Costs, Fees and Budgeting

Budgeting a hazardous substances consent application

7 min readBy PlanScope Editorial Team

The fee for hazardous substances consent is a flat prescribed sum. The real cost is the substance inventory and containment schedule behind it, plus the consultation distances the consent creates.

A hazardous substances consent application is cheaper than most applicants expect on the fee side and dearer than they expect on the evidence side. The fee is a flat sum set by regulations, not scaled to tonnage or site area. The hazardous substances consent cost that decides your budget is the technical work behind the form: a substance inventory, a plan showing where each quantity will sit, and enough process detail for the regulator to judge what a release would do to the people around you.

Consent is a separate permission from planning permission. You can hold one without the other, and a new storage installation usually needs both.

Consent is required under the Planning (Hazardous Substances) Act 1990 where a hazardous substance is, or is to be, present on, over or under land at or above its controlled quantity. The substance list and the controlled quantities sit in Schedule 1 to the Planning (Hazardous Substances) Regulations 2015. Stay below the controlled quantity for every listed substance and no consent is needed, however unpleasant the material is to handle.

The duty attaches to presence rather than to use. A distributor keeping drums in a yard is in the same position as a manufacturer feeding the same substance into a process. Pipelines and tanks above and below ground count.

Consent attaches to the land, and the Act treats a change in the person in control of part of the site as a trigger for revocation unless an application to continue the consent is made. That matters on sale, on a lease of part of a yard, and on a group reorganisation that moves the operating company. The continuation application is a small piece of work and an expensive one to forget.

Controlled quantities and how they are counted

The thresholds in Schedule 1 are quantity-based and substance-specific, and they are aligned with the lower-tier qualifying quantities used in the major accident hazard regime. Two traps catch people.

The first is aggregation. Quantities of substances in the same hazard category are added together under the rules in the Schedule, so three separate tanks, each comfortably below the individual figure, can still take the site over a category threshold.

The second is the maximum rather than the average. The relevant quantity is the amount that may be present, which is normally the design capacity of the vessel or the maximum stock the operation is set up to hold, not the stock sitting there on the day you measure. Build the consent around the worst case you will ever run, because a consent pitched at today's throughput becomes an obstacle the first time a supplier changes delivery sizes.

What the application has to contain

The regulations prescribe the form and content, and the substance of it is a technical schedule rather than a planning narrative. Expect to supply:

  1. The name and the Schedule 1 category of each hazardous substance, with the maximum quantity sought for each.
  2. A site plan at an identified scale showing the boundary, and a separate plan or plans showing the location of each vessel, store or pipeline with the quantity held at each point.
  3. A description of how each substance is kept and used, including vessel type, capacity, pressure, temperature and bunding.
  4. The ownership certificates and the notice to anyone else with an interest in the land.

The expensive part of that list is the third item. A process safety engineer or a competent process chemist normally writes it, because the regulator reads it as a description of containment and failure modes rather than as a specification. If you brief that person from an existing plant description you already hold, the cost falls sharply. If they have to work it up from drawings, it does not.

The regulator's role and the consultation zones

The hazardous substances authority is normally the district or unitary council, with exceptions named in the Act, and the Health and Safety Executive is consulted on the application. The HSE assesses the consequences of a release and advises the authority. It also maintains the consultation distances around consented sites that then shape what the authority can approve nearby.

Those zones are the real commercial consequence of a consent. Once a site holds consent, the HSE advises on development proposed within the consultation distance, and the advice is graded by the sensitivity of the proposed use and its distance from the source. A housing scheme on the adjoining field becomes harder, and the owner of that field will notice. If you are the one buying land near an existing consented site, check the position before you exchange, not after.

The Environment Agency is consulted where there are water or pollution implications. None of this replaces an environmental permit, a COMAH safety report or the duties under the fire safety legislation, all of which run on their own timetables and budgets.

Conditions and what they cost you later

Conditions on a hazardous substances consent are tighter and more literal than planning conditions. They typically fix the maximum quantity of each substance, the location at which it may be kept, and the type and specification of the containment. Some fix the form in which a substance may be held, for example a solution of a stated concentration rather than the concentrate.

The practical effect is that an operational change which would be invisible in planning terms can breach the consent. Moving a tank twenty metres to free up yard space, swapping to a larger IBC, or taking delivery in a stronger concentration all touch conditions that name a figure. Each of those needs a fresh application or a variation, with its own fee and its own eight-week clock.

Build headroom into the original application. It costs nothing extra in fee terms to apply for the quantity you will realistically need in five years, provided the HSE can still advise acceptably on the consequence distances.

