Building over or near a public sewer: the agreement

6 min readBy PlanScope Editorial Team

Building over or within three metres of a public sewer needs the undertaker's agreement, separately from planning permission and building control. Here is the process and the timings.

If you want to build over or within three metres of a public sewer, you need a build over agreement from the water and sewerage undertaker for your area, and that is a separate consent from both planning permission and building control approval. It is a private agreement with the undertaker, made under its statutory powers, and it is the one most extension projects discover late. Nothing in a planning permission authorises building over a sewer, and a building control body will not sign the work off without the agreement in place.

The starting point is finding out whether there is a public sewer under your garden at all, and there is a good chance there is one you never knew about.

How private drains became public sewers

On 1 October 2011 most private sewers and lateral drains in England and Wales that connected to the public network transferred into the ownership of the sewerage undertakers. Hundreds of thousands of shared drains beneath gardens, driveways and side passages became public sewers overnight.

The practical consequence is that the pipe running from your neighbour's house across the back of your garden to the street is very likely a public sewer now, even though no map showed it before 2011 and no easement appears on your title. Undertakers have been updating their records ever since, and the records are still incomplete in places.

So a clear sewer map is reassuring rather than conclusive. If a drain serves more than one property and it reaches the public network, treat it as public until the undertaker says otherwise.

Finding the sewer on the undertaker's record

Request a sewer map, sometimes called an asset location search or a public sewer plan, from the undertaker for your area. Most publish an online request form and return a plan showing sewers, manholes, pipe sizes and invert levels where they hold them.

Read three things off it. The alignment of the pipe relative to your proposed footprint. The invert level, which is the level of the inside bottom of the pipe and the number your foundation design has to respond to. And the position of manholes, because building over a manhole is refused almost without exception.

Where the plan shows nothing but you suspect a shared drain, lift the covers and trace the run. A drainage survey with a camera costs a fraction of a redesign, and the report becomes part of your application to the undertaker.

What a build over agreement permits

The agreement is the undertaker's consent to construct over or close to its apparatus, on conditions that protect the pipe and preserve access to it for repair. It is granted under the undertaker's powers in the Water Industry Act 1991 and it runs with the property, so it will appear in the pack when you sell.

Building Regulations requirement H4 covers building over or near existing drains and sewers, and the supporting guidance in Approved Document H is what most building control bodies apply. The undertaker's own conditions are usually stricter, and where the two differ, you satisfy both.

The application asks for the site plan, the proposed foundation design, the drainage layout, and a statement of the distance from the sewer to the nearest part of the new structure. Expect the undertaker to want structural detail rather than an outline.

Standard conditions on foundations and access

The conditions vary between undertakers and the themes are consistent.

  • Foundations taken down to a level below the invert of the sewer, commonly assessed on a 45-degree line from the pipe, so that the new load is not transferred onto it
  • A reinforced concrete lintel or bridging slab where the structure crosses the pipe, spanning clear of it onto undisturbed ground either side
  • A minimum clear distance, often expressed as a horizontal offset from the outside of the pipe, with no part of the structure bearing on the pipe surround
  • No building over a manhole, and no covering of an inspection chamber
  • Retained access for maintenance, with a stated route and sometimes a requirement to reinstate at your cost if the undertaker has to excavate
  • Use of flexible joints near the structure, and protection of the pipe during construction

Where the pipe is shallow, brick-jointed or already deformed, the undertaker may require replacement of a length in your ownership as a condition of agreement. That is a common and legitimate ask, and it is worth pricing before you commit to the layout.

Diversion under section 185 of the Water Industry Act 1991

Where building over is impractical, the alternative is to move the pipe. Section 185 of the Water Industry Act 1991 gives an owner or occupier the right to require the undertaker to alter or remove a relevant pipe, subject to the undertaker being satisfied that the work is reasonably practicable and that the alternative alignment is acceptable.

The cost falls on the person requesting the diversion, and it includes design, supervision, the works themselves and often a contribution to future maintenance. The undertaker will normally quote after a feasibility stage, and you pay for the feasibility work too.

Diversion is the right answer more often than people expect, particularly where the sewer crosses the middle of a proposed extension or where a manhole sits inside the footprint. Building over a sewer you cannot reach is a problem you hand to the next owner.

Timescales and how they affect a build programme

Treat the undertaker's process as a parallel programme, not a post-planning tidy-up. An asset location search comes back quickly. A build over agreement takes longer, because it is a technical assessment of your foundation design, and a diversion under section 185 takes considerably longer again because it involves design, land access and a works programme.

