London

Counting cycle parking in a mixed use London block

7 min readBy PlanScope Editorial Team

Policy T5 and Table 10.2 set minimum cycle parking standards per use. In a mixed use block the figures are added, never shared, and long stay cannot be set against short stay.

Cycle parking standards in London are minimums, they are applied use by use, and the totals are added rather than shared. That is the whole method. A mixed use block gets the residential requirement in full, plus the requirement for each commercial use in full, and long stay provision cannot be set against short stay or the other way round. Most of the shortfalls picked up at application stage come from a designer who netted something off.

Policy T5 of the London Plan 2021 carries the requirement, and the numbers sit in Table 10.2 of the Plan.

How the standards are structured

Each land use has its own metric. Residential is counted per dwelling and varies by unit size. Commercial uses are counted per square metre of gross internal area, with different rates for offices, retail, food and drink, leisure, education and industrial uses. Some uses have a stepped short stay rate, where the first tranche of floorspace generates spaces at one rate and anything above it at a lower rate.

For every use there are two separate figures. Long stay is for residents and staff: secure, covered, accessible and intended for cycles left all day or overnight. Short stay is for visitors and customers: close to the entrance, convenient, usually a Sheffield stand on the public side of the door.

Boroughs can and do set higher standards in their own local plans. The London Plan figure is the floor, so check the borough policy before you fix the layout.

Deriving the residential count

The residential long stay standard is one space per studio and one-bedroom dwelling, and two spaces for every other dwelling. Short stay is one space per 40 dwellings.

An illustrative worked example. A block of 60 flats made up of 20 studios and one-bedroom units and 40 two-bedroom and larger units generates 20 plus 80, so 100 long stay spaces. Short stay is 60 divided by 40, which is 1.5 and rounds up to 2.

Round up, always, and round at the level of each use rather than at the end. Two uses each generating 1.4 spaces produce four spaces, not three.

The unit mix therefore drives the store area, and the store area is not small. A hundred spaces at realistic stand spacing is a room of meaningful size with its own access route, and it has to be found in the plan at the same time as the bin store and the plant. Testing capacity without it is how schemes lose a unit at the design stage, which is a theme of our note on the design-led approach to site capacity.

Adding the commercial uses

Take the rate for each commercial use from Table 10.2, apply it to that use's gross internal area, and add the result to the residential figure. Keep long stay and short stay separate throughout.

Three points catch people out.

First, the floorspace measure is gross internal area for the use in question, not the whole building and not net lettable area. Second, a flexible consent covering more than one use class needs the requirement calculated on the use that generates the higher demand, because the condition has to work whichever use arrives. Third, ancillary floorspace counts into the use it serves rather than being excluded.

Where the ground floor is let as a single shell unit with the end use unknown, say in the transport submission which use you have assessed against and why, and show that the store has capacity for the worst case. An officer will accept a reasoned assumption. An officer will not accept a blank.

Long stay and short stay are not interchangeable

This is the error that produces refusals rather than conditions. The two types of provision answer different needs and have different specifications, and a surplus of one does not cure a deficit of the other.

Long stay Short stay
Users Residents, staff Visitors, customers
Location Within the building or curtilage, secure Near the entrance, publicly accessible
Security Controlled access, enclosed, lit Overlooked, lit
Weather Covered Covered where practical
Typical form Sheffield stands or two-tier racks in a dedicated store Sheffield stands

A single large basement store does not provide short stay parking, because a visitor cannot get into it. Equally, a row of stands in the forecourt does not count towards the residential long stay requirement.

Store location, access and gradients

The store has to be usable by someone pushing a loaded bicycle, and that is a planning matter because it affects whether the provision is real.

What the transport officer looks for:

  1. A route from the street to the store that does not involve steps. Ramps need a gradient a person can push a bike up, and a short steep ramp is worse than a longer shallow one.
  2. Doors wide enough to pass a bicycle through without lifting it, held open or on a hold-open device, with level thresholds.
  3. Where a lift is the only route, a lift car long enough for a bicycle plus a person, and enough lift capacity that cyclists are not waiting through a peak.
  4. Ground floor or upper basement location in preference to deep basement.
  5. Lighting, natural surveillance and access control.
  6. A proportion of long stay spaces sized for larger cycles, including adapted cycles, cargo cycles and trailers. Take the current percentage and the space dimensions from the London Plan Guidance rather than from an older project.

Cycle stores and refuse stores compete for the same ground floor frontage, and refuse has its own carry distances to satisfy. Resolving both together is easier than resolving them in sequence, as our note on the Waste Management Strategy explains.

Stand types and the spacing that counts

A space only counts if it is usable. Sheffield stands laid out at the spacing recommended in the London Cycling Design Standards count without argument. Two-tier racks count for long stay, with the caveat that boroughs often expect a proportion of ground-level spaces for users who cannot lift a bike, and that the upper tier needs assisted gas struts and headroom.

