local Acts or byelaws rather than under planning. Licensing and planning run on parallel tracks, and holding one says nothing about the other.

Shopfront alterations and conservation areas

This is where most barber shop applications actually arise. An alteration that materially affects the external appearance of the building is development under section 55, so replacing a shopfront, inserting a new door, changing the fascia profile or installing a roller shutter will usually need permission.

Three overlays make it stricter:

  • In a conservation area, the authority will assess whether the alteration preserves or enhances the character of the area, under section 72 of the Planning (Listed Buildings and Conservation Areas) Act 1990
  • On a listed building, listed building consent is needed for works affecting character, including internal works, and that is separate from planning permission
  • Where the authority has adopted a shopfront design guide, the officer will apply it, so read it before drawing anything

Externally mounted solid roller shutters are the most frequently refused element in historic frontages. Internal or open mesh shutters behind the glazing line usually get through where a solid external box does not.

Ventilation, washing and drainage

A barber shop has modest servicing needs. Hot water, basins, and a route for waste. A hair salon offering colouring and chemical straightening is different, because the products release vapours that environmental health officers take an interest in when there are flats above.

Where the unit sits in a mixed use building, expect a question about mechanical ventilation and where it discharges. A short Ventilation and Extraction Statement describing the system, the air volume and the discharge point answers it. Full odour assessment is for cooking, not for salons, and submitting one here is wasted money.

Trade waste is a separate obligation under the duty of care, and the authority may ask where bins will be stored if the frontage has no yard behind it.

Accessibility is worth settling at the same time. Where you are altering the entrance anyway, a level or ramped threshold is usually achievable within the existing opening, and designing it in at this stage avoids a second application later. Part M of the Building Regulations will apply to the works regardless of what the planning decision says.

Hours, Sunday trading and signage

Hours of opening can only be controlled by condition where permission is being granted. If you occupy a Class E unit with no application, there is no planning condition on hours, though a condition on an earlier permission for the building may still bite, so read the decision notices.

Sunday trading restrictions under the Sunday Trading Act 1994 apply to large shops selling goods. A service business such as a barber generally falls outside that regime, but check the lease, which often restricts hours more tightly than planning ever would.

Signage runs on its own consent system under the Town and Country Planning (Control of Advertisements) (England) Regulations 2007. Many non-illuminated fascia and projecting signs on business premises benefit from deemed consent within the limits set by Schedule 3. Illumination, excess size or projection, an area of special control, a conservation area or a listed building all tend to push a sign into needing express consent. The same calculation applies to any business frontage, and the detail is set out in forecourt display, lighting and signage.

Evidence for a straightforward application

Where you do need to apply, keep the pack tight. A shopfront application with four well drawn sheets is determined faster than one with twenty pages of narrative.

  1. Site location plan at a standard scale with the site edged red
  2. Existing and proposed elevations of the shopfront at 1:50, with a 1:5 section through the fascia and stallriser where the frontage is historic
  3. A schedule of materials and finishes, naming the paint system and the glazing
  4. A short planning statement dealing with use class, design and the conservation area duty where relevant
  5. A ventilation note where there is residential accommodation above

A Planning Statement covering the use class position in a paragraph and the design assessment in two pages is proportionate for a unit of this size. You can enter the postcode to see which supporting documents the site is likely to need before you commission anything.

PlanScope provides AI-assisted draft reports for planning applications. Reports should be reviewed before submission. We do not guarantee planning approval.

This is general guidance, not legal advice. Check the position with your local planning authority or a qualified professional before relying on it.

Frequently asked questions

Do I need planning permission to open a barber shop in a former shop?

Normally no. Both uses fall within Class E of the Use Classes Order, and movement within a class is not development under section 55(2)(f) of the Town and Country Planning Act 1990. Confirm the unit's lawful use first, since a long vacancy or an unauthorised previous occupier can leave that in doubt.

What if the unit was a hot food takeaway or launderette?

Those are sui generis uses outside any class, so a change to a barber shop is development. Check Part 3 of Schedule 2 to the General Permitted Development Order 2015 before applying, because several changes from sui generis uses into Class E are permitted subject to conditions and sometimes prior approval.

Does a new shopfront need planning permission?

Usually yes, because an alteration materially affecting the external appearance of a building is development. In a conservation area the authority applies the duty under section 72 of the Planning (Listed Buildings and Conservation Areas) Act 1990, and on a listed building separate listed building consent is required for works affecting character.

Is advertisement consent needed for a fascia sign?

Not always. Schedule 3 to the Town and Country Planning (Control of Advertisements) (England) Regulations 2007 grants deemed consent for certain signs on business premises within stated size and projection limits. Illuminated signs, oversized signs, areas of special control, conservation areas and listed buildings commonly require express consent instead.

Will the council condition my opening hours?

Only if it is granting permission. Occupying a Class E unit without an application leaves no new condition on hours, although a condition imposed on an earlier permission for the building can still apply, so read the historic decision notices. Lease terms frequently restrict hours more tightly than planning control does.

Sources and further reading

use classesclass echange of useshopfrontadvertisement consentcommercial occupiers

This article is general guidance about the planning system in England and, where stated, the rest of the UK. It is not legal or professional advice. Check your local planning authority’s validation requirements and take professional advice for your specific site.

More in Commercial Occupiers

View all →
Commercial Occupiers6 min read

Reopening a nightclub after years of closure

A sui generis nightclub use does not lapse through non-use alone, but it can be abandoned. Physical condition, length of closure, intervening use and the owner's intentions decide it, and a certificate of lawfulness settles it.

Read article →
Commercial Occupiers6 min read

Betting shops, sui generis use and the change of use case

Betting offices left Class A2 in 2015 and never joined Class E, so a full application is always needed. Frontage clustering policy, shopfront design and the gambling premises licence decide the outcome.

Read article →
Commercial Occupiers7 min read

A sandwich shop moving into hot food and extraction

Adding hot food may or may not be a change of use. The Class E boundary, the extraction design that councils accept, and the evidence a lawfulness certificate needs.

Read article →
Commercial Occupiers7 min read

A cold store added to a food unit and its plant noise

A cold store is quiet; its condensers are not. How BS 4142 character corrections work against a low night background, and the mitigation that actually helps.

Read article →
Commercial Occupiers6 min read

An MOT bay added to an existing repair garage

An MOT bay in an existing garage keeps the same use class. The planning questions are the building works, the waiting vehicles and the noise of the test equipment.

Read article →
Commercial Occupiers6 min read

A tool hire depot on a residential fringe

Hire depots are refused on the 6:30am collection, the wash bay and the low loader turn. What to measure, what to screen and which conditions to offer first.

Read article →