Checking trees for bat roost features before felling

6 min readBy PlanScope Editorial Team

A tree with a woodpecker hole or lifting bark may hold a roost. Assessing it properly before felling is a legal obligation, not a courtesy.

Bat roost features in trees are assessed before felling because destroying a roost is an offence whether or not bats are in it at the time. Protection under the Wildlife and Countryside Act 1981 and the Conservation of Habitats and Species Regulations 2017 attaches to the breeding site or resting place, so a woodpecker hole used by a single pipistrelle for three weeks a year is a roost. For anyone reviewing a felling proposal, the first question is what features the tree holds and whether anyone has looked properly.

Tree work is where this goes wrong most often, because the contractor is on site for a day, the tree looks unremarkable from the ground, and nobody commissioned an inspection.

Features that indicate roosting potential

Bats use tree features that stay dry, hold a stable temperature and offer a crevice or cavity. The list is short enough to memorise.

Woodpecker holes and the cavities behind them. Knot holes and the sockets left where a limb has torn out. Splits and shakes along stems and branches, especially where they have started to close over. Lifting, loose or peeling bark on dead or dying stems. Hollows in old pollards and veteran trees. Compression forks where two stems press together. Frost cracks. Dense ivy stems on a trunk, which create sheltered spaces behind them.

Dead and declining trees carry more features than healthy ones, which is why blanket removal of standing deadwood on a site is a problem rather than tidying. Veteran and ancient trees carry the most, and they are usually protected for other reasons too.

Ground level assessment and its limits

The first stage is a preliminary assessment from the ground, using close-focus binoculars and a high-powered torch, ideally when the tree is out of leaf.

It does two things well. It finds features, and it grades the tree for potential. It does one thing badly, which is confirming the absence of a roost, because most features cannot be seen into from below.

That limitation should be stated plainly in the report. An assessment that concludes no evidence of bats was recorded from ground level, without saying what could not be seen, is not a basis for felling.

Where the tree can be retained, the assessment can end there. Retention avoids the whole question, and on a development site that usually means adjusting a layout rather than abandoning it. Our note on clearing a site before applying covers why early clearance creates both legal and planning problems.

Climbing inspection and endoscope survey

Where a feature is present and the tree cannot be retained, the next stage is an aerial inspection. A climber accesses the feature and inspects it directly, usually with an endoscope and a torch.

The team needs two competencies. Arboricultural climbing competence to work at height safely, and ecological competence to identify droppings, staining, feeding remains and bats themselves. Where a bat may be disturbed or a roost entered, the ecologist requires a licence from Natural England.

Findings are recorded feature by feature, with photographs, the height and aspect of each feature, its dimensions, its condition and what was found inside. A feature that is blocked with debris or full of water is reported as such, because that tells you something.

Aerial inspection reduces uncertainty. It does not eliminate it, because bats move between roosts and a feature empty in March can be occupied in June. Where uncertainty remains and the feature has moderate or high potential, emergence surveys from the ground in the active season are the next step.

Seasonal constraints on survey and felling

Period What can be done Limitations
November to February Ground and climbing inspection, best visibility Bats may be hibernating in features
March to April Inspection, early season activity Emergence surveys not yet reliable
May to September Emergence and re-entry surveys Leaf cover obscures features
October Inspection, late activity Survey season closing

Two things are pulling against each other. Features are easiest to see when the leaves are off, and bats are easiest to detect when they are active. Programme the inspection for the winter and leave time for surveys in the following summer if the inspection finds something.

Breeding birds add a second constraint. The nesting season, broadly March to August, restricts felling and heavy tree work regardless of the bat position, and a nest in use is protected in its own right.

Licensing where a roost is confirmed

If a roost is confirmed and the tree has to come down, a European protected species mitigation licence from Natural England is required before the work starts. The application needs a method statement, a justification against the licensing tests, and a mitigation and compensation proposal.

Compensation for tree roosts usually means bat boxes in retained trees nearby, sometimes several per roost lost, sited to reflect the aspect and height of the original feature. Where a veteran tree is involved, retaining the monolith as standing deadwood is often better than felling it entirely.

Licence determination takes time. Build it into the programme as weeks rather than days, and remember that a licence cannot be granted retrospectively after the tree has been felled.

A Protected Species Survey is a report type where a licensed ecologist is legally required, and an AI-assisted draft is a starting point for that ecologist rather than a substitute for the survey or the licence application.

