Build over agreements where a public sewer crosses a site

8 min readBy PlanScope Editorial Team

A public sewer under the garden needs the undertaker's build over or build near agreement, which is separate from planning permission and from building control. Here is how to check the line and what to do about it.

If a public sewer runs under your garden, you need a build over public sewer agreement from the water company before you build on or close to it, and that consent is nothing to do with your planning permission. They are three separate permissions: planning from the council, building control approval under the Building Regulations, and the water company's own agreement as owner of the pipe. People discover the third one at the worst possible moment, which is when the groundworker's digger finds a brick-built sewer under the line of the new foundations.

The cost of finding out late is measured in weeks and in rebuilt foundations. The cost of finding out early is a sewer map search, and most undertakers provide one for a modest fee or free of charge.

Finding out whether a sewer is public and where it runs

Start with the sewerage undertaker's statutory sewer map. Every undertaker in England and Wales must keep a map of the public sewers, drains and disposal mains in its area under the Water Industry Act 1991, and it must be available for public inspection free of charge. In practice you order a drainage and water search or an asset location search online and get a plan back.

Two things to understand about what comes back.

First, the mapped position is indicative. Plans show the approximate line, often drawn from historic records, and the pipe can sit a metre or more from where the plan puts it. Where the sewer determines whether your extension fits, a CCTV survey or a trial hole to confirm the actual line and depth is money well spent.

Second, the map may not show everything. Private sewers and lateral drains serving more than one property transferred to the undertakers on 1 October 2011 under regulations made at the time, and a great many of those transferred assets have never been surveyed or added to the map. A shared foul drain running from your neighbour's house across your garden is very likely a public sewer now, even though no plan shows it. If a drain serves any property other than yours, treat it as public until the undertaker tells you otherwise.

Lift the manhole covers in your garden. A chamber with flows arriving from more than one direction is the clearest sign you are looking at a shared, and therefore probably public, drain.

When a build over or build near agreement is required

The trigger is proximity, not just position. Approved Document H to the Building Regulations requires the sewerage undertaker to be consulted where building work is to be carried out over or within 3 metres of a public sewer or disposal main shown on the statutory map, and the undertakers apply the same 3 metre test in their own procedures.

So you need an agreement if the new structure sits directly over the pipe, and you also need one if it sits anywhere within 3 metres of it. A single-storey rear extension that stops 2 metres short of the sewer is still caught.

Most undertakers operate two routes. Straightforward cases, typically a small domestic extension over a shallow sewer of modest diameter with no manhole involved, can go through a self-certification process handled by your building control body against the undertaker's published standard details. Anything else, and above all anything involving a manhole, a deep sewer, a large diameter pipe or piled foundations, needs a full build over application with structural details, foundation design and a method statement.

Expect the undertaker to refuse outright where the proposal would enclose a manhole inside a building. Access for maintenance is the whole point of the chamber, and the answer is relocation or diversion rather than negotiation.

Easement widths and the no build zone

The protection zone either side of a sewer is set by the undertaker and scales with the pipe. The common pattern is 3 metres either side of the centreline for smaller sewers, with wider zones, often 6 metres or more, for larger diameters and for deep or strategic assets. Check the figure your own undertaker publishes rather than assuming the 3 metre default.

Inside that zone the undertaker controls what can be built, how foundations are formed and what loading can be imposed on the pipe. Typical requirements include a foundation designed to span or bridge the sewer so that no load transfers to it, a minimum clearance between the underside of the foundation and the crown of the pipe, lintels or a reinforced raft where the pipe is shallow, and a prohibition on piling within a stated distance without a specific piling risk assessment.

Where there is a registered easement in the deeds the position is stricter still, because the easement is a property right. A deed easement with a no-build covenant can prevent development that the undertaker would otherwise have been willing to permit, and no planning permission overrides it.

Diversion as an alternative and its cost

Where building over is impossible, moving the sewer is the alternative. Section 185 of the Water Industry Act 1991 lets an owner or occupier of premises require the undertaker to move a relevant pipe, and the undertaker must comply where it is reasonably practicable to do so and the requirement does not compromise the sewerage system.

The applicant pays. A domestic diversion of a short length of shallow foul sewer is usually the cheapest option on the undertaker's menu. Deeper sewers, combined sewers, pipes crossing a highway and anything requiring a new manhole become expensive quickly, and the design and legal process commonly runs to several months.

Budget the time, not just the money. The diversion has to be designed, agreed, programmed and built, and the undertaker's own works programme governs when that happens. Starting the section 185 conversation after planning permission is granted is a reliable way to lose a construction season.

How the requirement interacts with planning permission

The council will not refuse your application because you have not got a build over agreement. It is not a planning matter, and the officer has no power over the water company's asset.

What the council can do is condition drainage. Where foul or surface water disposal is uncertain, expect a condition requiring details of the drainage scheme to be submitted and approved before construction, and that condition can only be discharged once the sewer position is resolved. On larger schemes the position belongs in a Drainage Strategy, and where foul capacity rather than pipe position is the issue, in a Foul Sewage Assessment.

