Which Reports Do I Need

Documents for a boarding kennels or dog day care

7 min readBy PlanScope Editorial Team

Boarding kennels and dog day care fall outside every use class, so full permission is needed. Barking noise, washdown effluent and drop-off peaks decide the application.

Boarding kennels and dog day care sit outside every use class, which means a change of use needs full planning permission and there is no permitted development route to fall back on. The kennels planning documents that councils actually read are a noise assessment, a drainage and effluent solution, a transport statement covering drop-off peaks, and a management plan tying down hours, dog numbers and exercise arrangements. Everything else is supporting detail. Barking is the reason most of these applications get refused, so that is where the evidence budget should go.

Which use class kennels fall into

Neither boarding kennels nor commercial dog day care appears in the Town and Country Planning (Use Classes) Order 1987 as amended. Both are treated as sui generis, a use in a class of its own, so no change within a class and no prior approval route is available.

That has two consequences. Any move from agricultural, Class E or residential use to kennels is a material change of use requiring a full application. And once permission exists, a later shift from overnight boarding to daytime-only care, or the other way, may itself need permission because the character of the use changes.

Home-based operations are the grey area. A person looking after two or three dogs in their own house alongside normal residential use may be within the primary residential use, but once the numbers, the visitor movements and the barking become the dominant activity, there is a material change of use. The only formal way to confirm the position is a lawful development certificate under section 191 or 192 of the Town and Country Planning Act 1990.

Barking noise assessment and the method used

Expect the authority's environmental health team to drive the decision. A Noise Impact Assessment for kennels has to do more than measure background sound and compare a specific sound level.

BS 4142:2014+A1:2019 gives the framework used for commercial and industrial sound, and most acousticians apply it here, but barking is intermittent, tonal and impulsive, which means the character corrections matter more than the raw arithmetic. A rating level that looks acceptable on paper can still be judged unacceptable when the character of the sound is what neighbours complain about.

A sound assessment that stands up usually contains:

  1. Background sound monitoring at the nearest noise-sensitive facades, over a period long enough to capture quiet evening and early-morning conditions.
  2. Source data for barking, either measured at a comparable operating facility or taken from published source levels, with the number of dogs and the assumed proportion barking stated openly.
  3. A prediction at each receptor for daytime and night-time, with character corrections applied and justified.
  4. Internal levels inside neighbouring habitable rooms, assessed against BS 8233:2014 guideline values, because that is the test a complaint will eventually be measured against.
  5. The attenuation the design relies on, specified as construction build-ups rather than as an aspiration.

Councils often apply a local separation guideline between kennels and the nearest dwelling. Treat that as a screening filter, not an answer. Distance alone has never persuaded an environmental health officer who has read a weak assessment, and a well-designed building close in has been accepted where a poorly designed one further out was refused.

Separation distance and building design

The design move that resolves most objections is simple to state and expensive to deliver: keep the dogs inside a sealed, acoustically treated building, with mechanically ventilated kennel runs, lobbied entrances so no door opens directly outwards, and no overnight outdoor kennelling at all.

Beyond that, the details that get examined are the roof and wall build-ups and their sound reduction performance, whether internal runs are separated so dogs cannot see each other through the length of the building, the orientation of any openings away from dwellings, and the position and surfacing of exercise yards.

Exercise areas are the weak point of an otherwise good scheme. An outdoor paddock used in rotation through the day is usually acceptable with a management plan limiting group sizes and the hours of use. An unmanaged open yard with 30 dogs in it is not.

Drainage, waste and washdown water

Kennel washdown produces a continuous flow of water carrying faecal matter, hair and disinfectant. It cannot go to a surface water drain or a soakaway.

Where a public foul sewer is available, the discharge is likely to need a trade effluent consent from the sewerage undertaker under the Water Industry Act 1991, separately from planning permission, and the undertaker will want flow rates and an indication of the chemicals used. Where there is no sewer, the options are a package treatment plant with an environmental permit or a sealed tank emptied under contract, both of which need to be costed before the application rather than after. Sites in groundwater-sensitive locations face a tighter constraint still, which is the point covered in the guide to documents for a scheme in a source protection zone.

Solid waste is controlled waste, so the duty of care under section 34 of the Environmental Protection Act 1990 applies, with transfer notes and a registered carrier. Set out the storage location, the container type and the collection frequency in the management plan.

If the site is crossed by a public sewer, the building and the yard layout have to respect the undertaker's easement, which is a separate constraint set out in the guide to documents for a site crossed by a public sewer.

Parking and drop-off traffic

Day care generates a traffic pattern unlike boarding. Drop-off clusters into the morning commute and collection into the evening, so a facility with 40 dogs can produce 80 vehicle movements in two short windows on a quiet rural lane.

Operation Trip pattern Evidence usually expected
Overnight boarding only Low frequency, weekend and holiday peaks Parking layout, visibility splays, staff numbers
Day care Twice-daily sharp peaks tied to commuting Transport statement with peak-hour arrival profile and on-site queuing
Mixed boarding and day care Both patterns combined Transport statement plus a management plan staggering arrival slots

Show the on-site turning and the number of spaces available for simultaneous drop-offs, because the objection from the highway authority is almost always about vehicles waiting on the carriageway rather than about total trip numbers. Staggered booking slots written into a management plan are a low-cost and effective mitigation.

