Which Reports Do I Need

Which documents a care home of sixty bedrooms needs

7 min readBy PlanScope Editorial Team

Class C2 changes the assessment, and resident vulnerability changes the evidence. Here is the document set a sixty bedroom care home application usually needs.

A sixty bedroom care home is major development, and the care home planning documents needed reflect that rather than anything about the number of beds. At roughly 3,000 to 4,000 square metres of floorspace the scheme passes the floorspace threshold for a major application, which brings a thirteen week determination period, the full consultation machinery and an evidence base closer to a housing scheme of a hundred units than to a large house. The two things that make it different from housing are the use class and the vulnerability of the people who will live there.

The use class and why it matters

A residential care home with personal or nursing care falls within Class C2, residential institutions. That is not Class C3, and the difference runs through the whole application.

C2 schemes are generally outside affordable housing policy, though a few authorities seek contributions and some treat certain extra care models differently. They also generate different trip patterns, different parking demand and different amenity expectations, so applying housing standards to them produces the wrong answers in both directions.

The boundary is where arguments start. A scheme of self-contained flats with care available on call is often C3 or sui generis rather than C2, and the classification affects affordable housing, the levy position and the space standards that apply. Describe the care model in the application: the level of registration sought, whether nursing is provided, staffing ratios by shift, and whether units are self-contained. The distinction is examined further in the note on which reports an extra care housing scheme needs.

Where the classification is contested, resolve it at pre-application. It is a poor use of the determination period.

Health and social care need evidence

Councils increasingly ask whether the home is needed, particularly where the site is allocated for something else or sits in the countryside. Answer it with the authority's own published evidence rather than with market assertion.

The documents that carry weight are the local authority's market position statement for adult social care, the joint strategic needs assessment for the area, the published bed capacity and occupancy data, and the demographic projections for the relevant age cohorts in the council's own evidence base. Cite them by name and date, quote the relevant passage, and set the scheme against it.

Say what the home offers that existing provision does not: nursing beds where the shortfall is in nursing rather than residential, dementia specialist places, or capacity in a part of the district with none. A need case built on national trends and no local data will be given little weight.

Transport, servicing and staff parking

Care home trip generation looks nothing like housing. The peaks come at shift changes rather than at the commuter peak, visitor arrivals cluster at weekends and in the afternoons, and there is a steady stream of deliveries, laundry, clinical waste collections and healthcare visits through the day.

A transport assessment is normally required at this scale, and it should use trip rates for the correct land use rather than a residential proxy. Set out staff numbers by shift with the changeover times, and show that parking is sized for the overlap between shifts rather than for the average.

Servicing needs a drawing. Ambulance access to a covered entrance, a refuse and clinical waste collection point reachable without reversing, a delivery bay, and a turning area proved by vehicle tracking for the largest vehicle expected. Add a travel plan with staff measures, because staff travel is where the sustainable transport case is won on a use with immobile residents.

Amenity space and daylight for residents

Residents spend most of their time indoors, much of it in their own room, which raises the importance of the daylight and outlook evidence.

Provide a daylight and sunlight assessment addressing the proposed bedrooms and lounges as well as the effect on neighbours, and test the internal courtyards, which are where the poor rooms usually are. Show sunlight to the garden through the year, because an amenity space in permanent shade is not usable by people who are sensitive to cold.

Design the garden as a therapeutic space rather than as landscaping left over from the parking layout: level or gently graded circulation routes, handrails, seating at short intervals, shelter, a clear route back to the building and secure boundaries where dementia care is provided. Say all of this in the design statement, because it is the part of the scheme a planning committee will ask about.

Noise and air quality at a sensitive use

A care home is a noise sensitive and air quality sensitive receptor, so the assessments run in both directions.

Incoming noise from roads, railways or neighbouring commercial uses has to be assessed and the internal levels demonstrated, which on a constrained site drives the glazing and ventilation strategy and interacts with overheating. Outgoing noise from the home's own plant, the kitchen extract, the laundry and the generator has to be assessed against the nearest residential neighbours.

Air quality matters where the site sits in or near a management area or on a busy corridor. Exposure of a vulnerable population is weighed more heavily than exposure of working age occupants, and the mitigation usually involves the position of intakes, the orientation of habitable rooms and planting rather than a technical fix.

Flood risk carries the same logic. Residential institutions are classified as more vulnerable in the flood risk vulnerability table, so a site in Flood Zone 3a engages the exception test, and evacuating a building full of people with limited mobility is not a credible answer to a residual risk question. Establish the flood zone before the site is bought.

Fire evidence for a specialised residential building

Fire strategy for a care home is a discipline of its own, built around progressive horizontal evacuation rather than simultaneous escape, because residents cannot self-evacuate down a stair.

That drives the plan form: compartments on each floor sized so residents can be moved sideways to a place of relative safety, adequate door widths and turning space for evacuation equipment, and refuge provision. National fire safety guidance also points towards sprinkler protection in new residential care homes, and that decision affects the layout and the structure, so take it early.

