Costs, Fees and Budgeting

CIL and residential extensions over the threshold

7 min readBy PlanScope Editorial Team

The minor development exemption covers under 100 m2 of new floorspace. Above that, a householder exemption exists, but it must be granted and notified before work starts.

A household extension of 100 m² or more of new floorspace is liable for the community infrastructure levy in any area with an adopted charging schedule, and there is an exemption that takes it back to nil. The catch is that the exemption has to be claimed and granted before you start, and you have to tell the council in writing before you begin. Miss either step and the exemption is gone, permanently, with a surcharge on top. This is the part of the levy that catches homeowners, and it catches them after the builders are already on site.

The 100 m² threshold, and what it does not cover

The Community Infrastructure Levy Regulations 2010 exempt minor development, meaning development that creates less than 100 m² of new build gross internal floorspace. Most single storey rear extensions and loft conversions fall under it comfortably and no levy arises.

Two things sit outside that comfort. The threshold is measured on gross internal area of new build floorspace, so a two storey side and rear extension on a modest house reaches 100 m² faster than people expect, and a garage conversion contributes nothing because no new build floorspace is created. Measure it properly before you assume you are under.

The other is that the minor development exemption does not apply where the development creates a new dwelling, whatever its size. A self-contained annex of 45 m² with its own kitchen and bathroom is a new dwelling, and the 100 m² threshold does not help it at all.

The levy only bites where the charging authority has adopted a charging schedule. Rates are set per square metre by the authority and indexed annually, so check the current schedule and index figure for your area rather than a rate someone quoted you last year.

The exemption for a householder extension

Regulation 42B provides an exemption for residential extensions. In outline, you qualify where you own a material interest in the dwelling, you occupy it as your sole or main residence, the works extend that dwelling, and they do not create a new dwelling.

That covers the ordinary case: a family enlarging the house they live in. It does not cover a developer extending a house before sale, a landlord extending a let property, or a second home.

The exemption is not automatic and it is not granted with the planning permission. It is a separate claim, made to the collecting authority on the prescribed form, and it has to be granted in writing before development begins.

Annexes are a different exemption

Regulation 42A deals with residential annexes, and it exists precisely because an annex is a new dwelling and therefore outside the minor development exemption.

The conditions are similar in shape. The annex is within the curtilage of the main dwelling, it is ancillary to it, you own a material interest in the main dwelling and you occupy it as your sole or main residence.

Then there is a tail. For a defined period of three years after the annex is completed, certain events disqualify the exemption and make the levy payable after all. Letting the annex out, or selling it separately from the main house, are the obvious ones. If the plan is to build an annex for a parent now and let it in two years, price the levy in rather than claiming the exemption and hoping.

Claim it, then tell them you are starting

The sequence matters more than the paperwork, and it runs like this.

  1. Submit an assumption of liability form, naming who will pay if the levy becomes payable
  2. Submit the exemption claim on the correct form, and wait for the authority to grant it in writing
  3. Serve the notice required by regulation 67, on Form 6, before you start work, giving the intended start date
  4. Only then begin development

Step three is where householder exemptions are lost. That notice is a short form and it is mandatory. Where no valid notice is served, the authority fixes the start date itself, the exemption is lost, any instalment policy no longer applies and the whole amount becomes due with a surcharge.

There is no discretion to restore an exemption after work has started. That is the harsh part of this regime and it has been tested repeatedly. Diarise it, serve it by email with a delivery receipt, and keep the acknowledgement with the building contract.

Permitted development can still be chargeable

An extension built under permitted development rights, with no planning application at all, can still be liable. Where development is carried out under a general consent and creates 100 m² or more of new build floorspace, a notice of chargeable development has to be submitted to the authority before work starts.

Homeowners almost never know this, and it usually surfaces later, when a solicitor's search on a sale reveals an unpaid liability with accrued surcharges. A large single storey rear and side wrap-around extension, built lawfully under permitted development, is exactly the case where it happens. If you are building 100 m² or more without a planning application, check whether your authority charges the levy and whether a notice is required. Sorting out an unpaid liability years later sits alongside the wider cost of retrospective development in the list of expenses nobody budgets for.

Netting off existing floorspace

Where you demolish part of the house, or convert an existing building, the floorspace of a qualifying existing building can be deducted from the chargeable amount.

The building has to have been in lawful use for a defined minimum period within the three years ending on the day planning permission first permits the chargeable development. A derelict outbuilding that has not been used for a decade will not qualify, which is counter-intuitive to most homeowners, who assume that replacing a building is neutral.

So keep evidence of use. Council tax records, utility bills, insurance, photographs and tenancy agreements all help, and they need to relate to the relevant window rather than to the building's history generally. Set the calculation out on the application drawings, with existing and proposed gross internal areas tabulated floor by floor, and put the same figures in the Planning Statement so the levy officer and the case officer are working from one set of numbers.

