Crematoria and the two hundred yard rule

7 min readBy PlanScope Editorial Team

A statutory siting rule from 1902 still decides where a crematorium can go. Here is how it works alongside planning permission, emissions control and the parking case.

Section 5 of the Cremation Act 1902 still governs where a crematorium may be built. No crematorium may be constructed nearer than 200 yards to a dwelling-house, except with the written consent of the owner, lessee and occupier of that house, nor within 50 yards of a public highway, nor in the consecrated part of a burial authority's burial ground.

That restriction is statutory and separate from planning permission. A site can be allocated, acceptable in policy terms and supported by the case officer, and the scheme will still be unbuildable if a cottage sits 180 yards from the proposed cremator building and its owner will not sign.

Where the separation requirement comes from

The 1902 Act was passed to put cremation on a lawful footing and to reassure the public about the proximity of the new buildings. Its siting rule has survived largely intact, amended since, and it is enforced as a free-standing prohibition rather than as a planning consideration.

Two features catch people out. The distances are expressed in yards, which is roughly 183 metres and 46 metres respectively, so a plan scaled in metres needs converting carefully at the margin. And the restriction attaches to the crematorium, which is the building fitted with appliances for the burning of human remains, rather than to the whole site. Car parks, gardens of remembrance and the chapel of rest are not caught by it in the same way.

Read the current text of the Act on legislation.gov.uk before you rely on any measurement, and take advice on what part of your building the prohibition attaches to. This is general guidance, not legal advice.

Measuring to a dwelling-house and to a highway

The measurement runs from the crematorium to the dwelling-house. A dwelling-house for these purposes is an occupied home, and the question of whether a farm building with a residential caravan beside it counts is exactly the kind of point that is argued.

Practical steps at site selection:

  1. Plot a 200 yard ring from the likely cremator position, not from the site boundary, and a 50 yard ring from the edge of any public highway.
  2. Identify every dwelling inside the first ring on the Ordnance Survey base, then verify occupation on the ground rather than from the map.
  3. Check whether any highway inside the second ring is public, which means checking the definitive map and the list of streets, because an access track that looks private may be a highway maintainable at public expense.
  4. Test whether the cremator building can be moved within the site to clear both rings before you consider consents.

Moving the building is almost always faster and less costly than collecting consents. An owner, a lessee and an occupier of a single house may be three different people, and all three must sign.

Where the distance cannot be achieved, written consent from the owner, lessee and occupier of each affected dwelling is the statutory escape route. It has to be in writing and it has to cover all three interests.

Consent is a private agreement, so it can be bought, and it is frequently refused by the neighbour who least wants the development. It also raises a question no one enjoys: a consent given by today's occupier does not bind a future one in the way a planning permission runs with the land, and the safe course is to take advice on how the consent is framed and registered before paying for it.

Do not treat consents as a formality to be collected after permission. Resolve them first. A permission for a crematorium that cannot lawfully be built is worth nothing.

How the statutory rule sits alongside planning

Planning permission is required separately, and a crematorium is sui generis under the Town and Country Planning (Use Classes) Order 1987, so there is no permitted change into or out of it.

The planning issues are the familiar ones for a quiet, traffic-generating, emissions-producing use in a semi-rural setting: landscape and visual impact, highway safety and capacity, noise from traffic and plant, air quality, ecology and biodiversity net gain, drainage, and the effect on the character of the area. Many candidate sites sit in the Green Belt, where a crematorium building is normally inappropriate development even though cemeteries and burial grounds are treated more leniently, and the case then turns on very special circumstances. Getting the openness evidence right is the difference between a refusal and a defensible case.

A Planning Statement should deal with the section 5 position head on, stating the measured distances and confirming compliance. Officers who have not handled a crematorium before will not know to ask, and a committee report that is silent on it is a weakness on appeal.

Emissions, stack height and abatement

Cremators are a Part B activity regulated by the local authority under the Environmental Permitting (England and Wales) Regulations 2016, and Defra publishes process guidance for the sector covering emission limits, stack height and monitoring.

Two points shape the building. Mercury abatement from dental amalgam is the driver for filtration plant, which needs floor area and headroom next to the cremators. And the required stack height is derived from a dispersion calculation rather than chosen for appearance, which means the chimney may be taller than the design wants.

An Air Quality Assessment supports the planning application and should model the stack against sensitive receptors, including any dwelling whose consent you are also seeking. Councils expect a suitably qualified author for this work and professional review is strongly advised. Run the permit conversation with the environmental health team in parallel with the planning application, because the stack height agreed under the permit has to match the one drawn on the approved elevations.

Traffic, parking and the timetable of a service day

Crematoria generate short, sharp peaks. Operators usually programme services at intervals of 45 minutes to an hour, which means two congregations are on site at the changeover, one arriving and one leaving, with a cortege moving through both.