Fees, timescales and the shape of the budget

The application fee is prescribed and flat, so check the current figure in the regulations before you budget rather than carrying over a number from an earlier project. The standard determination period is eight weeks from a valid application, which can be extended by agreement, and publicity and consultation run inside it.

A realistic budget for a single-site consent on an existing industrial unit has four lines, and only one of them is the fee.

Budget line What drives it
Application fee Prescribed flat sum, indexed from time to time
Substance and containment schedule Number of substances and vessels, and whether plant data already exists
Plans Whether a measured site survey is already available
Planning and agent time Any parallel planning application, plus the notices and certificates

Where a new building, tank farm or extraction plant is also proposed, the planning application runs alongside and brings its own evidence. That is where a Planning Statement and, for a site near sensitive receptors, air quality and noise work come in. Our note on what a planning agent's fixed fee includes sets out where the boundaries of an agent's scope normally sit, which is worth agreeing in writing when two consent regimes run in parallel.

One more budgeting point. If part of the site has operated above a controlled quantity without consent, deal with that first and take advice on it, because the enforcement route is not the same as the planning one. The lawfulness question for planning purposes is handled through a certificate, and our guide to budgeting a lawful development certificate application explains that cost separately.

Before you commit, read the Schedule 1 entries for your substances and write down the maximum quantity for each. That single sheet tells you whether you have a consent application at all, and it is the thing your engineer will ask for first. If you also need the planning documents that sit alongside it, browse the 66 PlanScope report types and start with the Planning Statement.

This is general guidance, not legal advice. Check the position with your local planning authority or a qualified professional before relying on it. PlanScope provides AI-assisted draft reports for planning applications. Reports should be reviewed before submission. We do not guarantee planning approval. For specialist technical reports, qualified professional input may be required.

Frequently asked questions

Do I need planning permission as well as hazardous substances consent?

Usually yes, and they are separate permissions. Consent deals only with the presence of a listed substance at or above its controlled quantity. Any new building, tank farm, bund or extraction plant needs planning permission in its own right, and the two applications are normally made in parallel so the authority sees the whole proposal at once.

What is a controlled quantity?

It is the quantity of a named hazardous substance, set out in Schedule 1 to the Planning (Hazardous Substances) Regulations 2015, at or above which consent is required. Quantities in the same hazard category are aggregated, and the figure that counts is the maximum that may be present rather than current stock levels.

How long does a hazardous substances consent application take?

The standard determination period is eight weeks from a valid application, with extensions by agreement. Publicity and consultation with the Health and Safety Executive run inside that period. Allow longer in practice if the substance schedule needs revision after the regulator has looked at the containment arrangements.

Does consent transfer when I sell the site?

Not automatically. The Planning (Hazardous Substances) Act 1990 treats a change in the person in control of part of the land as a trigger for revocation unless an application to continue the consent is made. Deal with it as part of the sale or lease paperwork rather than discovering it afterwards.

Can consent be refused because of nearby housing?

Yes. The Health and Safety Executive advises on the consequences of a release, and proximity of residential, school, hospital or retail uses is central to that advice. A consent granted on an isolated site may be refused on the same terms where sensitive uses sit within the consequence distances.

Sources and further reading

hazardous substances consentplanning feescommercial planningindustrial sitesregulations

This article is general guidance about the planning system in England and, where stated, the rest of the UK. It is not legal or professional advice. Check your local planning authority’s validation requirements and take professional advice for your specific site.

More in Costs, Fees and Budgeting

View all →
Costs, Fees and Budgeting7 min read

What the national planning application fee bands cover

Fees are prescribed nationally, indexed annually and not negotiable. Which band applies depends on dwellings, floorspace or site area, and several concessions are routinely missed.

Read article →
Costs, Fees and Budgeting7 min read

What a planning agent charges for an appeal, by stage

An appeal fee hides four pieces of work, and the prospects review is worth more than the other three. Here is the stage structure, and the breakdown to ask every agent for.

Read article →
Costs, Fees and Budgeting7 min read

CIL surcharges, interest and late payment

Start work without a commencement notice and the surcharge is 20 per cent or £2,500. Here is the full schedule, how interest runs and how to appeal.

Read article →
Costs, Fees and Budgeting7 min read

Expert witness costs and proofs of evidence

Sitting days are the smallest part of an expert witness bill. Here is how proofs, appendices, rebuttals and common ground drive the cost, and where to cut it.

Read article →
Costs, Fees and Budgeting8 min read

When planning counsel is worth the fee at an inquiry

Counsel earns the fee when an inquiry turns on policy interpretation, lawfulness or cross-examination. Here is how to tell, and what to agree about fees first.