Templates, Checklists and Examples

Checklist: evidence pack for a bat mitigation licence

6 min readBy PlanScope Editorial Team

A licence application fails on the three tests or on survey effort, rarely on the mitigation design. Here is what each part of the pack has to carry.

A bat mitigation licence evidence pack is assembled to satisfy three statutory tests, not to describe a mitigation scheme. The mitigation design is usually the easiest part. Applications are refused or returned because the survey effort was thin, because the no satisfactory alternative test was answered with a sentence, or because planning permission was not in place in the form the licence requires.

Bats are European protected species, and the licence is issued under the Conservation of Habitats and Species Regulations 2017. Survey work and the licence application require a suitably licensed ecologist, which is a legal requirement rather than a preference, and an AI-assisted draft is a starting point for that ecologist rather than a substitute for them.

What the licence authorises

The licence permits acts that would otherwise be offences, including damaging or destroying a breeding site or resting place, capturing or disturbing bats, and obstructing access to a roost. It is specific to a site, a named ecologist, a method statement and a timetable.

It does not authorise the development. Planning permission does that, and the licensing authority expects a full permission to be in place, with relevant conditions discharged, before it will issue. An outline permission without reserved matters approval generally will not do, because the licence has to be assessed against a development the applicant is actually entitled to build.

Build the licence into the programme as a consequence of permission, not as a parallel activity.

Survey effort expected before an application

The effort has to match the assessed suitability of the structure or tree, following the recognised good practice guidelines for bat surveys. The sequence is a preliminary roost assessment first, which grades the building or tree for its potential to support roosting bats, and then a number of emergence and re-entry surveys proportionate to that grade.

  • Negligible suitability: no further survey, with the reasoning recorded.
  • Low suitability: a single emergence or re-entry survey in the appropriate season.
  • Moderate suitability: two surveys, separated in time.
  • High suitability: three surveys, separated in time.
  • A confirmed roost: further work to characterise the roost type, species and numbers, which may include internal inspection, static detectors or radio tracking.

But timing is the constraint on the programme. Emergence surveys are carried out in the active season, with the central summer months giving the most reliable results, and surveys outside that window are routinely discounted. A preliminary roost assessment can be done at any time of year, so get it done early, because it tells you whether the scheme has a 12-month survey problem or none at all. Order it alongside the Preliminary Ecological Appraisal at the same time as the other baseline work.

The three derogation tests and the evidence for each

Every licence application turns on these, and each needs its own evidence rather than a shared paragraph.

Test What the pack has to show
Purpose That the development is for a permitted purpose, usually imperative reasons of overriding public interest including social or economic reasons
No satisfactory alternative That alternatives were considered and rejected for reasons that stand up
Favourable conservation status That the action will not be detrimental to the maintenance of the population of the species at a favourable conservation status in its natural range

The purpose test is normally evidenced by the planning permission itself, with the officer report and the development plan policies that supported it. Attach them rather than referring to them.

The alternatives test is where applications are weakest. It needs real alternatives considered at the right stage: a different scheme layout, retention of the roost structure, a different construction method, a different phasing, and doing nothing. Each has to be described and rejected for a stated reason. An answer that says the applicant needs to build the approved scheme is not an answer, because the approved scheme is the thing being licensed.

The conservation status test is an ecological judgement about the local population and about the roost's role within it. It depends directly on the survey work, which is why thin survey effort undermines this test as well as the first two.

Method statement and mitigation design

The method statement is the operative part of the licence, and the works have to follow it exactly. It should set out the timing of each operation against the bat calendar, the sequence of soft strip and demolition with hand working where roost features are present, supervision arrangements and who attends each stage, exclusion methods and the period over which they operate, the compensatory roost provision with drawings and specifications, the lighting regime during and after works, and the contingency if a bat is found.

Compensatory provision has to be like for like in function rather than in appearance. A maternity roost in a warm ridge void is not replaced by three bat boxes on a north elevation, and licensing officers know the difference. Roost dimensions, thermal performance, access point size and position, and the materials used all matter, and the Protected Species Survey and roost design should be produced by the same ecologist.

The reasoned statement and the planning requirement

The reasoned statement is the document that ties the pack together and argues the three tests. It should cross-refer to the survey report, the method statement, the drawings and the planning permission, and it should be written for a licensing officer who has not seen the site.

Include the decision notice, the approved plans, and the discharge of any condition that must be settled before works start. Where a condition requires the mitigation scheme to be approved by the planning authority, get that approval first, because a licence issued against an unapproved scheme creates a conflict nobody can resolve on site.