Start the sewer search at the same time as the measured survey, before the drawings are fixed. The two decisions that depend on it, foundation depth and footprint position, are the two that are most expensive to change later.

If surface water drainage is also being altered, the same programme logic applies to the lead local flood authority, and our note on what the lead local flood authority checks in a drainage strategy sets out what it wants to see.

Where building control and planning each fit

Planning permission deals with land use, scale, appearance and amenity. A case officer will not check the sewer position and a planning permission grants nothing in relation to the undertaker's apparatus. On a householder extension the drawings may show the pipe purely for information.

Building control checks compliance with requirement H4 and will want evidence that the undertaker has agreed. On a larger scheme the council will usually ask for a foul drainage position in the application itself, and a Foul Sewage Assessment or a Drainage Strategy is the normal place for it.

The sequence that works is: sewer search, then design, then planning application and build over application in parallel, then building control. Doing it the other way round is how a foundation gets dug twice. Long-term responsibility is a separate question again, covered in our note on who holds SuDS adoption and maintenance.

This is general guidance, not legal advice. Check the position with your local planning authority or a qualified professional before relying on it.

If drainage is shaping your extension, enter your postcode on PlanScope to see which reports the site is likely to need. PlanScope provides AI-assisted draft reports for planning applications. Reports should be reviewed before submission. We do not guarantee planning approval.

Frequently asked questions

Do I need a build over agreement as well as planning permission?

Yes, they are separate. Planning permission deals with land use, scale and amenity, and grants nothing in relation to the undertaker's apparatus. A build over agreement is the sewerage undertaker's consent to construct over or near its pipe on conditions that protect it. A building control body will normally want evidence of the agreement before signing off the work.

How do I find out if there is a public sewer in my garden?

Request a sewer map or asset location search from the water and sewerage undertaker for your area. Most private sewers that served more than one property transferred into public ownership on 1 October 2011, so a shared drain crossing your garden is very likely public even if nothing appears on your title deeds.

What conditions does an undertaker usually impose?

Foundations taken below the invert of the pipe, commonly assessed on a 45-degree line, a reinforced lintel or bridging slab spanning clear of the pipe onto undisturbed ground, a minimum horizontal offset, no building over a manhole, retained maintenance access, and protection of the pipe during construction. Some undertakers require a defective length to be replaced first.

Can I have the sewer moved instead?

Yes. Section 185 of the Water Industry Act 1991 gives an owner or occupier the right to require the undertaker to alter or remove a relevant pipe where that is reasonably practicable and an acceptable alternative alignment exists. You pay the cost, including feasibility, design, supervision and the works. Diversion is often the right answer where a manhole sits inside the footprint.

When should I start the sewer process?

At the same time as the measured survey, before the drawings are fixed. The two design decisions that depend on the sewer position, foundation depth and footprint location, are the most expensive to change later. Build over agreements take a technical assessment, and a section 185 diversion takes considerably longer because it involves design and a works programme.

Sources and further reading

drainagepublic sewerbuild over agreementhouseholderfoul drainage

This article is general guidance about the planning system in England and, where stated, the rest of the UK. It is not legal or professional advice. Check your local planning authority’s validation requirements and take professional advice for your specific site.

More in Flood, Drainage and SuDS

View all →
Flood, Drainage and SuDS6 min read

Water supply capacity: what a developer must evidence

Four documents carry the water supply case, none of which the applicant can write. Why the enquiry belongs alongside transport and drainage scoping, not at drafting stage.

Read article →
Flood, Drainage and SuDS6 min read

Rainwater harvesting and the drainage credit

Attenuation needs empty volume and a supply tank is designed to be full. How a credit can be earned through a two-zone tank, and why harvesting belongs in the water efficiency case.

Read article →
Flood, Drainage and SuDS7 min read

Who maintains the SuDS after the houses are sold

Adoption, highway transfer or a management company: the route has to be fixed at concept drainage stage, because each one constrains where components can sit.

Read article →
Flood, Drainage and SuDS7 min read

Surface water sewer capacity and the undertaker's position

The right to connect under section 106 of the Water Industry Act 1991 survives, subject to limited refusal grounds. Why the capacity enquiry has to come before the layout is fixed.

Read article →
Flood, Drainage and SuDS7 min read

Floodplain compensation: level for level volume calculations

Compensatory storage has to be replaced within the same elevation band it was lost from, not just in the same total volume. The calculation method, the siting rules and the drawings that get it approved.

Read article →
Flood, Drainage and SuDS6 min read

Property flood resilience works and planning permission

Internal resilience works fall outside the definition of development, and demountable barriers are not building operations. Listed buildings, conservation areas and raised external levels are the exceptions.

Read article →