Use Classes and Change of Use

The 280 square metre local shop provision in Class F2

7 min readBy PlanScope Editorial Team

A shop that meets all three limbs of Class F2(a) sits outside Class E and loses its flexibility. How the floorspace, goods and distance conditions are tested.

Class F2(a) of the Use Classes Order catches a narrow and useful category: shops mostly selling essential goods, including food, where the premises do not exceed 280 square metres and there is no other such facility within 1,000 metres. Meet all three limbs and the unit is not in Class E at all. It sits in the protected local community class, which means the free movement between retail, café, office, gym and clinic uses that Class E allows does not apply to it.

For the owner of the last shop in a village that is protection. For anyone buying it with a change of use in mind, it is a trap worth spotting during due diligence.

What Class F2(a) actually covers

The 2020 amendments to the Use Classes Order split the old A1 shops class. Most retail went into the broad Class E. A defined slice of it went into Class F2, the local community class, which also contains halls and meeting places for the local community, outdoor sport and recreation areas, and indoor or outdoor swimming pools and skating rinks.

The shop limb, F2(a), is conditional rather than descriptive. A unit is only in it if the floorspace condition, the goods condition and the distance condition are all satisfied at the relevant time. Fail any one and the shop is an ordinary Class E(a) retail unit with all the flexibility that brings.

That conditionality is unusual in the Order and it is why the class generates so many arguments.

The floorspace and distance conditions

Two hundred and eighty square metres is a small shop. For comparison it is roughly the footprint of a modest convenience store, and it will exclude almost every supermarket including the small-format ones.

The Order refers to the shop's premises not exceeding that area. Measure it properly, on a scaled drawing, and record what has been included: sales floor, stockroom, staff area, chiller plant. Where a unit sits close to the figure, the measurement basis is the first thing a case officer will query, so set out the basis on the drawing rather than leaving it to be inferred.

The distance condition is that there is no other such facility within 1,000 metres of the shop's location. The Order does not define how that distance is measured, and it does not define "such a facility" beyond the class description itself. In practice officers take a straight-line radius, but a walking distance argument is available where a river, a railway or a dual carriageway makes the straight line meaningless. If you are relying on the point either way, plot it on a map and justify the method.

What counts as essential goods

"Mostly selling essential goods, including food" is not further defined, and there is no list.

The sensible reading, and the one officers apply, is groceries and everyday household necessities: food, drink, newspapers, cleaning products, toiletries, basic pharmacy lines, pet food. A post office counter alongside strengthens the case. A shop whose turnover is mostly greeting cards, gifts, vapes or alcohol is not mostly selling essential goods, whatever the sign above the door says.

"Mostly" invites a proportion. The evidence that works is a product mix analysis, by shelf area or by turnover over a representative period, presented as a table. Twelve months of till category data is better than a statement of opinion, and it is the sort of thing a marginal case turns on.

Why the last shop in a village is protected

Putting these shops outside Class E has a direct consequence. Movement between uses within Class E is not development, so a Class E unit can become a café or an office without any application at all. A Class F2(a) shop cannot use that route, because it is not in Class E.

Changing a Class F2(a) shop to another use is therefore development, and generally needs planning permission. Part 3 of Schedule 2 to the General Permitted Development Order has been amended repeatedly since 2020, so check the current consolidated text for any permitted change that applies rather than working from a 2021 summary.

Councils back this up with development plan policy. Most local plans carry a policy resisting the loss of the last shop or community facility in a settlement, typically requiring marketing evidence over a set period at a realistic price before a change of use will be entertained. Some communities add an asset of community value listing under the Localism Act 2011, which triggers a moratorium on disposal rather than blocking a change of use, but which slows a sale and signals local opposition.

Changing out of F2 in practice

Assume you need permission and build the case around the plan policy rather than the use class.

  1. Read the development plan policy on community facilities and note exactly what it requires: a marketing period, an agent's report, evidence of viability, or a sequential exercise.
  2. Market the unit as required, at a price supported by a valuation, and keep every enquiry logged with dates and outcomes.
  3. Commission a viability note if the policy allows a financial test, and expect the council to scrutinise it.
  4. Show what the community retains. A proposal that keeps a post office counter or a click-and-collect point in part of the unit answers the policy far better than one that does not.
  5. Submit a Planning Statement addressing the policy limb by limb, with the marketing evidence appended as a schedule.

Where the replacement use generates cooking smells or plant noise, the environmental health case runs alongside the policy case. Our note on how councils decide what the planning unit is matters here, because a shop with a flat above may be one unit or two, and the answer changes what is being lost.

Evidence when the facts are marginal

Marginal F2(a) cases come up in three situations: at purchase, when a change of use is proposed, and when enforcement follows a change made without permission. The evidence pack is much the same in all three.

