Costs, Fees and Budgeting

Building Regulations fees against planning fees

7 min readBy PlanScope Editorial Team

Planning permission and Building Regulations approval are separate approvals with separate fees. What each buys, where the regimes conflict, and the certificate a buyer will ask for.

Planning permission and Building Regulations approval are two separate approvals, from two separate teams, under two separate fee regimes, and holding one does nothing for the other. The planning fee is set nationally in regulations and is the same in every English authority for the same kind of application. The building control charge is set locally by each authority on a cost recovery basis, or by a private provider competing for the work, so it varies from place to place for identical jobs.

Householders discover the distinction at the worst moment, which is usually when a buyer's solicitor asks for a completion certificate that was never issued.

Two separate approvals

Planning permission decides whether the development is acceptable in land use terms: its scale, its appearance, its effect on neighbours and its fit with the development plan. Building Regulations approval decides whether the construction meets technical standards for structure, fire safety, insulation, ventilation, drainage, access and the rest.

You can need both, either, or neither. A single storey rear extension within the permitted development limits needs no planning permission and full Building Regulations approval. A change of use with no building work can need planning permission and very little from building control. A detached garden room under the size and height thresholds may need neither, though the exemptions are narrower than people assume once the building is used as a habitable room.

The teams sit in the same council and do not share files. An approval from one is never evidence of the other.

What each fee buys

The planning fee buys the determination of your application: validation, consultation, the officer's assessment and a decision notice. It does not buy advice, revisions after refusal or a second attempt, though a free go at resubmission is available within twelve months in defined circumstances. Fees are set in the national fee regulations, were increased in December 2023 and are subject to annual indexation, so use the fee calculator on the Planning Portal rather than any figure quoted in an older article. A useful detail householders miss: where an application is needed only because an Article 4 direction has removed permitted development rights, no fee is payable.

The building control charge buys the plan check and the site inspections, and it is normally invoiced in two parts. A plan charge when the application goes in, then an inspection charge covering all the visits for the project, often raised after the first inspection. Authorities publish standard charges for common domestic work such as extensions by floor area, loft conversions and re-roofing, and determine charges individually for anything outside those tables.

Two practical points on the charge. It normally carries VAT, whereas the statutory planning fee does not, so compare quotes on the same basis and check whether a published table shows figures inclusive or exclusive. And the charge covers the inspections reasonably needed for the work described, so a job that runs long or changes substantially can attract additional charges.

Full plans against a building notice

Full plans Building notice
What you submit Detailed drawings, specifications and calculations A short notice with limited detail
When work can start After the plans are checked, or 5 weeks from deposit 2 days after the notice is given
What you get A decision on the plans, and a completion certificate on satisfactory completion Inspections only, and a completion certificate on satisfactory completion
Certainty Problems found on paper before building Problems found on site, after building
Suitable for Most extensions, loft conversions, structural work, anything a lender or buyer will scrutinise Very simple work by an experienced builder

The building notice route is not available for all work, including buildings subject to the fire safety order and higher-risk buildings, so it rarely helps beyond straightforward domestic jobs.

Use full plans for anything with a beam in it. The cost of correcting a steel that fails a check on site, after the floor above is built, dwarfs the difference in charge between the routes. There is a third route as well: a regularisation application, for work already carried out without approval, which costs more and requires opening up work for inspection.

Private building control providers

Since the Building Safety Act 2022 reforms, private sector building control work is carried out by registered building control approvers, and individual inspectors must themselves be registered with the Building Safety Regulator. The old approved inspector label has gone.

A private provider gives you a single point of contact, often faster responses and a service tuned to a developer's programme. The local authority team gives you a statutory route that cannot decline the work and a completion certificate issued by the council, which some conveyancers prefer. Fees are negotiable with private providers on larger projects and fixed by published schedule with the authority.

Whichever you use, the initial notice, the inspection record and the final certificate all need to reach the local authority's records. Gaps in that chain are what show up years later on a search.

Where the two regimes disagree

The regimes have different objectives, and on heritage buildings they pull in opposite directions often enough to plan for it.

A planning condition requiring slim timber sash windows to match the originals sits awkwardly against the energy requirements in Part L. An escape window required under Part B may be larger than the conservation officer wants on a visible elevation. A required floor to ceiling height for a loft conversion can conflict with a roof height limit imposed by planning. Ventilation under Part F and the drainage requirements in Part H can force a soil vent pipe onto an elevation where a planning condition controls appearance.

Resolve these before you submit either application. A pre-application conversation with both the planning officer and building control, referencing the specific regulation and the specific policy, is time well spent on any listed building or conservation area project. Where a planning condition and a regulation cannot both be met, it is the planning condition that has to be varied, which is a separate application with its own fee.

Completion certificates and why they matter

A Building Regulations completion certificate is the document that proves the work was inspected and found satisfactory. It is what a purchaser's solicitor asks for, what a lender wants to see, and what an insurer may ask about after a claim.

