Viability, Obligations and Commercial

Car club and cycle hire contributions as mitigation

8 min readBy PlanScope Editorial Team

Shared vehicle and cycle hire contributions are the usual price of reduced parking. What the regulation 122 tests require, why an on-street bay is outside the developer's control, and how to draft for that.

A car club contribution is a planning obligation that asks a developer to pay for, or deliver, shared vehicle access as the price of reduced private parking. The usual package is a bay, a sum towards the vehicle and its on-street order, and free membership with driving credit for each new home. Cycle hire contributions work the same way, with the money going towards a docking station or a scheme extension rather than a bay.

Both have to pass the same three tests as any other obligation. They must be necessary to make the development acceptable in planning terms, directly related to the development, and fairly and reasonably related in scale and kind to it. That is regulation 122 of the Community Infrastructure Levy Regulations 2010, and it is the paragraph to open with when a request looks like a tariff.

Where the requirement comes from

Nothing in national policy says a scheme must fund a car club. The request comes from a development plan policy on parking or sustainable travel, from supplementary guidance on parking standards, or in London from the London Plan's parking policies and the car-free approach that applies to much of the city. A borough that permits a 60 flat scheme with eight spaces is relying on something to absorb the car ownership it has designed out, and shared vehicles are the most common answer.

So the first question on a request is which policy it sits under, and whether that policy is in the adopted plan or in an aspiration document. An obligation founded on an emerging policy or an officer's practice rather than on the plan is answerable.

The second question is whether the development actually generates the need. A scheme of two bedroom flats within 400m of a station with a frequent service has a different parking demand profile from 12 houses on the edge of a market town, and the obligation should reflect that rather than a borough-wide rate per unit.

On-street bays and the highway process

This is where applicants underestimate the programme. A bay on the public highway needs a traffic regulation order made by the highway authority under the Road Traffic Regulation Act 1984. The order has to be advertised, objections have to be considered, and the authority decides. A developer cannot deliver it, cannot guarantee it, and should not sign an obligation that assumes it.

Three practical consequences follow.

  1. The obligation should be drafted so the developer funds the order and the bay construction, with the authority taking responsibility for making the order. A clause that makes occupation conditional on a bay being in place hands the developer a risk it cannot control.
  2. Where the order fails because of objections, the agreement needs a fallback. The usual drafting converts the bay sum into an off-site contribution or an alternative measure agreed in writing.
  3. Timing should be tied to a realistic trigger. First occupation of the final phase is more achievable than first occupation of the first unit, because orders routinely take longer than the build.

An off-street bay inside the site avoids the order entirely, and on larger schemes that is worth proposing. It costs the developer a space and removes a whole process. The downside is visibility, since an on-street bay recruits members from the surrounding streets and an internal one does not.

The highway works themselves, including bay marking, signage, dropped kerbs and any build-out, belong in the appraisal as a cost line rather than as a note, and our guide to highway works costs in a development appraisal sets out how those figures are tested.

Membership and credit obligations

The membership element is usually drafted as free membership for each dwelling for a stated period, with a driving credit. Watch three details in the drafting.

Who holds the membership. An obligation granting membership to "each dwelling" is awkward where flats change hands in the first year, so the better drafting gives the benefit to the first occupier of each unit, with a mechanism for transfer.

How the credit is paid. Operators administer credits differently, and an obligation that specifies a mechanism one operator does not offer becomes unenforceable in practice. Draft the outcome and leave the mechanism to a scheme approved in writing.

What happens at the end. A three year membership period with no monitoring and no reporting ends quietly. If the authority wants evidence of take-up, that reporting duty needs to be in the deed, and it is a cost the developer should price.

Sums for cycle hire infrastructure

Cycle hire contributions only make sense where a scheme exists or is planned within a usable distance. The sum normally covers a share of a docking station, its installation and its early operating cost, and in London it is sought towards the cycle hire network.

Two questions decide whether the request is sound. First, is there a published cost basis for a docking point, or is the figure a round number. Second, will the station serve the development, which means asking where it would physically go and whether the highway authority has agreed the location in principle. A contribution towards a docking station with no identified site is vulnerable on the directly related limb of regulation 122.

Where the local scheme is dockless, the position changes again. Funding for dockless parking bays, geofenced zones or operator agreements can be legitimate, and the deed should name the outcome rather than the technology, because operators and models change inside the life of a permission.

Car-free covenants and permit restrictions

A car-free obligation is a covenant by the owner not to apply for a residents' parking permit, usually enforced through the authority's permit database by reference to the addresses in the agreement. It only works where a controlled parking zone already covers the streets around the site. Without a zone there is nothing to exclude the occupier from, and the covenant is decoration.

Where a zone is proposed but not yet made, the obligation should deal with the gap honestly. Either the scheme is assessed as if occupiers will park on-street, or the permission is timed around the zone. A deed that assumes a future zone, and a transport assessment that assumes car-free behaviour, is the combination that produces overspill and an enforcement complaint in year two.

Buyers need telling. The obligation binds the land, so the restriction must appear in the sales pack and in the lease or transfer. Authorities increasingly require a clause obliging the developer to notify purchasers, and that is reasonable.

Whether the mitigation is deliverable

An obligation that cannot be performed is worse than no obligation, because it delays occupation and sours the relationship with the authority. Test deliverability before signing.

