Diffusion tube monitoring and the twelve month question

6 min readBy PlanScope Editorial Team

Twelve months of diffusion tube data removes the argument. Less than that needs annualisation, and which months you cover matters as much as how many.

If your scheme needs baseline air quality data and the nearest council monitor is three streets away behind a building line, you will end up running diffusion tubes. The question that then decides the budget is how long they run for, and the honest answer is that a full calendar year is the gold standard and almost nobody has one.

Nitrogen dioxide diffusion tubes are passive samplers exposed for roughly a month at a time, sent to a laboratory and reported as a monthly mean. String twelve of those together and you have an annual mean to compare against the objective. Run them for three months and you have something that needs adjusting before anyone will accept it.

When site specific monitoring is needed

Not every scheme needs its own data. Start by establishing what already exists, because local authority monitoring is free and already bias adjusted.

Site specific monitoring becomes necessary when the existing monitors are not representative of the receptors that matter: wrong side of the road, different canyon geometry, different distance from the kerb, or simply too far away. It also becomes necessary where the authority's network has thinned out, which has happened in areas where an air quality management area was revoked and monitoring was scaled back with it.

A third trigger is dispute. Where a scheme is contentious and the modelling is doing a lot of work, local measured data strengthens the case in a way that a verified model alone does not.

Diffusion tubes and what they cannot do

Tubes are inexpensive, need no power and can be sited almost anywhere, which is why they are used in their thousands. Their limitations are equally well known.

  • They measure nitrogen dioxide only. Particulate matter needs a different technique entirely.
  • They give a monthly mean, so they say nothing about short-term peaks or the hourly objective.
  • They over-read, systematically, and the amount varies by laboratory and preparation method.
  • They are vulnerable to being removed, obscured by vegetation or affected by shelter.
  • A single month's result tells you very little on its own.

The over-reading is the important one, because it is why raw tube data is never presented as a result. A correction has to be applied before the numbers mean anything.

Bias adjustment and co-location

Bias adjustment is the correction applied to raw diffusion tube data to bring it into line with a reference method. The factor is derived by co-locating tubes with an automatic analyser and comparing the results over a period, and national bias adjustment factors are published and updated for each laboratory and preparation method.

Two routes are available. Use the published national factor for your laboratory and method, which is the normal approach and is accepted almost everywhere. Or run your own co-location study alongside a reference analyser, which is better evidence but requires access to an analyser and a long enough overlap period to be meaningful.

For most planning applications the published factor is sufficient. Where it is not, the reason is usually that the local authority's own network uses a different laboratory and the consultee wants consistency. Ask the environmental health officer which laboratory and preparation method they want before you order the tubes, not after the first month's results come back.

Using council monitoring data instead

Local authorities carry out review and assessment work under the local air quality management regime and publish annual status reports containing their monitoring results, bias adjusted and often distance corrected. That data is the first place to look and frequently the last.

What it gives you is several years of record, ratified results, a known bias adjustment, and the authority's own interpretation of the trend. What it may not give you is a monitor near your receptors.

Distance correction can bridge part of that gap. Where a monitor sits closer to the kerb than the proposed receptors, concentrations can be adjusted to the receptor distance using published methods, and the adjustment is accepted where the geometry is comparable. It is not accepted where the monitor is in a street canyon and the site is not.

Start the conversation with the environmental health team early. They usually know their own network's weaknesses and will say which monitor they consider representative.

Period of record and the annualisation question

Twelve months of data removes the argument. Anything less needs annualisation, which is the process of scaling a short record to an estimated annual mean using data from nearby long-running monitors that cover the same period.

Annualisation is an accepted technique with published methodology, and it is used constantly. Its reliability depends on having suitable reference sites with a full year of data over the same period, and on the short record covering a representative spread of months rather than only the summer.

Three months is generally treated as the practical minimum for annualisation, six months is more comfortable, and nine or more rarely attracts argument. What matters as much as the length is which months. A record covering June to August alone will be challenged whatever the arithmetic says, because concentrations vary seasonally and the summer is the low period.

Record length Usual acceptability What it needs
One or two months Rarely accepted Nothing rescues it
Three months Accepted with annualisation Suitable reference sites, representative months
Six months Generally accepted Annualisation, spread across seasons
Twelve months Accepted directly Bias adjustment only

Where modelling replaces monitoring

Dispersion modelling produces concentrations at the receptors you care about, including receptors that do not exist yet, which monitoring cannot do. The two are complements rather than alternatives: monitoring verifies the model, and the model extends the monitoring to the places and years that matter.

On many schemes the sensible answer is a verified model with a short monitoring campaign supporting the verification, rather than a long monitoring campaign on its own. That usually costs less and answers more questions, particularly where the assessment has to cover a future year with committed traffic growth.

