The feedback section of a community involvement statement

7 min readBy PlanScope Editorial Team

The feedback section is the part officers quote in a committee report. How to summarise responses without filtering them, and how to show what the scheme changed.

The feedback section is the part of an applicant's statement of community involvement that officers actually read closely. The methods section tells them what you did. The feedback section tells them what people said and what you did about it, and that is the material a case officer can quote in a committee report.

One clarification first, because the term does double duty. A local planning authority has its own statement of community involvement, adopted under section 18 of the Planning and Compulsory Purchase Act 2004, setting out how it will involve the community in plan-making and in decisions. The document discussed here is different: the applicant's own account of pre-application engagement, submitted with a major application because the council's validation list or its adopted policy asks for one.

What the section is assessed on

Officers are looking for three things, and a section that supplies all three rarely attracts criticism.

Whether the consultation reached the people it should have reached, which the methods section establishes and the feedback section demonstrates through the profile of who responded. Whether the responses have been reported accurately rather than filtered. And whether the scheme changed in response, or whether the applicant has explained why it did not.

The third of those carries the most weight. A consultation that produced no change at all invites the conclusion that it was presentational, and officers are direct about saying so in committee reports.

Summarising responses without editing them

The summary should group responses by theme, report each theme in the words respondents used, and give a sense of how frequently each arose. Themes that recur on most schemes include height and massing, overlooking and privacy, parking pressure, traffic and access, construction disruption, loss of a view, drainage and flooding, and the mix of uses proposed.

Two rules keep the section credible.

Report the uncomfortable themes as prominently as the supportive ones. A summary that devotes four paragraphs to positive comments about the landscape strategy and one line to sustained objection on height will be read as advocacy, and the officer will go to the raw feedback forms.

Use the respondents' own framing. If people said the building would "loom over" the terrace behind, report that, then translate it into the planning issue behind it. Sanitising the language into "concerns regarding massing were noted" loses the information that made the comment useful.

Where a comment falls outside planning control, say so plainly and say why. Loss of property value and disruption during construction are the usual examples, and readers deserve a straight explanation rather than silence.

Showing what changed and what did not

The clearest format is a table that pairs each theme with the response, and it is worth building even where the rest of the document is prose.

Theme raised Response in the submitted scheme
Height of the block facing the terrace Upper floor set back by 3 metres along that elevation
Overlooking of rear gardens Windows to the flank replaced with obscure glazed and high level openings
Parking pressure on the adjoining street Car club space added, cycle parking increased, parking permit restriction offered
Construction traffic on the school route Routeing agreed to avoid the school approach at drop-off and collection times
Request to reduce to three storeys Not adopted, for the reasons set out below

That last row is the one to get right. Where a request has not been accepted, give the reason in a sentence or two: the scheme would not be viable, the density is needed to meet the site allocation, the daylight testing showed no material difference, the highway authority objected to the alternative. A refusal to move, explained, reads better than an unexplained silence.

Cross-reference the changes to the drawings and to the design and access statement, with drawing numbers, so that an officer can verify that the change described actually appears in the submitted scheme. Descriptions of changes that the drawings do not show are found, and they damage everything else in the document.

Quantifying responses fairly

Numbers in a consultation report need care, because they are easy to present in a way that flatters.

State the method and the population: how many properties received a leaflet, how many people attended each event, how many feedback forms were returned, how many online responses were received, and over what period. Report the response rate alongside the raw count.

Avoid inferring support from attendance. People who came to an exhibition and said nothing are not supporters, and describing them that way is the single most common overstatement in these documents. Equally, avoid reporting percentages calculated on a small base without giving the base.

Where feedback forms used a scale, report the distribution rather than a single headline. And where the same household submitted several responses, say how duplicates were treated.

Honesty here has a practical payoff. Objectors frequently produce their own count, and a discrepancy between their figure and yours is an easy point for them to make at committee.

Handling organised objection campaigns

Campaigns are a normal part of the process and should be reported as what they are, without disparagement. Record the number of identical or near-identical responses, note that they were part of a coordinated campaign, and address the substance of what they say.

The substance is what matters. The number of objections is not itself a material consideration, and officers will say so in the report, but the planning issues raised are material however many people raise them. A campaign that focuses on highway safety at a junction deserves the same analysis as an individual letter making the same point.

Resist the temptation to characterise the campaign or its organisers. It reads badly, and it hands the objectors a grievance that has nothing to do with the merits of the scheme.

Where a campaign has produced a petition, report the number of signatures, the wording of the petition, and whether signatories were local. Where it has produced factual claims you believe are wrong, correct them with evidence rather than with adjectives.

Appendices that support the summary

The appendices are what make the summary checkable, and a section with no appendices is an assertion.