Hours of operation and exercise areas

Conditions on this kind of permission are detailed, and it pays to propose them yourself. Offer a dog number cap, opening hours for drop-off and collection, hours during which outdoor exercise areas may be used, a requirement that dogs are housed internally outside those hours, and an acoustic specification tied to the submitted assessment.

Proposing your own conditions does two things. It shows the officer the operation has been thought through, and it keeps the wording workable rather than leaving it to be drafted at the last minute from a standard library.

One honest uncertainty: authorities differ widely on night-time arrangements, and a condition requiring no barking audible at the boundary is unenforceable in practice even though it still occasionally appears. Push for a measurable condition tied to a rating level at a defined position instead.

The pack and the licensing regime alongside it

For a typical conversion of a rural building or a new kennel block, the submission usually runs to a Planning Statement, a Design and Access Statement, a noise assessment, a drainage and foul water strategy, a transport statement, a management plan, a lighting assessment where exercise yards are lit, and an ecology appraisal where the building or site could support protected species. The full report index sets out where each of those sits.

Licensing runs in parallel and is not a planning matter. Providing boarding for cats or dogs, including day care, is a licensable activity under the Animal Welfare (Licensing of Activities Involving Animals) (England) Regulations 2018, administered by the same council but by a different team with its own standards for kennel sizes, staffing ratios and record keeping. A licence does not imply planning permission, and permission does not imply a licence. Apply for both, and design the building to the licensing standards from the outset so the floor areas do not have to change between the two applications.

This is general guidance, not legal advice. Check the position with your local planning authority or a qualified professional before relying on it. PlanScope provides AI-assisted draft reports for planning applications. Reports should be reviewed before submission. We do not guarantee planning approval.

Frequently asked questions

Do I need planning permission for dog day care at home?

Possibly. Looking after two or three dogs alongside normal family life may remain within the residential use, but once dog numbers, visitor movements and barking become the dominant activity there is a material change of use. The only formal way to confirm the position is a lawful development certificate under section 191 or 192 of the Town and Country Planning Act 1990.

Which use class are boarding kennels in?

None. Kennels and catteries are sui generis under the Use Classes Order, so there is no permitted change and no prior approval route. A full application is required from any previous use. A later change between overnight boarding and daytime-only care can also need permission where the character of the use alters.

How is barking noise assessed?

Most acousticians use BS 4142:2014+A1:2019 as the framework, with character corrections for the intermittent and tonal nature of barking, alongside predicted internal levels in neighbouring habitable rooms assessed against BS 8233:2014. Background sound monitoring should cover quiet evening and early-morning periods, and source levels and assumed barking rates should be stated openly.

Where does kennel washdown water go?

Not to a surface water drain or a soakaway. Where a foul sewer is available, the discharge usually needs a trade effluent consent from the sewerage undertaker under the Water Industry Act 1991. Without a sewer, the options are a package treatment plant with an environmental permit or a sealed tank emptied under contract.

Is an animal licence the same as planning permission?

No. Providing boarding for cats or dogs, including day care, is licensable under the Animal Welfare (Licensing of Activities Involving Animals) (England) Regulations 2018 and handled by a separate council team with its own kennel size and staffing standards. Neither consent implies the other, so apply for both and design to the licensing standards from the start.

Sources and further reading

kennelsdog day caresui generisnoise impact assessmentchange of usetrade effluent

This article is general guidance about the planning system in England and, where stated, the rest of the UK. It is not legal or professional advice. Check your local planning authority’s validation requirements and take professional advice for your specific site.

More in Which Reports Do I Need

View all →
Which Reports Do I Need7 min read

Reports needed for a stadium floodlight upgrade

Replacing stadium floodlights is rarely maintenance. The documents that decide the application are an obtrusive light assessment for the right environmental zone, an ecology appraisal and a structural check on existing columns.

Read article →
Which Reports Do I Need7 min read

Reports for a commercial glasshouse and packhouse

A commercial glasshouse needs a full application. Supplementary lighting and the visual effect of large glazed spans decide most of these schemes.

Read article →
Which Reports Do I Need7 min read

Reports for a rural wedding barn and marquee field

A farm wedding venue needs noise, access, drainage, lighting and ecology evidence. Dispersal noise is the issue that refuses these applications.

Read article →
Which Reports Do I Need6 min read

Reports for a holiday lodge park in open countryside

A static lodge park in the countryside needs landscape, ecology, drainage, access and lighting evidence as standard. Here is what each document has to prove.

Read article →
Which Reports Do I Need8 min read

Reports for a floating home or houseboat mooring

Planning permission and navigation authority consent run in parallel on a residential mooring, and neither guarantees the other. Here is the evidence base, and the occupancy condition that decides the business case.

Read article →
Which Reports Do I Need8 min read

Reports for a cemetery extension on agricultural land

A burial ground extension is decided by the hydrogeological risk assessment and the soils evidence rather than by an ordinary drainage pack. Here is the order to commission the work and the setbacks to design around.

Read article →