Where an assessment is needed at all, it belongs in an Air Quality Assessment prepared by someone competent in the field. Councils expect a suitably qualified author for this work and professional review is strongly advised, because the method choices are contestable and the consultee reviewing it will be an environmental health practitioner.

Planning the spend early

The cost drivers are the number of locations, the number of months, the laboratory analysis, the site visits to change tubes, and any co-location study. Of those, months and locations are the ones you control.

The mistake that costs most is starting late. A scheme that decides in March that it needs six months of data has pushed its submission to the autumn, and the delay costs far more than the monitoring. Deciding in the autumn to start monitoring over the winter gets you the high-concentration months and a submission in the spring.

Treat the decision the same way you treat ecology windows. Both are calendar-bound, both are unrecoverable if missed, and both should be settled at the same point in the programme. The reasoning set out in survey seasons and the cost of missing an ecology window applies almost unchanged to air quality baselines.

The practical sequence is to check the authority's published data first, speak to environmental health second, decide between modelling and monitoring third, and only then order tubes.

This is general guidance, not legal advice. Check the position with your local planning authority or a qualified professional before relying on it. For specialist technical reports, qualified professional input may be required.

See PlanScope pricing if you are costing the supporting documents alongside the monitoring programme.

PlanScope provides AI-assisted draft reports for planning applications. Reports should be reviewed before submission. We do not guarantee planning approval.

Frequently asked questions

Do I always need my own air quality monitoring?

No. Local authority monitoring published in annual status reports is free, ratified and already bias adjusted, and it is often sufficient. Site specific monitoring becomes necessary when the existing monitors are not representative of your receptors, when the authority's network has thinned out, or where a contentious scheme needs local measured data to support the modelling.

What is bias adjustment?

Diffusion tubes systematically over-read nitrogen dioxide, and the amount varies by laboratory and preparation method. Bias adjustment corrects the raw data towards a reference method. National factors are published for each laboratory and method and are accepted almost everywhere. A local co-location study against an automatic analyser is better evidence but needs analyser access.

How many months of diffusion tube data are needed?

Twelve months removes any argument. Three months is generally treated as the practical minimum, provided the record is annualised using suitable nearby long-running monitors, six months is more comfortable and nine or more rarely attracts challenge. Which months you cover matters too, because a summer-only record understates annual concentrations.

What is annualisation?

Scaling a short monitoring record to an estimated annual mean using data from nearby monitors that ran for the full year over the same period. The method is published and widely used. Its reliability depends on having suitable reference sites and on the short record spanning a representative spread of months rather than a single season.

Can modelling replace monitoring?

Partly. Dispersion modelling gives concentrations at receptors that do not yet exist and in future assessment years, which monitoring cannot do. Monitoring verifies the model. On many schemes a verified model supported by a short monitoring campaign costs less and answers more than a long monitoring campaign on its own.

Sources and further reading

air qualitymonitoringnitrogen dioxidebaseline databudgeting

This article is general guidance about the planning system in England and, where stated, the rest of the UK. It is not legal or professional advice. Check your local planning authority’s validation requirements and take professional advice for your specific site.

More in Costs, Fees and Budgeting

View all →
Costs, Fees and Budgeting7 min read

Heritage budgeting: desk assessment against intrusive recording

Heritage spend splits between desk-based analysis and intrusive recording or evaluation. The recording level and the post-excavation assumption decide what the client actually pays.

Read article →
Costs, Fees and Budgeting7 min read

Budgeting a transport evidence base by scheme size

The transport evidence base scales in steps. Work out which document the authority requires before commissioning surveys, and order the low cost work so it de-risks the expensive work.

Read article →
Costs, Fees and Budgeting7 min read

Budgeting an ecology package across the survey seasons

Ecology cost is driven by which month you start, not by day rates. Commission the appraisal in autumn, book spring survey slots, and price a second season as a named line.

Read article →
Costs, Fees and Budgeting8 min read

What an appeal actually costs beyond the Inspectorate

No fee is payable to lodge an appeal in England, so the budget is professional time, expert evidence and months of delay. The step from written representations to an inquiry is not incremental.

Read article →
Costs, Fees and Budgeting8 min read

How a community infrastructure levy charging schedule works

Levy liability is arithmetic rather than negotiation. The money is won or lost on the floorspace measurement, the in-use building offset and the order in which the forms are submitted.

Read article →
Costs, Fees and Budgeting7 min read

Resubmission fee exemptions and whether one applies to you

The repeat application fee exemption in the 2012 Fees Regulations was removed for applications made on or after 6 December 2023. Other exemptions survive, including the Article 4 one, and they are routinely missed.

Read article →