  • Copies of the leaflets, letters and newspaper notices used, with the distribution area shown on a plan.
  • The exhibition boards as displayed, and the dates, times and venues.
  • The feedback form, so that the questions asked are visible.
  • A tabulated log of responses, anonymised, with the theme coding applied.
  • Correspondence with ward councillors, the parish or town council and any amenity society.
  • Website material and the dates it was available.

Anonymise personal data and remove contact details before submission, because the document goes on the public planning register. That is a straightforward point that gets missed on a surprising number of applications.

Where the section reads as advocacy

The failure mode is a section written by the communications team rather than the planning team. The signals are recognisable: adjectives describing the scheme, quotations selected for approval, "the community welcomed" where the record shows a mixed response, and a conclusion asserting that the proposal enjoys local support.

Write it instead as a factual record with a short analytical conclusion. Say what was done, what was said, what changed, what did not, and why. If the honest conclusion is that local opinion remains divided on height, say that. Officers already know, because they have read the objections on the file.

A statement of community involvement that reports a difficult consultation accurately is more useful to a case officer than one claiming an easy ride, and it is much harder for an objector to attack. Where the scheme raises equalities issues, the same discipline applies to an equalities impact assessment, which draws on the same engagement evidence.

PlanScope drafts statements of community involvement structured to UK planning policy, with your consultation records and response data flagged for you to supply. Browse the report types and start a draft. PlanScope provides AI-assisted draft reports for planning applications. Reports should be reviewed before submission. We do not guarantee planning approval.

Frequently asked questions

Is an applicant's statement of community involvement the same as the council's?

No. A local planning authority adopts its own statement under section 18 of the Planning and Compulsory Purchase Act 2004, setting out how it involves the community in plan-making and decisions. An applicant's statement is a separate document recording pre-application engagement, usually required for major applications by the council's validation list or local plan policy.

What should the feedback section contain?

Responses grouped by theme in the words respondents used, an indication of how often each theme arose, a clear account of what changed in the scheme and what did not with reasons, the numbers behind the consultation with their base, and appendices containing the materials used and an anonymised log of responses.

How should organised objection campaigns be reported?

Factually. Record the number of identical or near-identical responses, note the coordination, and address the substance of the points raised. The number of objections is not itself a material consideration, but the planning issues raised are material regardless of how many people raise them. Avoid characterising the campaign or its organisers.

Can attendance at an exhibition be reported as support?

No, and doing so is the most common overstatement in these documents. People who attended and said nothing are not supporters. Report attendance, feedback forms returned and online responses separately, with the population each is drawn from, so a reader can judge the weight of the numbers themselves.

What goes in the appendices?

The leaflets, letters and notices with the distribution area plotted, the exhibition boards as displayed with dates and venues, the feedback form itself, an anonymised tabulated log of responses with theme coding, correspondence with councillors and the parish or town council, and the website material with the dates it was available.

Sources and further reading

statement of community involvementconsultationpre-applicationengagementmajor applications

This article is general guidance about the planning system in England and, where stated, the rest of the UK. It is not legal or professional advice. Check your local planning authority’s validation requirements and take professional advice for your specific site.

More in Report Deep Dives

View all →
Report Deep Dives7 min read

The sensitivity and magnitude matrix in an LVIA

GLVIA3 supplies a method, not a matrix. How value and susceptibility combine, what magnitude actually contains, and how to report year 1 and year 15 residual effects defensibly.

Read article →
Report Deep Dives7 min read

The ground gas assessment section of a Phase 2 report

Monitoring in settled weather, flow readings at the resolution limit and a characteristic situation with no source behind it are the three failures reviewers see most. What a defensible ground gas section contains.

Read article →
Report Deep Dives7 min read

The background sound survey in a Noise Impact Assessment

The LA90 background sets everything else in a BS 4142 rating. Measurement positions, representative periods, calibration records and the uncertainty a reviewer will look for.

Read article →
Report Deep Dives7 min read

The scope and modules of a Whole Life Carbon Assessment

Upfront, embodied and whole life carbon are three different figures from different module sets. The scope errors that get assessments rejected, and the assumptions that move the result.

Read article →
Report Deep Dives6 min read

The carbon offset and monitoring sections of an Energy Statement

Offsetting deals with what is left after fabric, plant and renewables. The residual calculation, the obligation drafting, the metering strategy and who reports once units are sold.

Read article →
Report Deep Dives6 min read

The sustainable transport section of a Transport Assessment

Trip generation is arithmetic, accessibility is judgement. Isochrones instead of circles, LTN 1/20 route quality, honest bus evidence and measures that can actually be secured.

Read article →