Element The real constraint Drafting response
On-street bay Traffic regulation order process and objections Developer funds, authority delivers, with a fallback sum
Operator willingness Membership density needed to sustain a vehicle Obligation to use reasonable endeavours, plus alternative provision
Membership credits Operator's own systems Specify the outcome, approve the mechanism later
Cycle hire Identified site and scheme capacity Contribution tied to a named scheme or returned
Permit restriction Existence of a controlled parking zone Covenant conditional on the zone being in force

Operator willingness is the one most often skipped. A single vehicle in a suburban location with no surrounding membership base is unlikely to be taken on, and an obligation requiring the developer to secure an operator is then an obligation to achieve the impossible. Reasonable endeavours wording, with a defined alternative, is the way through.

Where the cumulative package starts to affect scheme economics, the position belongs in a Viability Assessment with the sums itemised. Councils normally expect that work to come from a suitably qualified author, and professional review of any draft is strongly advised before it goes in. Expect the authority to commission its own check, a process covered in our note on independent review of a viability appraisal.

What the evidence can and cannot show

Be careful with claims about effect. Published monitoring of shared vehicle schemes exists, and so do travel plan surveys, but the figures vary by location and are not transferable from an inner city to a market town. Avoid quoting a national average as if it applied to the site.

What the application can show is more modest and more useful. The distance from the site to the nearest existing shared vehicle, the existing membership in the postcode district where the operator publishes it, the parking stress in the surrounding streets measured by survey, and the public transport accessibility. Those are site facts. They support or undermine the case for the obligation on their own terms.

And where the authority's request exceeds what the evidence supports, say so in writing, with the regulation 122 tests set out against each element. Officers negotiate obligations more readily than they negotiate policy, and the format of the submission affects the outcome, as we set out in viability appraisal outputs and what to submit.

Enter your postcode on PlanScope to see which transport and viability reports your scheme is likely to need.

This is general guidance, not legal advice. Check the position with your local planning authority or a qualified professional before relying on it. PlanScope provides AI-assisted draft reports for planning applications. Reports should be reviewed before submission. We do not guarantee planning approval.

Frequently asked questions

Can a council require a car club contribution?

Only where the obligation satisfies regulation 122 of the Community Infrastructure Levy Regulations 2010, meaning it is necessary to make the development acceptable, directly related to it and fairly related in scale and kind. The request also needs a basis in the adopted development plan rather than in emerging policy or local practice.

Who delivers an on-street car club bay?

The highway authority, through a traffic regulation order under the Road Traffic Regulation Act 1984. The order must be advertised and objections considered, so the outcome is outside the developer's control. Draft the obligation so the developer funds the order and the works while the authority delivers them, with a fallback contribution if the order fails.

Does a car-free obligation work without a parking zone?

No. The covenant operates by excluding the named addresses from residents' parking permits, which needs a controlled parking zone to already cover the surrounding streets. Where a zone is only proposed, either assess the scheme on the basis that occupiers will park on-street or tie the permission to the zone being in force.

What if no operator will take the bay?

That is a real risk in low density locations, because a shared vehicle needs surrounding membership to sustain it. An obligation requiring the developer to secure an operator may be impossible to perform. Reasonable endeavours wording, with a defined alternative measure or an off-site contribution, keeps the agreement enforceable and the occupation trigger achievable.

Is a cycle hire contribution defensible?

It depends on whether a scheme exists or is planned within a usable distance, whether there is a published cost basis for a docking point, and whether a location has been agreed in principle with the highway authority. A sum towards a docking station with no identified site is open to challenge on the directly related test.

Sources and further reading

car clubcycle hiresection 106planning obligationsparkingsustainable transport

This article is general guidance about the planning system in England and, where stated, the rest of the UK. It is not legal or professional advice. Check your local planning authority’s validation requirements and take professional advice for your specific site.

More in Viability, Obligations and Commercial

View all →
Viability, Obligations and Commercial7 min read

Purchase price and the viability defence

National guidance says the price paid for land is not, by itself, a justification for departing from policy. The benchmark is existing use value plus a premium, and the gap is the buyer's problem.

Read article →
Viability, Obligations and Commercial7 min read

Viability at appeal: what inspectors expect

Viability appeals turn on four or five inputs. Agree everything else in the statement of common ground and put the evidence behind the disputed figures.

Read article →
Viability, Obligations and Commercial7 min read

Open book viability and what becomes public

National guidance expects viability assessments to be open book and publicly available, with sensitive detail aggregated rather than withheld. Write the appraisal on that basis from the start.

Read article →
Viability, Obligations and Commercial8 min read

Affordable housing tenure split and the viability argument

Two schemes with identical 35 per cent provision can sit far apart on residual land value depending on tenure. Why that happens, how to argue for substitution, and the drafting that makes it hold.

Read article →
Viability, Obligations and Commercial8 min read

Varying a planning obligation under section 106A

For the first five years the authority holds a veto on changing an obligation. The agreement route, the statutory route, the narrow grounds that apply to it, and how to draft a variation that survives a title check.

Read article →
Viability, Obligations and Commercial8 min read

Phased payments and instalment policies for the levy

The default is the whole levy within 60 days of starting on site. Instalment policies, phased permissions and the notice sequence that protects both, plus the surcharges for getting it wrong.

Read article →