Surcharges, reviews and appeals

The regulations provide surcharges for failing to assume liability, failing to serve the start notice, late payment and disqualifying events. They are set out in the regulations and are applied as a matter of course rather than as a discretionary penalty.

Three routes exist if you disagree. A request to the collecting authority to review the calculation of the chargeable amount, which has a short deadline running from the demand notice. An appeal to the Valuation Office Agency on the chargeable amount itself. And appeals to the Planning Inspectorate on surcharges, on a start date fixed by the authority, and on the refusal or withdrawal of an exemption.

All of them are tight on time. Read the demand notice on the day it arrives and note the deadlines, because a valid ground of appeal that is raised late is worth nothing.

Finally, budget the levy as a cash item due when work starts, alongside the other things that land at the same moment, including the utility connection costs in a development budget. It is not spread across the build unless the authority operates an instalment policy and you met your notice obligations. And if a dispute does escalate, the way appeal costs are assessed and paid is worth understanding before you commit to a fight.

This is general guidance, not legal advice. Levy rates, indexation and surcharge amounts change, and the exemption conditions are detailed, so check the position with your collecting authority or a qualified professional before relying on it. PlanScope provides AI-assisted draft reports for planning applications. Reports should be reviewed before submission. We do not guarantee planning approval.

For the drafting side of the budget, see PlanScope pricing: one free report, £50 per report, or Professional for unlimited reports.

Frequently asked questions

Is a house extension liable for the community infrastructure levy?

Only where the charging authority has adopted a charging schedule and the extension creates 100 m2 or more of new build gross internal floorspace, or creates a new dwelling of any size. Below that, the minor development exemption applies. A garage conversion creates no new build floorspace and so contributes nothing.

How do I claim the residential extension exemption?

Submit an assumption of liability form and then the exemption claim on the prescribed form to the collecting authority, and wait for it to be granted in writing. It is not granted with the planning permission and it is not automatic. Then serve the notice required by regulation 67, on Form 6, before starting work.

What happens if I forget to serve the start notice?

The authority fixes the start date itself, the exemption is lost, any instalment policy ceases to apply and the full amount becomes payable with a surcharge. There is no discretion to restore an exemption once work has begun, which is why the notice should be diarised alongside the building contract.

Does an annexe qualify for an exemption?

Regulation 42A provides a residential annexe exemption where the annexe is within the curtilage of the main dwelling, is ancillary to it, and you own a material interest in and occupy that dwelling as your sole or main residence. Letting or selling the annexe separately within three years of completion can trigger repayment.

Can permitted development be liable for the levy?

Yes. Where 100 m2 or more of new build floorspace is created under a general consent, a notice of chargeable development must be served on the authority before work starts. Homeowners rarely know this, and it commonly surfaces years later during a solicitor's search on a sale, with surcharges accrued.

Can I deduct the floorspace I am demolishing?

Only if the existing building was in lawful use for the minimum period within the three years ending on the day planning permission first permits the development. A long-derelict outbuilding will not qualify. Keep council tax records, utility bills and photographs relating to that specific window as evidence.

Sources and further reading

community infrastructure levyextensionsexemptionshouseholderannexebudgeting

This article is general guidance about the planning system in England and, where stated, the rest of the UK. It is not legal or professional advice. Check your local planning authority’s validation requirements and take professional advice for your specific site.

More in Costs, Fees and Budgeting

View all →
Costs, Fees and Budgeting8 min read

Costing a stopping up order for a highway or footpath

Public rights do not lapse through disuse and planning permission does not override them. This covers the section 247 and 257 routes, what objectors actually argue about, and how to keep the order off the critical path.

Read article →
Costs, Fees and Budgeting7 min read

Costing an affordable housing review mechanism

Early and late stage review mechanisms are decided by their definitions, not their headline percentages. This covers the inputs that move the answer, who pays for the review and the caps to secure before signing.

Read article →
Costs, Fees and Budgeting7 min read

Costing an employment land assessment for an allocated site

On an allocated employment site the fee sits in evidence gathering, not analysis. This covers the marketing records councils expect, the suitability tests that decide it, and how to sequence the work.

Read article →
Costs, Fees and Budgeting7 min read

Costing an odour assessment for a kitchen or waste use

The fee for an odour assessment depends on whether the council accepts a qualitative risk based appraisal or expects dispersion modelling. Here is what sits behind each, and how to scope the work before you commission it.

Read article →
Costs, Fees and Budgeting6 min read

Costing a telecommunications compliance declaration for a mast

An ICNIRP declaration is produced by the operator's own radio engineers and closes the health issue. Siting and appearance are the only matters the council can decide on.

Read article →
Costs, Fees and Budgeting6 min read

Costing an equalities impact assessment for a public applicant

The public sector equality duty is continuing, so an equalities impact assessment has to be revisited at every material change. Budgeting for one document is the common mistake.

Read article →