Question Evidence that settles it
Floorspace Measured survey drawing with the areas scheduled and the basis stated
Goods mix Till category data or shelf area analysis over twelve months, in a table
Other facility within 1,000 metres Plotted map, each candidate assessed against the class description, distance method explained
Date the position was tested Dated evidence, because a shop opening nearby changes the analysis

That last row is the one people miss. The class depends on facts on the ground, and those facts move. A unit that was F2(a) when the previous owner bought it may be Class E today because a convenience store opened 700 metres away, and the reverse is equally possible when a nearby shop closes.

Where the position carries real money, an application for a certificate of lawful development is the only formal way to have it confirmed, and it costs far less than finding out through an enforcement notice.

Getting the position confirmed before you commit

Do the work before exchange, not after. Ask the seller for the till data and the floor areas, walk the 1,000 metre radius yourself, and look at what the planning history says about the unit.

Residential conversion of the space above the shop is a separate question with its own rules, covered in our note on retail to residential above a shop. If the ground floor stays in retail use, that route can work without touching the F2 question at all.

Enter your postcode on PlanScope to see which reports a change of use application on a small shop is likely to need, or browse all 66 report types by category.

PlanScope provides AI-assisted draft reports for planning applications. Reports should be reviewed before submission. We do not guarantee planning approval. This is general guidance, not legal advice. Check the position with your local planning authority or a qualified professional before relying on it.

Frequently asked questions

What is the difference between Class E(a) and Class F2(a)?

Class E(a) is ordinary retail and sits inside the broad commercial, business and service class, so it can move to a café, office, gym or clinic without an application. Class F2(a) is the protected local shop category and has no such flexibility. A unit falls into F2(a) only if it meets the floorspace, essential goods and 1,000 metre conditions together.

How is the 1,000 metre distance measured?

The Order does not say. Case officers generally apply a straight line radius from the shop, but a walking distance argument is available where a river, railway or major road makes the straight line unrealistic. Whichever method you rely on, plot it on a map, identify every candidate facility and explain why each does or does not count.

What counts as essential goods?

There is no statutory list. Officers read it as groceries and everyday household necessities: food, drink, newspapers, cleaning products, toiletries, basic pharmacy lines and pet food. A shop whose turnover is mostly gifts, cards, vapes or alcohol will struggle. Product mix evidence by shelf area or till category over twelve months is what decides marginal cases.

Can a Class F2 shop change to a café without permission?

Not through the Class E route, because an F2(a) shop is not in Class E and movements within E are only available to uses already in it. Such a change is development and generally needs planning permission, judged against the local plan policy on the loss of community facilities, which usually requires marketing evidence.

Can a shop move between Class E and Class F2 over time?

Yes, because the class depends on the facts. If another essential goods shop opens 700 metres away, the distance condition fails and the unit is an ordinary Class E retail unit. If that shop later closes, the position can flip back. Date your evidence, and use a certificate of lawful development where the answer carries real money.

Sources and further reading

use classesclass f2local shopchange of usevillage shopclass e

This article is general guidance about the planning system in England and, where stated, the rest of the UK. It is not legal or professional advice. Check your local planning authority’s validation requirements and take professional advice for your specific site.

More in Use Classes and Change of Use

View all →
Use Classes and Change of Use7 min read

Co-living schemes and what use class they fall into

Large-scale purpose-built shared living fits no class in the Use Classes Order, so it is sui generis. That shapes room sizes, affordable housing contributions and the conditions on any consent.

Read article →
Use Classes and Change of Use7 min read

Trampoline parks and indoor leisure capacity

Indoor trampoline parks usually sit in Class E(d), so the planning risk moves to restrictive conditions, structure-borne impact noise and the occupancy figure the fire strategy allows.

Read article →
Use Classes and Change of Use7 min read

Crematoria and burial grounds: use class and consents

Neither a crematorium nor a burial ground falls within any use class, so both need planning permission. A crematorium also carries statutory separation distances and an emissions permit, and a burial ground needs a groundwater risk assessment.

Read article →
Use Classes and Change of Use6 min read

Sports and social clubs: Class F2 or sui generis?

A sports and social club can sit in Class F2 as a local community facility, or outside the use classes entirely if the bar becomes the main event. The distinction decides what you can change without permission.

Read article →
Use Classes and Change of Use6 min read

Film and television studios and the use class question

Film and television production is not named in the Use Classes Order, so a studio consent turns on how the primary use is described and how the planning unit is drawn. Sound stages, set workshops and production offices can each fall differently.

Read article →
Use Classes and Change of Use7 min read

Data centres: which use class applies

Classifying a data centre is a matter of fact and degree, and the answer rarely decides the scheme. Grid capacity and plant noise do.

Read article →