Countryside stewardship agreements and planning conditions

7 min readBy PlanScope Editorial Team

Planning permission does not release you from a stewardship agreement. How to evidence an existing agri-environment agreement, amend it before you build, and avoid counting the same habitat twice.

A Countryside Stewardship agreement does not stop you getting planning permission, and planning permission does not release you from the agreement. That is the root of most stewardship agreement planning conflict: two separate contracts over the same field, each with its own map, its own term and its own enforcement route. The Rural Payments Agency polices one on Defra's behalf. Your local planning authority polices the other. Get the sequence wrong and you can find yourself repaying scheme money for a parcel you have just built on, or promising habitat work you are already being paid to do.

Two regimes making promises about the same land

An agri-environment agreement is a contract between the land manager and the Secretary of State. It attaches option codes to mapped land parcels and pays for actions carried out on them, with the parcel boundaries taken from your rural land registration. Countryside Stewardship worked this way, and the schemes that have sat alongside and replaced parts of it follow the same logic of coded actions over mapped areas.

Planning control works on a different axis. Conditions under section 70 of the Town and Country Planning Act 1990 attach to the permission. Obligations under section 106 attach to the land itself and bind successors in title. Neither regime reads the other's paperwork.

So the land can carry two sets of promises drawn on two different maps, held by two bodies that do not talk to each other about your holding. Nobody sends you a warning when they collide.

Where obligations conflict in practice

The commonest collision is the simplest. You put a building, a yard or an access track on a parcel that is entered into an option, and the area under that option shrinks. The agreement is then out of line with what is on the ground, which is a breach until it is corrected, and planning permission is no defence to it.

Access works cause the next tier of problems. A visibility splay at a field gate often needs a length of hedge reduced or removed, which sits badly with a hedgerow management option paid for on the basis that the hedge is cut on a rotation and allowed to thicken. Where the hedge is also an important hedgerow, you have a third consent to think about, and our note on hedgerow removal notices sets out that test.

Watercourse buffer strips are the third. Drainage from a new roof or yard has to go somewhere, and an outfall through a buffer option is both an engineering question and a scheme compliance question. Farm diversification schemes raise the same point whenever a barn is converted and the parking falls on cropped land, which is covered in our piece on workshops and offices on farm holdings.

Additionality and why it matters for net gain

Mandatory biodiversity net gain under the Environment Act 2021 applies to most major development from 12 February 2024 and most small sites from 2 April 2024. The scheme is a 10 per cent uplift measured with the statutory biodiversity metric, secured for 30 years, and set out in a biodiversity gain plan the local planning authority has to approve before development starts.

Here is the part that surprises farmers. The metric baseline is the habitat on the ground, so grassland you have already improved under a stewardship option is scored at its current condition. It has already delivered its gain to the scheme, and it cannot deliver that same gain again to the planning system.

Defra guidance also sets rules against double funding, meaning you cannot draw public money for an action and count the same action as your net gain. Check the current position before you build a strategy around it, because this is one of the parts of the regime that has been refined more than once. A Biodiversity Net Gain Assessment has to be prepared by a competent person under the Environment Act regime, and the biodiversity gain plan is approved by the council rather than by you, so treat any draft as a starting point for that person.

Term lengths and the mismatch with planning

Agreement terms and planning terms rarely line up, and the gap is where the risk sits.

Commitment Typical term Secured by Enforced by
Countryside Stewardship option Five years, longer for some higher tier and woodland options Scheme agreement with the RPA Rural Payments Agency, by payment reduction or recovery
Biodiversity net gain 30 years Section 106 obligation or conservation covenant Local planning authority, or the responsible body
Landscape or ecology condition Usually the life of the development Planning condition Local planning authority, by enforcement notice

Read your own agreement rather than the table. Terms vary by tier and by option, and some woodland and legacy agreements run far longer than five years.

The practical consequence is that a 30-year net gain commitment will outlive the agri-environment agreement sitting under it. Plan for the moment the scheme payments stop and the planning obligation carries on.

Evidencing existing agreements in an application

Councils will not know about your agreement unless you tell them, and an ecologist who does not know about it will mis-score the baseline. Put the following in front of the case officer at validation:

  1. The agreement number, its start and end dates, and the tier or scheme name.
  2. The option codes and the areas they cover, in hectares or metres of feature.
  3. An agreement map extract showing parcel identifiers, overlaid on the red line and blue line of the application.
  4. A short statement of which options the development affects and which it leaves alone.

The ecological survey should pick this up as a matter of course. A Preliminary Ecological Appraisal that records mapped options as part of the baseline saves an argument later, and the Planning Statement is the right place to set out how the two regimes are being reconciled. Where the development takes best and most versatile land out of production, an Agricultural Land Classification survey answers a separate policy question about soil quality, and the two pieces of evidence are often read together.

Amending an agreement to accommodate development

Ask the Rural Payments Agency about an amendment before you build, not after. Agreements have routes for changing mapped areas, removing land from the agreement or transferring it to a new occupier, and the request has to come from you.