Soft felling and its limitations

Sectional dismantling with sections lowered under control, laid out and left overnight before chipping, is a precautionary method for trees with low roost potential. It gives any bat present a chance to leave.

It is not a licence and it is not a survey. Using it on a tree with a confirmed or high potential feature does not make the work lawful, and an ecologist who signs off soft felling in that situation is exposed.

Where it is used, someone competent should be present during the work, with a plan for what happens if a bat is found. Work stops, the section is left undisturbed, and the ecologist takes over. That instruction needs to be given to the climbing team before the saw starts, not written in a report they never read.

Recording the assessment for the file

Keep a record that would satisfy someone asking the question two years later. The survey date and weather, the surveyor and their licence number, the equipment used, the features recorded with photographs, the grading of each tree, what was inspected aerially and what was not, and the recommendations.

A tree survey to BS 5837:2012 records tree condition and constraints for design purposes and does not answer the bat question, so the two surveys sit alongside each other rather than one replacing the other. The bat survey page covers the survey work in more detail, and our note on penalties for damaging a protected tree sets out the separate offence that applies where the tree itself is protected.

This is general guidance, not legal advice. Check the position with your local planning authority or a qualified professional before relying on it.

PlanScope provides AI-assisted draft reports for planning applications. Reports should be reviewed before submission. We do not guarantee planning approval.

Frequently asked questions

What counts as a potential roost feature?

Woodpecker holes, knot holes, tear-outs and limb scars, splits along branches and stems, lifting or loose bark, frost cracks, hollows and cavities, dense ivy, and the compression forks where two stems meet. Dead and dying trees often hold more features than healthy ones, which is why standing deadwood gets particular attention on a site walkover.

Can I fell a tree with a roost feature if I have not seen any bats?

No. It is an offence to damage or destroy a breeding site or resting place of a European protected species, and the offence does not depend on bats being present at the time. Roosts are protected because bats return to them. Felling a tree with an unassessed feature risks committing an offence even if nothing is found in the timber afterwards.

Who can carry out a climbing inspection?

Someone competent in both disciplines, or a team covering both. The inspection requires arboricultural climbing competence, and where a feature is entered or a bat may be disturbed, the ecologist needs a licence from Natural England. Many practices pair a climbing arboriculturist with a licensed ecologist, or use ecologists who hold climbing qualifications.

Does soft felling remove the need for a survey?

No. Soft felling, meaning sectional dismantling with sections lowered gently and left overnight before processing, reduces risk where a feature has been assessed as low potential. It is a precautionary method rather than a substitute for assessment, and it does not authorise the destruction of a roost. Where a roost is confirmed, a licence is required whatever the method.

What time of year should tree assessments be done?

Ground level and climbing inspections are easier on deciduous trees between leaf fall and bud burst, because features are visible. Bats may be present at any time of year, including hibernating in winter, so timing helps visibility rather than removing risk. Emergence surveys, where needed, have to be done in the active season.

Sources and further reading

batstreespotential roost featuresfellinglicensingprotected species

This article is general guidance about the planning system in England and, where stated, the rest of the UK. It is not legal or professional advice. Check your local planning authority’s validation requirements and take professional advice for your specific site.

More in Trees and Arboriculture

View all →
Trees and Arboriculture6 min read

Woodland creation on a development site and its upkeep

New woodland is easy to draw and hard to keep alive. The planting design, the establishment regime and the legal mechanism all have to agree with each other.

Read article →
Trees and Arboriculture7 min read

Tree officer site visits and what they inspect

The officer looks at the fence line first. Here is the full checklist, the consequences of an incursion, and the site record that protects you.

Read article →
Trees and Arboriculture7 min read

The five year maintenance condition on new planting

Planting that dies within five years must be replaced in the next planting season. The obligation runs with the land and survives the sale of the house.

Read article →
Trees and Arboriculture7 min read

Tree pits, structural soils and street tree establishment

Street trees fail on soil volume, not species choice. Work backwards from the mature canopy, put the volume on the drawing, and resolve the service corridor first.

Read article →
Trees and Arboriculture7 min read

Tree roots and proximity to a public sewer or drain

Most undertakers control building and planting within around 3m of a public sewer. Resolving that against retained trees is a layout decision, not a condition to discharge later.

Read article →
Trees and Arboriculture8 min read

Ash dieback and what it changes in a tree survey

Infected ash is not automatically a category U tree. How to record crown decline and basal lesions, categorise honestly, and handle protected ash under the 2012 exemption.

Read article →