The sewer also shapes the application itself. If the pipe forces the extension 3 metres away from the boundary, that is the scheme you apply for, and there is no point in submitting a layout you already know the undertaker will reject. Show the sewer line on the submitted block plan. An officer who can see that the drainage constraint has been designed around is far less likely to attach an open-ended pre-commencement condition.

Other below-ground consents follow the same pattern of sitting alongside planning rather than inside it, as set out in construction dewatering: the consents you actually need.

Timing: before design, not during excavation

The order of operations that works is short.

  1. Order the sewer map and a drainage and water search before the architect starts drawing.
  2. Lift every manhole on the plot and photograph what is inside, noting flow directions.
  3. Where the mapped line matters to the footprint, confirm it physically with a trial hole or a CCTV survey.
  4. Decide between building over, building near with a designed foundation, or diversion, and get the undertaker's view in principle in writing.
  5. Only then fix the design and submit the planning application.
  6. Submit the build over application or the section 185 diversion request in parallel with planning, not after it.

Running steps five and six together is the single change that saves the most time, because the two processes have no dependency on each other.

Evidence to submit with a householder application

Keep it proportionate. For a householder extension the council wants to see a block plan with the sewer line and manholes marked, a note confirming that an asset location search has been obtained and that the undertaker has been or will be approached, and a drainage layout showing where foul and surface water will go.

Adding the undertaker's in-principle response, where you have it, is worth the effort. It answers the drainage question before the officer asks it and often avoids a pre-commencement condition entirely. Your Planning Statement can deal with the point in two paragraphs.

What you should not do is leave the sewer off the drawings and hope. Councils share constraint data with the undertakers, and an officer who spots an unmarked public sewer under the proposed footprint will ask about it.

This is general guidance, not legal advice. Check the position with your local planning authority, your sewerage undertaker or a qualified professional before relying on it.

PlanScope provides AI-assisted draft reports for planning applications. Reports should be reviewed before submission. We do not guarantee planning approval. Enter your postcode on PlanScope to see which documents your project is likely to need.

Frequently asked questions

How close to a public sewer can I build without an agreement?

Approved Document H requires the sewerage undertaker to be consulted for work over or within 3 metres of a public sewer or disposal main shown on the statutory map, and the undertakers apply the same 3 metre test. An extension stopping two metres short of the pipe still needs an agreement.

Is the drain in my garden a public sewer?

If it serves any property other than yours, probably yes. Private sewers and lateral drains serving more than one property transferred to the sewerage undertakers on 1 October 2011, and many transferred assets never reached the statutory map. Lift the manholes and look for flows arriving from more than one direction.

Can the council refuse planning permission over a sewer?

Not for the absence of a build over agreement, which is not a planning matter. The council can impose a condition requiring a drainage scheme to be approved before construction, and that condition cannot be discharged until the sewer position is resolved. Showing the sewer on the block plan reduces the risk of an open-ended condition.

Can a public sewer be moved?

Yes. Section 185 of the Water Industry Act 1991 allows an owner or occupier to require the undertaker to move a relevant pipe where that is reasonably practicable and does not compromise the sewerage system. The applicant pays, and the design, agreement and construction commonly take several months.

Can I build over a manhole?

Undertakers almost always refuse to allow a manhole to be enclosed within a building, because the chamber exists for maintenance access. The usual outcomes are relocating the chamber, diverting the sewer, or redesigning the footprint to keep the manhole outside and accessible.

What does a build over application need?

Simple domestic cases over shallow small-diameter sewers can often be self-certified through building control against the undertaker's standard details. Otherwise expect to provide foundation design showing no load transfer to the pipe, clearances to the pipe crown, a method statement and a piling risk assessment where piles are proposed.

Sources and further reading

public sewerbuild over agreementdrainagewater industry acthouseholderfoul drainage

This article is general guidance about the planning system in England and, where stated, the rest of the UK. It is not legal or professional advice. Check your local planning authority’s validation requirements and take professional advice for your specific site.

More in Flood, Drainage and SuDS

View all →
Flood, Drainage and SuDS7 min read

Safe access depth and velocity thresholds in flood design

Safe access and dry access are different tests. The first is a hazard rating derived from depth, velocity and a debris factor; the second means the route never floods at all.

Read article →
Flood, Drainage and SuDS7 min read

Matching the climate change allowance to lifetime

Residential development is assessed over at least 100 years, which fixes the epoch. How to choose the allowance category, separate river flow from rainfall and record the lookup.

Read article →
Flood, Drainage and SuDS7 min read

Section 104 sewer adoption and planning conditions

Sewer adoption under section 104 of the Water Industry Act 1991 follows the undertaker's standards, not the planning condition. How to reconcile the two before discharge.

Read article →
Flood, Drainage and SuDS8 min read

Swale and filter strip design on a rural self-build plot

A swale conveys, attenuates and treats at once, and on a rural plot it usually beats a pipe and a tank. The constraint is width. Here are the dimensions, the check dams, the consents and the maintenance.

Read article →
Flood, Drainage and SuDS7 min read

Permeable paving in a SuDS train, and its maintenance

Permeable paving attenuates water in the open-graded sub-base beneath it. Here are the three configurations, how storage volume is calculated, why systems clog, and what a lead local flood authority expects to see named.

Read article →