Two sequencing errors cause most of the damage. The first is starting works in reliance on a permission while the agreement still shows an option over the footprint. The second is assuming the amendment can be processed inside the eight weeks a minor application takes, which is not a safe assumption for any scheme administration.

There is honest uncertainty about how long an amendment takes in any given year, and it depends on scheme and timing. Build slack into the programme rather than a fixed date.

Recording commitments so both regimes are satisfied

Keep one drawing that carries both sets of lines. Agreement options in one colour, planning obligations and conditioned habitat in another, with a schedule against each area saying which body enforces it, for how long, and who does the work. It sounds like housekeeping. It is the document that stops a future land agent, ecologist or buyer from selling the same hectare twice.

As an illustrative example, take a holding with a mid-tier agreement including a winter bird food option across two arable parcels, where the owner wants a 400 m2 building and a hardstanding on the corner of one parcel. The area under the option falls, so the agreement needs amending. The metric baseline for that corner is arable rather than the enhanced margin next to it, so the net gain has to come from somewhere the option does not already cover. And the new habitat, once secured for 30 years, cannot be re-entered into a scheme option that pays for the same action. Figures here are illustrative and not drawn from a real agreement.

This is general guidance rather than legal advice. Check your own agreement terms and the current scheme rules with the Rural Payments Agency, and check the planning position with your local planning authority or a qualified professional before relying on any of it.

Ready to see what a rural application needs? Enter your postcode on PlanScope to see which reports your site is likely to need. PlanScope provides AI-assisted draft reports for planning applications. Reports should be reviewed before submission. We do not guarantee planning approval.

Frequently asked questions

Does planning permission override a Countryside Stewardship agreement?

No. The two are separate. Planning permission is a public law consent from the council, while a stewardship agreement is a contract with the Secretary of State administered by the Rural Payments Agency. Building on a parcel entered into an option puts the agreement out of line with the ground, and that has to be corrected through the scheme's own amendment route rather than by relying on the permission.

Can habitat created under a stewardship option count as biodiversity net gain?

Generally not as new gain. The statutory metric scores the habitat that is actually on the ground at the baseline date, so land already improved under an option is measured in its improved condition. Defra guidance also restricts drawing public money for an action and counting the same action as net gain. Check the current double funding rules before you plan around it.

How long does a biodiversity net gain commitment last on farmland?

Thirty years from completion of the habitat works, secured through a section 106 planning obligation or a conservation covenant with a responsible body. That is longer than most agri-environment agreements, so the land will still carry the planning commitment after scheme payments stop. Factor the management and monitoring cost into the whole 30-year period, not the first five.

What should I give the council about my existing agreement?

The agreement number, scheme or tier name, start and end dates, the option codes with their areas, and a map extract showing parcel identifiers against your red line. Add a short note saying which options the development affects. Without it, the ecologist scores the baseline wrongly and the case officer has no way of knowing the land is already committed.

Do I need to amend my agreement before or after I start building?

Before. The request has to come from you, and the routes cover changing mapped areas, removing land or transferring it to a new occupier. Starting works while the agreement still shows an option over the footprint leaves you exposed to payment reduction or recovery for that parcel. Allow far more time than a planning determination period.

Sources and further reading

countryside stewardshipbiodiversity net gainsection 106farmlandagri-environment

This article is general guidance about the planning system in England and, where stated, the rest of the UK. It is not legal or professional advice. Check your local planning authority’s validation requirements and take professional advice for your specific site.

More in Rural and Agricultural

View all →
Rural and Agricultural7 min read

Succession, tenancies and who applies for permission

Planning permission runs with the land, so a tenant, a landlord or a promoter can all apply over the same field. The safeguard is the ownership certificate and the 21 day notice to agricultural tenants.

Read article →
Rural and Agricultural8 min read

Redundant farm buildings and the demolition question

Most standalone agricultural buildings can be demolished without a planning application, yet demolition removes any later conversion right and brings asbestos, ecology and restoration duties with it.

Read article →
Rural and Agricultural7 min read

Diversifying into events in a working farmyard

Part 4 of the General Permitted Development Order allows 28 days of temporary use a year on land, but excludes buildings and anything inside a curtilage. Where that leaves farm events, and the evidence a permanent consent needs.

Read article →
Rural and Agricultural8 min read

Visibility splays onto a rural lane

A speed survey comes before the drawing. How visibility splays are derived on an unclassified lane, how to measure them, and the land control problem nobody plans for.

Read article →
Rural and Agricultural7 min read

Re-using a rural building in the Green Belt

Two limbs decide a Green Belt conversion: permanent and substantial construction, and preserving openness. Most applications satisfy the first and lose on the curtilage.

Read article →
Rural and Agricultural7 min read

Livestock buildings and the distance to housing

The only fixed figure is the 400 metre permitted development limit. Beyond that, odour modelling, ventilation design and manure management decide what separation is acceptable.

Read article →