Rural and Agricultural

Camping and caravan use under the 60 day right

6 min readBy PlanScope Editorial Team

The general temporary use right and the recreational campsite right are separate allowances with separate day counts. Records decide enforcement cases, so keep them as you go.

Part 4 of the General Permitted Development Order contains two separate temporary use rights, and confusing them is what gets landowners an enforcement notice. The general temporary use right allows land to be used for any purpose for a limited number of days each calendar year. The temporary recreational campsite right allows camping specifically, for a longer period, with a cap on pitches and a set of conditions attached, including notifying the local planning authority before the use starts.

They are separate allowances. Running a campsite under one and a wedding marquee under the other is possible, but the day counts do not merge, and the record keeping has to show which day was used for what.

What the rights allow

The general right in Part 4 covers the temporary use of land, other than a building, for any purpose, together with moveable structures provided for the purposes of that use. The annual allowance is limited, with a shorter sub-limit for markets and for motor vehicle racing. It is the right that underpins farm open days, seasonal car parking, festivals and short lets of a field.

The recreational campsite right is narrower in purpose and more generous in duration, permitting use of land as a campsite for a longer annual period with a maximum number of pitches, subject to conditions covering the facilities that may be provided and the land the right does not apply to.

The exclusions matter more than the headline numbers. Both rights are restricted on certain designated and hazardous land, and the lists have been amended more than once. Read the current text of Part 4 on the legislation service before planning a season. Anyone relying on a summary written before the last amendment is relying on the wrong numbers, and that includes summaries published by otherwise reliable sources.

Counting the days

Count generously and write it down as you go. The day count is the single point on which enforcement cases are decided, and the burden of showing that a use is within a permitted development right falls on the person relying on it.

Three habits protect you.

  1. Keep a dated diary of every day the land is in the temporary use, with photographs. A phone photograph with its date is better evidence than a spreadsheet compiled afterwards.
  2. Count setting up and clearing away. A marquee erected on the Thursday for a Saturday event has put the land into that use on the Thursday, and an authority will treat it that way.
  3. Keep separate columns for separate rights and separate parcels. The allowance attaches to the land, so two fields can each have their own count, but only if the parcels are identifiable and the records show which was used.

Bookings, invoices, social media posts and card terminal records are all obtainable by the authority. A diary that disagrees with the booking system is worse than no diary at all.

Structures that fall outside the right

Moveable structures are permitted for the purposes of the temporary use, and they have to go when the use stops. Anything that stays is a separate question.

Hardstanding, an all-weather access track, a permanent shower or toilet block, a reception building, a septic tank, fixed lighting columns and permanent service connections are all operational development requiring planning permission in their own right. So is engineering work to level a field.

This is where most temporary campsites drift into a breach. The first season runs on portable toilets and a mown track. The second season adds a gravel surface because the field cut up, and a timber shower block because guests complained. At that point there is permanent development on the land and a use that is no longer temporary in character, and the authority is entitled to look at the whole picture rather than at the day count.

Caravans add a second regime. Site licensing under the Caravan Sites and Control of Development Act 1960 runs alongside planning, with its own exemptions for small numbers of vans, for certificated sites operated by exempted organisations and for use within the curtilage of a dwelling. The exemptions are not the same as the planning day limits, and satisfying one does not satisfy the other. The practical detail of stationing vans on farmland is covered in mobile homes and caravans on agricultural land.

Facilities that turn a temporary use into a change of use

Ask one question about every improvement: would a visitor arriving in February know this field is used as a campsite?

Permanent pitch markers, numbered bays, a hardstanding entrance apron, a bin store, a fixed sign at the gate and mains water standpipes all answer yes. Once the answer is yes for several of them together, the character of the land has changed and the use is no longer temporary, whatever the calendar says.

Officers assess this in the round rather than item by item. That makes it hard to advise on precisely, and it is the honest uncertainty in this area: there is no threshold in the Order, only a judgement about character that an inspector will make on the evidence.

Moving to a permanent permission

Where the operation works, applying for permission is usually the better outcome than running a bigger business inside a smaller right. A change of use application for a campsite or a certificated caravan site normally needs:

  • A Planning Statement setting out the rural economy and tourism policies in the development plan and how the proposal meets them.
  • A landscape appraisal, or a full Landscape and Visual Impact Assessment where the site is in or near a National Landscape or National Park.
  • An ecological appraisal, particularly where the field has been grazed rather than cropped and may hold species-rich grassland.
  • Highway evidence at the access, since the visibility standards at a field gate were never designed for touring caravans. Rural road visibility evidence has to be measured on site.
  • Foul drainage and water supply details, and a lighting strategy in a dark landscape area.

