Professionals and Qualifications

Checking an ecologist's licence before you appoint them

6 min readBy PlanScope Editorial Team

Protected species licences are personal, species-specific and time-limited. Ten minutes of checking protects the one thing that cannot be fixed later.

Before you appoint an ecologist for anything involving bats, great crested newts, dormice or badgers, ask for the licence number and check what it actually permits. A protected species licence check ecologist exercise takes ten minutes and protects you from the one outcome that cannot be fixed later: survey work carried out unlawfully, which taints the evidence and can leave you and the surveyor exposed to prosecution.

The licence is species-specific, method-specific and time-limited. Holding one for bats says nothing about newts.

Why the licence matters and what it permits

Most of the activities an ecologist needs to carry out on a protected species survey are criminal offences without a licence. Disturbing a bat in its roost, entering a badger sett, handling great crested newts and taking eggs from a nest are offences under the Wildlife and Countryside Act 1981, the Protection of Badgers Act 1992 and the Conservation of Habitats and Species Regulations 2017.

Natural England issues two broad families of licence in England. Survey and research licences permit the disturbance involved in finding out what is present. Mitigation licences, sometimes called development licences, permit the offences involved in carrying out works that will damage or destroy a roost, a pond or a sett, subject to a mitigation scheme.

A surveyor who turns up to do a bat emergence survey needs the first type. The development itself needs the second, applied for after planning permission is granted and usually after the detailed method is fixed. Those are separate applications with separate timescales, and conflating them is how schemes lose a season.

Class licences against bespoke mitigation licences

A class licence is a general permission published by Natural England, which a registered person may act under by notifying rather than by applying each time. The registered person has to be accepted onto the class licence by meeting stated experience and competence criteria, and the licence sets limits on what can be done under it.

A bespoke mitigation licence is applied for by, or on behalf of, the applicant for a specific site and a specific scheme. It takes longer, requires a detailed method statement and mitigation plan, and is the route where the scale of impact goes beyond what a class licence permits.

Ask which route your ecologist intends to use, and why. If the answer is a class licence, ask for the registration number and the licence reference. If the answer is a bespoke licence, ask for an honest estimate of the determination period and build it into the programme, because the licence is needed before the works start rather than before the application is made.

Which register or record to ask for

Natural England publishes guidance on wildlife licences and maintains the registers for class licence holders. The practical sequence is this.

  1. Ask the ecologist in writing for the licence number, the species covered, the methods permitted and the expiry date.
  2. Ask for a copy of the licence document itself, not a summary.
  3. Check the name on the licence matches the person who will be on site, rather than a colleague or the firm.
  4. Confirm with Natural England where the licence type is one held on a published register.
  5. Record what you checked and when.

The third point is where most problems are found. Licences are personal. A practice may have three licensed bat workers and eight staff, and the person sent to your site in August may not be one of the three. Ask who is attending, by name.

Reading a licence

Four fields matter. The species, because a bat licence does not cover newts. The methods, because a licence may permit capture and handling but not endoscope inspection, or permit disturbance but not obstruction of an access point. The geographic scope, because some licences are limited. And the expiry date, because a survey carried out a fortnight after a licence lapses is unlawful even if everything else was correct.

Read the conditions as well. Class licences typically require registration to be current, records to be submitted to Natural England within a stated period, and the licensed person to be present on site rather than supervising remotely. A licence held by someone who has stopped submitting returns can be suspended.

Where the survey is a preliminary walkover rather than a licensed activity, no licence is needed at all. A Preliminary Ecological Appraisal and a daytime inspection of a building for signs of bats sit outside the licensing regime, which is one reason that work can be commissioned quickly while the licensed survey waits for the season.

Questions to put in writing before appointment

Send these before the fee is agreed, and keep the replies.

  • Which licence will you be working under for each survey type, and what is its number and expiry date?
  • Who will be on site, and are they personally named on that licence?
  • What is your professional indemnity cover, and does it extend to protected species advice?
  • Which survey windows apply to this site, and what is the earliest date a full result can be reported?
  • If a mitigation licence turns out to be needed, who applies for it and what is the expected timescale?
  • What happens to the programme if the survey finds a roost?

That last question separates the ecologists who will tell you bad news early from the ones who will not. An honest answer describes the branch in the road rather than reassuring you it will not happen.