Monitoring commitments

Monitoring is normally a condition of the licence, with a schedule of post-development checks over a period of years, reported back to the licensing authority. The commitment has to be deliverable by someone after the contractor has left, so name the party responsible and secure the funding, usually through the planning obligation or a management company arrangement.

Write the monitoring schedule to produce usable information. A visit that records whether a box is still attached tells nobody anything. A visit timed to the season, recording occupancy, droppings and emergence counts, does.

Timescales and the build programme

Allow for the preliminary assessment at the start of the design stage, the emergence survey season, the planning determination period, the discharge of relevant conditions, and then the licence determination period, which is measured in working weeks rather than days. Where a low impact class licence route is available through a registered consultant, the timescale is shorter, and whether the site qualifies is a judgement for the ecologist.

The failure that costs most is discovering a roost after permission is granted and the contractor is mobilised, because the survey season may be nine months away. A preliminary roost assessment early in the design stage costs little and removes that risk, and the professional directory is the route to an ecologist who can carry out the assessment and later hold the licence.

This is general guidance, not legal advice. Licensing procedures, survey guidelines and determination periods change, so confirm the current requirements with the licensing authority and a licensed ecologist before relying on anything here. For specialist technical reports, qualified professional input may be required.

PlanScope provides AI-assisted draft reports for planning applications. Reports should be reviewed before submission. We do not guarantee planning approval.

Frequently asked questions

Do I need planning permission before applying for a bat licence?

In practice yes. The licensing authority expects a full planning permission to be in place, with relevant conditions discharged, before it will issue a licence, because the three derogation tests are assessed against a development the applicant is entitled to build. An outline permission without reserved matters approval is generally not sufficient.

How many bat surveys are needed before a licence application?

It depends on the suitability grading from the preliminary roost assessment. Low suitability usually needs one emergence or re-entry survey, moderate suitability two, and high suitability three, each separated in time and carried out within the active season. A confirmed roost needs further work to establish species, numbers and roost type.

What is the no satisfactory alternative test asking for?

Evidence that genuine alternatives were considered at the right stage and rejected for stated reasons, including a different layout, retaining the roost structure, a different construction method or phasing, and doing nothing. Saying that the applicant needs to build the approved scheme does not answer it, because the approved scheme is the thing being licensed.

Can bat boxes replace a maternity roost?

Rarely. Compensation has to match the function of the lost roost rather than its appearance, so a warm ridge void used as a maternity roost needs equivalent thermal performance, volume, access and position. Licensing officers assess roost dimensions, materials and access point design, and a few boxes on a cold elevation will not be accepted.

Who can hold a bat mitigation licence?

A suitably licensed ecologist, named on the licence, who takes responsibility for supervising the works against the method statement. This is a legal requirement under the Conservation of Habitats and Species Regulations 2017 rather than a matter of preference, and the same ecologist normally carries out the surveys and designs the compensatory roost provision.

Sources and further reading

batsprotected specieslicenceecologysurvey seasonchecklist

This article is general guidance about the planning system in England and, where stated, the rest of the UK. It is not legal or professional advice. Check your local planning authority’s validation requirements and take professional advice for your specific site.

More in Templates, Checklists and Examples

View all →
Templates, Checklists and Examples7 min read

Checklist for responding to planning objections

An applicant's response to objections is a sorting exercise first. Answer the material points with dimensioned evidence, acknowledge private law issues in one neutral sentence, and offer conditions where you cannot prove a point.

Read article →
Templates, Checklists and Examples6 min read

Checklist for handover of planning documents at completion

The planning file handed over at completion is what a buyer's solicitor asks for years later. Here is the index, and the records that are hardest to recreate.

Read article →
Templates, Checklists and Examples7 min read

Checklist for a tree works application under a TPO

TPO applications are free and decided in eight weeks, but vague descriptions get them refused. Here is the evidence that gets consent granted as proposed.

Read article →
Templates, Checklists and Examples7 min read

Checklist for a demolition prior notification submission

A demolition prior notification is narrow by design. The authority can consider only the method of demolition and the proposed restoration of the site.

Read article →
Templates, Checklists and Examples7 min read

Checklist for a larger home extension prior approval

A single storey rear extension deeper than 3m on a semi, or 4m on a detached house, needs prior approval under Class A. Here are the limits, the information to supply and how the neighbour consultation timetable works.

Read article →
Templates, Checklists and Examples7 min read

Checklist for responding to an invalid application notice

Until an application is validated there is no determination clock. Here is how to sort each item on an invalidity notice, decline requests that are not on the published local list, and protect the validation date.

Read article →