Semi-vertical and vertical wall hooks are a harder sell for long stay. They reduce the usable population and some boroughs decline to count them at all. Where you use them, count them separately in the schedule and explain the mix.

Two practical dimensions decide whether a store works: the spacing between stands and the clear aisle behind them. Draw both at a scale where they can be checked, and dimension them on the plan. A store that is dimensionally short will be conditioned for revised details, and the revision usually costs a space or two you had already sold.

Showing compliance on the drawing

Make it impossible for an officer to arrive at a different number. A single schedule, on the drawing rather than buried in the transport note, with one row per use:

  • The use, its quantum, the standard applied, the figure required and the figure provided, for long stay and short stay in separate columns.
  • A reference to Table 10.2 and the borough policy.
  • A plan at a scale that shows stand positions, spacing, aisle widths and the larger cycle spaces.
  • The access route from the public highway marked, with gradients and door widths annotated.

Where the scheme needs a Transport Statement, the cycle parking schedule belongs in it as well as on the drawing, and where the scheme triggers a travel plan, the monitoring commitments should match the numbers you have shown. Our note on the Travel Plan covers how those commitments are secured.

Count the spaces before you fix the core, not after. You can browse the report types by category to see which transport documents the scheme will need alongside the schedule.

This is general guidance, not legal advice. Check the current London Plan table and your borough's adopted policy with the local planning authority or a qualified transport planner before relying on it. PlanScope provides AI-assisted draft reports for planning applications. Reports should be reviewed before submission. We do not guarantee planning approval.

Frequently asked questions

How many cycle spaces does a flat need in London?

The London Plan long stay standard is one space per studio or one-bedroom dwelling and two spaces for every other dwelling, with short stay at one space per 40 dwellings. Boroughs can set higher figures in their own local plans, so check the adopted borough policy as well as the Plan.

Can long stay and short stay provision be combined?

No. They serve different users and have different specifications, and a surplus of one does not make up for a shortfall in the other. A secure basement store cannot provide short stay spaces because visitors cannot reach it, and forecourt stands do not count towards residential long stay.

How is cycle parking calculated for a mixed use building?

Apply each use's own standard to its own metric, dwellings for residential and gross internal area for commercial uses, then add the totals. Round up at the level of each use rather than at the end, and keep long stay and short stay figures separate throughout the calculation.

Do two-tier racks count towards the standard?

Generally yes for long stay, provided the upper tier has assisted struts and adequate headroom. Boroughs commonly expect a proportion of ground-level spaces for users who cannot lift a bicycle. Vertical and semi-vertical hooks are treated more sceptically and some boroughs decline to count them.

What if the commercial unit is a shell with no known occupier?

Assess the requirement against the use that generates the higher demand among those the consent would allow, say so in the transport submission, and show the store has capacity for that case. A reasoned assumption is accepted. Leaving the figure blank invites a condition or a refusal reason.

Does the cycle store have to be at ground floor level?

Not necessarily, but the route has to be usable. Officers look for step-free access, doors wide enough to push a bicycle through, pushable ramp gradients and, where a lift is the only route, a car long enough for a bicycle and a person with enough capacity for peak demand.

Sources and further reading

london plancycle parkingmixed usetransportpolicy t5

This article is general guidance about the planning system in England and, where stated, the rest of the UK. It is not legal or professional advice. Check your local planning authority’s validation requirements and take professional advice for your specific site.

More in London

View all →
London6 min read

Common design tests for basements in London boroughs

Borough basement policies share a short set of numerical tests on depth, extent, garden coverage and soil cover. Knowing them before you design saves a refusal.

Read article →
London7 min read

Drafting a late stage viability review in London

In London a late stage viability review is the price of the viability tested route. The money sits in four definitions: the trigger, the fixed inputs, the surplus and the cap.

Read article →
London7 min read

Fire safety information London boroughs expect at planning

Fire safety in a London application runs on two tracks: London Plan policy D12 for all development, and the national fire statement at Planning Gateway One for relevant buildings. Here is what each asks for and who should write it.

Read article →
London6 min read

Office loss and Article 4 directions in the central zone

In the Central Activities Zone and defined office areas, Class MA has been withdrawn. How to confirm whether a building is affected, and what marketing evidence a borough expects.

Read article →
London6 min read

Evidencing no net loss of industrial floorspace in a SIL

No net loss in a Strategic Industrial Location is tested against capacity rather than the sheds standing today. How to measure, evidence and present the floorspace case.

Read article →
London6 min read

Securing affordable workspace through a planning obligation

A discounted rent on a shell is not workspace. How London affordable workspace obligations are drafted, from the discount definition and fit-out schedule to operator selection and the fallback.

Read article →