What happens if work proceeds without a licence

The offences are criminal and they attach to the person doing the work and, potentially, to the person who caused or permitted it. Natural England can refuse a subsequent mitigation licence where earlier works have already destroyed the feature, which leaves a development unable to proceed lawfully at all.

In planning terms the consequences arrive earlier. An authority that sees survey work reported by an unlicensed surveyor will normally treat the Protected Species Survey as unreliable and ask for it again, in season. A Bat Survey rejected in September means waiting until the following May.

Protected species surveys and any mitigation licence require a suitably licensed ecologist under the Wildlife and Countryside Act 1981 and the Conservation of Habitats and Species Regulations 2017. An AI-assisted draft is a starting point for that professional and never a substitute for the survey itself.

Recording the check on your project file

Keep a single page in the project file with the surveyor's name, the licence number and type, the species and methods covered, the expiry date, the date you checked and how. Attach the licence copy and the appointment letter.

Two moments make that page worth the effort. The first is validation, when a council asks who carried out the survey and under what authority. The second is sale or funding, when a purchaser's solicitor works through the ecology chain and finds a gap. A reviewer from the professional directory will ask for the same evidence before putting their name to a report.

PlanScope provides AI-assisted draft reports for planning applications. Reports should be reviewed before submission. We do not guarantee planning approval. This is general guidance, not legal advice; check the position with your local planning authority or a qualified professional before relying on it.

Frequently asked questions

Does every ecological survey need a licence?

No. A preliminary ecological appraisal, a daytime building inspection for signs of bats and a habitat condition survey for the biodiversity metric are unlicensed activities. A licence is needed where the work itself would otherwise be an offence, such as disturbing a bat roost, handling great crested newts or entering a badger sett.

What is the difference between a survey licence and a mitigation licence?

A survey or research licence permits the disturbance involved in finding out what is present. A mitigation licence permits the offences involved in carrying out works that damage or destroy a roost, pond or sett, and is granted against a mitigation scheme. The second is usually applied for after planning permission, before works start.

Can a licensed ecologist supervise an unlicensed colleague?

Only within the terms of the licence. Many licences require the named person to be present on site and set limits on the number of assistants. Check the conditions rather than assuming, and ask by name who will attend. Licences are personal to the holder, not held by the consultancy.

How long does a bespoke mitigation licence take?

Determination periods vary with demand and with the quality of the application. Ask your ecologist for a current estimate and build it into the programme, because works cannot lawfully start without the licence in hand. Applications supported by a complete method statement and mitigation plan move faster than those needing further information.

What should I do if a licence has expired?

Do not allow the survey to proceed. Work carried out after expiry is unlawful even if the methods were otherwise correct, and the resulting report is likely to be rejected by the authority. Ask for the renewed licence before the visit, and check the expiry date again if the survey season runs across a renewal.

Sources and further reading

ecologyprotected specieslicensingbatsgreat crested newtsappointing consultants

This article is general guidance about the planning system in England and, where stated, the rest of the UK. It is not legal or professional advice. Check your local planning authority’s validation requirements and take professional advice for your specific site.

More in Professionals and Qualifications

View all →
Professionals and Qualifications7 min read

Who may sign a SuDS maintenance and management plan

There is no competent person regime for sustainable drainage maintenance plans. The question an authority is really asking is who holds the duty in twenty years, how it is funded and how plant reaches each component.

Read article →
Professionals and Qualifications8 min read

Townscape assessor competence and peer review

Townscape judgements are opinions, so competence shows in whether the reasoning is traceable. This covers the disciplines that do this work, baseline discipline, design review weight and what a peer review should test.

Read article →
Professionals and Qualifications7 min read

Who prepares an open space assessment

Open space work is survey and data handling measured against the authority's own standards. This covers who should lead by typology, how catchments should be drawn, and the delivery questions the assessment must answer.

Read article →
Professionals and Qualifications7 min read

Who prepares a foul sewage assessment

A foul sewage assessment is judged on three pieces of evidence rather than on the author's title. This sets out who obtains each one, and when a drainage engineer becomes necessary.

Read article →
Professionals and Qualifications6 min read

Who prepares a circular economy statement

A circular economy statement stands or falls on quantified material data. This looks at which member of the design team should lead it, where the tonnages come from, and who carries the post-completion reporting duty.

Read article →
Professionals and Qualifications6 min read

Who prepares a social infrastructure assessment

A social infrastructure assessment is written by a planning consultant from data held by education authorities, integrated care boards and council service departments. Testing those figures is most of the work.

Read article →