Whether a fire statement is required at Planning Gateway One depends on whether the building falls within the definition of a relevant building and meets the height condition. A typical two or three storey care home will not, but a taller scheme may, and the point is worth confirming with the authority and with the building safety regulator rather than assumed. Fire statements and fire safety strategies must be prepared by someone with the necessary fire engineering competence, and an AI-assisted draft is a starting point for that engineer.

Obligations and contributions

Expect the negotiation to cover highway works and any access improvement, a travel plan with a monitoring contribution, and sometimes contributions towards local infrastructure where the council can demonstrate the need arises from the development.

The community infrastructure levy position depends on the charging schedule, and authorities treat C2 development differently from housing, with some applying a nil rate and others a specific rate. Check the schedule and any published instalment policy at the outset, because a levy liability discovered after permission is a cash flow problem rather than a planning one.

Affordable housing is not usually sought on a genuine C2 scheme. Where the proposal drifts towards self-contained units with care, that changes, which is another reason to settle the use class question first.

The full document set for a scheme of this kind typically runs to a planning statement, design and access statement, need assessment, transport assessment and travel plan, noise and air quality assessments, daylight and sunlight work, flood risk assessment and drainage strategy, ecology with a biodiversity gain plan, arboricultural assessment, energy and sustainability statements, a construction management plan and a statement of community involvement. Browse the report types index to see how they sit together, or enter your postcode to see which apply to a specific site.

This is general guidance, not legal advice; check the position with your local planning authority or a qualified professional before relying on it. PlanScope provides AI-assisted draft reports for planning applications. Reports should be reviewed before submission. We do not guarantee planning approval.

Frequently asked questions

Is a care home Class C2 or Class C3?

A residential care home providing personal or nursing care falls within Class C2, residential institutions. A scheme of self-contained flats with care available on call is often Class C3 or sui generis instead. The distinction affects affordable housing policy, the levy position and the space standards that apply, so settle it at pre-application.

Does a sixty bed care home count as major development?

Almost always, because at roughly 3,000 to 4,000 square metres it passes the floorspace threshold for a major application even though it contains no dwellings. That brings a thirteen week determination period, wider consultation and an evidence base comparable to a housing scheme of around a hundred units.

What need evidence should a care home application include?

The local authority's market position statement for adult social care, the joint strategic needs assessment, published bed capacity and occupancy data, and demographic projections from the council's own evidence base. Cite each by name and date and set the scheme against it, explaining what the home offers that existing provision does not.

How is care home parking assessed?

By shift pattern rather than by bed number. Peaks occur at staff changeover rather than the commuter peak, with visitor clustering at weekends and afternoons and a steady flow of deliveries and healthcare visits. Size parking for the overlap between shifts, and prove servicing and ambulance access with vehicle tracking.

How does flood risk affect a care home site?

Residential institutions are classified as more vulnerable in the flood risk vulnerability table, so a site in Flood Zone 3a engages the exception test. Evacuation is not a persuasive answer to residual risk in a building occupied by people with limited mobility, so establish the flood zone before committing to a site.

Does a care home need a fire statement at Gateway One?

It depends on whether the building falls within the definition of a relevant building and meets the height condition. A typical two or three storey home will not, but a taller scheme may. Confirm with the authority and the building safety regulator rather than assuming, and have any fire document prepared by a competent fire engineer.

Sources and further reading

care homeclass c2major developmenttransport assessmentflood riskfire strategy

This article is general guidance about the planning system in England and, where stated, the rest of the UK. It is not legal or professional advice. Check your local planning authority’s validation requirements and take professional advice for your specific site.

More in Which Reports Do I Need

View all →
Which Reports Do I Need7 min read

Reports for a rooftop pool on a flat conversion

A rooftop pool on a converted block turns on three pieces of evidence: the weight of water on the existing structure, the noise of wet plant, and what the enclosure does to the roofline.

Read article →
Which Reports Do I Need7 min read

Reports for a sand and gravel extension of six hectares

A six hectare gravel extension is decided by the mineral planning authority, needs an EIA screening opinion, and turns on hydrogeology and restoration rather than on blasting.

Read article →
Which Reports Do I Need6 min read

Reports for a traveller site with four pitches

A four pitch traveller site is a minor application with a major policy test. Need evidence, pitch separation and flood vulnerability decide most of these cases.

Read article →
Which Reports Do I Need7 min read

Reports for a micro hydro scheme on a weir

Micro hydro at a weir needs planning permission plus abstraction, impoundment and flood risk permits. The fish pass is often the costliest item, and it has to be settled before the drawings.

Read article →
Which Reports Do I Need7 min read

Reports for a student accommodation scheme of 200 beds

A 200 bed student scheme is a major application with two documents that have no equivalent on a standard residential pack: the institutional need case and the student management plan.

Read article →