Expect the authority to offer a temporary or seasonal permission first, with conditions limiting the number of pitches, the operating months and the removal of units outside the season. Take it. A three year permission with a clean compliance record is the strongest possible case for a permanent one.

Enforcement, and what to keep

A local planning authority that suspects the day limits have been exceeded will usually start with a planning contravention notice requiring information about the use of the land. Answering it accurately is a legal obligation, and answering it evasively converts a manageable situation into a prosecution risk.

If an enforcement notice follows, the appeal grounds available include that planning permission was not required because the development was permitted, and that is where the diary earns its cost. Ground of appeal aside, a temporary stop notice can halt the use immediately, in the middle of a booked season.

Keep the records for at least ten years. Keep them in a form someone else could read. And if a season is going to run over the allowance, apply for permission in the spring rather than arguing about it in August.

Enter your postcode on PlanScope to see which documents a rural tourism or campsite application is likely to need.

This is general guidance, not legal advice; check the position with your local planning authority or a qualified professional before relying on it. A lawful development certificate is the only formal way to confirm that works or a use are lawful. PlanScope provides AI-assisted draft reports for planning applications. Reports should be reviewed before submission. We do not guarantee planning approval.

Frequently asked questions

How many days can I use a field for camping without permission?

Part 4 of the General Permitted Development Order contains a general temporary use right with one annual allowance and a separate temporary recreational campsite right with a longer one and a cap on pitches. The allowances do not merge, and both carry exclusions for certain designated and hazardous land. Read the current text of Part 4 before planning a season.

Do set-up and clearance days count towards the limit?

Treat them as counting. Once a marquee or pitch infrastructure is erected, the land is in that use, and authorities assess it on that basis. Keep a dated diary with photographs, count generously, and make sure it agrees with your booking and payment records, because the authority can obtain those and a mismatch is damaging.

Can I put in toilets and a track under the temporary use right?

Only moveable structures provided for the purposes of the temporary use, and they must be removed when the use stops. Hardstanding, an all-weather track, a permanent shower or toilet block, a septic tank, fixed lighting and mains connections are all operational development needing planning permission in their own right.

Does a caravan site licence replace planning permission?

No. Site licensing under the Caravan Sites and Control of Development Act 1960 runs alongside planning and has its own exemptions for small numbers of vans, certificated sites operated by exempted organisations and use within the curtilage of a dwelling. Those exemptions are not the same as the planning day limits, and one does not satisfy the other.

What happens if a council thinks I have exceeded the days?

It will usually serve a planning contravention notice requiring information about the use of the land, which you are legally obliged to answer accurately. An enforcement notice may follow, and a temporary stop notice can halt the use immediately in the middle of a booked season. A contemporaneous dated diary is the practical defence.

Sources and further reading

campingcaravanspermitted developmenttemporary userural diversificationenforcement

This article is general guidance about the planning system in England and, where stated, the rest of the UK. It is not legal or professional advice. Check your local planning authority’s validation requirements and take professional advice for your specific site.

More in Rural and Agricultural

View all →
Rural and Agricultural7 min read

Succession, tenancies and who applies for permission

Planning permission runs with the land, so a tenant, a landlord or a promoter can all apply over the same field. The safeguard is the ownership certificate and the 21 day notice to agricultural tenants.

Read article →
Rural and Agricultural8 min read

Redundant farm buildings and the demolition question

Most standalone agricultural buildings can be demolished without a planning application, yet demolition removes any later conversion right and brings asbestos, ecology and restoration duties with it.

Read article →
Rural and Agricultural7 min read

Diversifying into events in a working farmyard

Part 4 of the General Permitted Development Order allows 28 days of temporary use a year on land, but excludes buildings and anything inside a curtilage. Where that leaves farm events, and the evidence a permanent consent needs.

Read article →
Rural and Agricultural8 min read

Visibility splays onto a rural lane

A speed survey comes before the drawing. How visibility splays are derived on an unclassified lane, how to measure them, and the land control problem nobody plans for.

Read article →
Rural and Agricultural7 min read

Re-using a rural building in the Green Belt

Two limbs decide a Green Belt conversion: permanent and substantial construction, and preserving openness. Most applications satisfy the first and lose on the curtilage.

Read article →
Rural and Agricultural7 min read

Livestock buildings and the distance to housing

The only fixed figure is the 400 metre permitted development limit. Beyond that, odour modelling, ventilation design and manure management decide what separation is acceptable.

Read article →