Work carried out without approval can be regularised, but regularisation is more expensive, requires opening up completed work, and cannot be granted for everything. Indemnity insurance is sometimes offered as a workaround on a sale, and it is exactly that: insurance against the council taking action, not evidence that the work is sound.

Enforcement time limits differ between the regimes, and the contrast is worth knowing. Under the Building Act 1984, a local authority's power to prosecute a contravention and its power to serve a notice requiring work to be altered or removed are both time limited by reference to completion of the work. Planning enforcement limits are longer and were changed by the Levelling-up and Regeneration Act 2023. So an unauthorised extension can become immune from planning enforcement while still lacking the certificate that makes it saleable.

Budgeting both from the start

Put both regimes in the budget at the outset, along with the professional costs that sit between them.

  1. The planning fee, from the current calculator, plus any fee for discharging conditions.
  2. Drawings and supporting documents for the planning application.
  3. The building control charge, plan and inspection parts, checked for VAT.
  4. Structural engineer's calculations, which the plan check will require.
  5. A party wall surveyor where the Party Wall etc. Act 1996 applies.
  6. Contingency for a condition discharge or a minor material amendment.

The planning side of that list is set out in more detail in the piece on what a householder planning application really costs, and where a consultant's quote for supporting documents looks high, the article on what drives the price of a Planning Statement explains what sits behind the number.

The single biggest saving available to most householders is avoiding a refusal, because a refused application means the fee again, the drawings again and the eight week clock again. Sound supporting documents are cheaper than a second submission.

This is general guidance, not legal advice. Check the position with your local planning authority or a qualified professional before relying on it, and confirm all figures against the current published schedules.

See PlanScope pricing if you want to budget the supporting documents alongside the two sets of statutory fees.

PlanScope provides AI-assisted draft reports for planning applications. Reports should be reviewed before submission. We do not guarantee planning approval.

Frequently asked questions

Is the planning fee the same everywhere in England?

Yes for the same type of application. Planning fees are set nationally in the fee regulations, were increased in December 2023 and are subject to annual indexation, so use the Planning Portal fee calculator for the current figure. Building control charges are different: each authority sets its own on a cost recovery basis, so they vary locally.

Do I pay a planning fee if an Article 4 direction caused the application?

No fee is payable where an application for planning permission is required only because an Article 4 direction has removed the permitted development right that would otherwise have covered the work. This catches out householders in conservation areas who assume the standard fee applies. Confirm the position with the authority when you submit.

Should I use full plans or a building notice?

Use full plans for anything structural, anything a lender or buyer will scrutinise, and anything involving a beam. The plans are checked before work starts, so problems surface on paper rather than on site. A building notice suits very simple work only and is not available for certain buildings, including higher-risk buildings.

What happens if work was done without Building Regulations approval?

You can apply for regularisation, which costs more than the normal charge and usually requires opening up completed work so it can be inspected. Indemnity insurance is sometimes offered on a sale instead, but it only covers the risk of council action and is not evidence that the construction is sound.

Does planning permission cover Building Regulations?

No. They are separate approvals with separate applications, separate fees and separate teams, and neither implies the other. Work can be lawful in planning terms and still be in breach of the Building Regulations, and vice versa. Where a planning condition and a regulation conflict, the planning condition has to be varied.

Sources and further reading

building regulationsplanning feesbuilding controlhouseholderbudgetingcompletion certificate

This article is general guidance about the planning system in England and, where stated, the rest of the UK. It is not legal or professional advice. Check your local planning authority’s validation requirements and take professional advice for your specific site.

More in Costs, Fees and Budgeting

View all →
Costs, Fees and Budgeting8 min read

Costing a stopping up order for a highway or footpath

Public rights do not lapse through disuse and planning permission does not override them. This covers the section 247 and 257 routes, what objectors actually argue about, and how to keep the order off the critical path.

Read article →
Costs, Fees and Budgeting7 min read

Costing an affordable housing review mechanism

Early and late stage review mechanisms are decided by their definitions, not their headline percentages. This covers the inputs that move the answer, who pays for the review and the caps to secure before signing.

Read article →
Costs, Fees and Budgeting7 min read

Costing an employment land assessment for an allocated site

On an allocated employment site the fee sits in evidence gathering, not analysis. This covers the marketing records councils expect, the suitability tests that decide it, and how to sequence the work.

Read article →
Costs, Fees and Budgeting7 min read

Costing an odour assessment for a kitchen or waste use

The fee for an odour assessment depends on whether the council accepts a qualitative risk based appraisal or expects dispersion modelling. Here is what sits behind each, and how to scope the work before you commission it.

Read article →
Costs, Fees and Budgeting6 min read

Costing a telecommunications compliance declaration for a mast

An ICNIRP declaration is produced by the operator's own radio engineers and closes the health issue. Siting and appearance are the only matters the council can decide on.

Read article →
Costs, Fees and Budgeting6 min read

Costing an equalities impact assessment for a public applicant

The public sector equality duty is continuing, so an equalities impact assessment has to be revisited at every material change. Budgeting for one document is the common mistake.

Read article →