The parking case therefore has to be built on overlapping services rather than on a single event. A layout that works on average fails at 11am on a Tuesday. Expect the highway authority to ask for:

  • A one-way internal circulation that separates the cortege route from general parking.
  • Sufficient spaces for two services plus staff, with an overflow area on a bound surface.
  • Waiting space for hearses and limousines clear of the public highway.
  • A safe pedestrian route from the far end of the car park to the chapel.

A Transport Assessment is the right vehicle for this, using observed arrival profiles from comparable facilities rather than generic trip rates, and it should be prepared by a transport planner.

Illustrative example. A proposed single-chapel crematorium on the edge of a market town clears the 50 yard highway line comfortably but sits 190 yards from a farmhouse. Rotating the building 30 degrees and shifting it 20 metres north takes the cremator hall to 215 yards, at the cost of a longer access drive and the loss of four parking spaces. The applicant takes the drive. The figures are illustrative.

The application pack

Alongside the drawings, expect the authority to want a planning statement dealing with section 5 and with Green Belt policy if relevant, a design and access statement, landscape and visual assessment with winter views, an air quality assessment with stack modelling, a noise assessment covering plant and traffic, a transport assessment and parking layout, an ecology appraisal with a biodiversity net gain position, a drainage strategy, and an arboricultural survey where mature trees are affected.

Add one document that is often missed: a written note on the section 5 distances with a scaled plan showing the rings and the consents held. Put it in at validation, not at committee.

This is general guidance, not legal advice. Check the position with your local planning authority or a qualified professional before relying on it.

Enter your postcode on PlanScope to see which reports a crematorium site is likely to need.

PlanScope provides AI-assisted draft reports for planning applications. Reports should be reviewed before submission. We do not guarantee planning approval.

Frequently asked questions

What is the two hundred yard rule for crematoria?

Section 5 of the Cremation Act 1902 prevents a crematorium being constructed nearer than 200 yards to a dwelling-house without the written consent of its owner, lessee and occupier. The same section bars construction within 50 yards of a public highway and in the consecrated part of a burial authority's burial ground. It operates separately from planning permission.

Does planning permission override the Cremation Act restriction?

No. The two regimes are independent, and a grant of planning permission does not authorise construction that the 1902 Act prohibits. A scheme can be entirely acceptable in policy terms and still be unbuildable. Deal with the statutory distances at site selection rather than discovering the problem after a resolution to grant.

Who has to consent if a dwelling is too close?

The Act requires written consent from the owner, the lessee and the occupier of the dwelling-house concerned. Those can be three different people for one property, and every one of them must sign. Take advice on how the consent is framed and recorded, because a permission runs with the land in a way a private consent may not.

Is a crematorium in a use class?

A crematorium is sui generis under the Use Classes Order, so it falls outside every class and there is no permitted change into it or out of it. Any change of use to or from a crematorium needs a full planning application, and the same applies to associated uses such as a chapel of rest operating independently.

What environmental controls apply to the cremators themselves?

Cremators are a Part B activity permitted by the local authority under the Environmental Permitting (England and Wales) Regulations 2016, with Defra process guidance setting emission limits, monitoring and stack height. Mercury abatement drives the plant layout, and the stack height comes from a dispersion calculation, so the permit and the planning elevations have to agree.

Sources and further reading

crematoriumcremation actsitingsui generisair qualitygreen belt

This article is general guidance about the planning system in England and, where stated, the rest of the UK. It is not legal or professional advice. Check your local planning authority’s validation requirements and take professional advice for your specific site.

More in Constraints and Designations

View all →
Constraints and Designations7 min read

Nominating a building to a local heritage list

A locally listed building is a non-designated heritage asset, so applications affecting it attract a balanced judgement. What a nomination needs and what the listing does not do.

Read article →
Constraints and Designations7 min read

Veteran tree identification and who can confirm it

Ancient and veteran trees are irreplaceable habitats in national policy whether or not they are mapped or covered by a Tree Preservation Order. How status is established and challenged.

Read article →
Constraints and Designations7 min read

Policies map notations that are not designations

Regulation 9 of the 2012 Local Planning Regulations makes the policies map an illustration of policy, not a free-standing instrument. How to tell a designation from an indicative annotation.

Read article →
Constraints and Designations7 min read

When a conservation area appraisal is out of date

Conservation area appraisals carry no statutory review interval, so many predate the current local plan. What weight an old appraisal holds, and how to test a description that no longer matches the street.

Read article →
Constraints and Designations7 min read

Plantation on an ancient woodland site and its protection

A plantation on an ancient woodland site is still ancient woodland, because the designation attaches to soil continuity rather than to the trees standing on it.

Read article →
Constraints and Designations7 min read

A designations checklist before exchanging contracts

Standard searches cover local land charges, not environmental designations. The constraints that stop a self-build plot being developable usually have to be looked up directly.

Read article →