Which Reports Do I Need

Which reports a dog day care and boarding use needs

8 min readBy PlanScope Editorial Team

Kennels and dog day care sit outside the Use Classes Order, so every proposal needs express permission. Barking noise decides most of these applications, and the report bundle follows from it.

A dog day care or boarding use needs full planning permission almost everywhere, because it sits outside the Use Classes Order as a sui generis use, and the dog boarding planning reports that decide the application are driven by barking noise rather than by the usual commercial tests. On a typical rural conversion of a barn or a paddock the council will expect a planning statement, a noise assessment, a transport statement with parking evidence, a waste and drainage position, and often an odour assessment. Licensing runs alongside, not instead.

Get the noise evidence right and the rest usually follows. Get it wrong and no amount of landscaping will save the application.

Use class, sui generis status and licensing alongside planning

Boarding kennels and dog day care are not listed in the Town and Country Planning (Use Classes) Order 1987 as amended, so they are sui generis. The practical consequences are worth stating plainly. There is no permitted change into the use from Class E, from agriculture or from anything else, so you need an express planning permission. And a permission for kennels does not carry a right to shift later into any other use without a fresh application.

Separately, providing day care for dogs or boarding dogs for commercial gain is a licensable activity under the Animal Welfare (Licensing of Activities Involving Animals) (England) Regulations 2018, administered by the same council in most areas but by a different team. The licence looks at animal welfare standards, staffing ratios, isolation facilities and record keeping. It does not consider amenity, highways or landscape, and a licence is no evidence at all that the planning use is acceptable.

Applicants routinely assume one carries the other. Apply for both, and do not let the licensing team's informal view on numbers become the number in your planning application without checking it against the noise evidence.

Agricultural ties cause a second problem on farm sites. Where a holding carries an agricultural occupancy condition or the building was erected under agricultural permitted development, the kennel use may conflict with the existing permission, which needs checking before any money is spent. The same checks apply as for a rural worker's dwelling in open countryside.

Barking noise and why it is assessed differently

Barking is the reason these applications are refused. A Noise Impact Assessment for a kennel is an industrial and commercial sound assessment under BS 4142:2014+A1:2019, and barking attracts the corrections that hurt most. It is impulsive, with a rapid onset and a large change in level. It is often tonal. And it is intermittent, with clear on and off conditions against a quiet rural background.

Those character corrections are additive within limits, so a measured level that looks modest can produce a rating level well above background once the corrections are applied. In a village where the night-time background sits in the low twenties of decibels, the margin above background does the damage rather than the absolute level.

A competent assessment for this use does four things an off-the-shelf noise report does not:

  1. Measures background at the nearest noise-sensitive facade over representative day and night periods, including a weekend.
  2. Uses source data for barking from a comparable facility rather than generic plant levels, and states where it came from.
  3. Models the proposed building envelope, the run positions and any acoustic fence as built, not as hoped for.
  4. Tests a worst case of multiple dogs barking simultaneously, because that is what neighbours experience and what objectors will allege.

Councils normally expect this report to come from a suitably qualified acoustician, and professional review is strongly advised before submission. A draft can set out the structure and the policy framework, but the survey and the judgement behind the corrections have to be a specialist's.

Separation distances and attenuation of outdoor runs

There is no national separation distance between kennels and dwellings. Some authorities carry a figure in a local plan policy or an SPD, so check the adopted plan and the validation checklist rather than working from a number someone quoted at an open day. Where no figure exists, distance is simply one input into the noise assessment.

Design does more than distance on a constrained site. Enclosed buildings with mechanical ventilation and acoustically rated doors remove most of the problem, which is why the strongest applications put all barking indoors and treat outdoor space as supervised exercise with limited hours. Solid acoustic barriers work only where they break the line of sight between dog and receptor, which usually means a close-boarded fence of adequate mass immediately adjacent to the runs rather than a feature fence at the site boundary. Planting attenuates almost nothing and should never be presented as mitigation.

Hours of operation and drop-off traffic

Day care generates a sharper traffic peak than almost any rural use of similar floor area, because every dog arrives and leaves by car inside a narrow window. Two movements per dog per day, concentrated into an hour at each end, is the pattern the highway authority will test.

A Parking Survey and a transport statement should therefore address the drop-off peak specifically: the number of spaces, the turning area for the largest expected vehicle, visibility splays at the access against the measured approach speeds, and whether any vehicle has to reverse onto the highway. On a single track lane with passing places, the capacity question is real and the officer will ask for a passing provision plan.

Hours sit alongside this. Opening before 7am on a residential approach is where highway and amenity objections combine, and a voluntary restriction offered up front reads much better than one imposed after a committee refusal.

Waste, drainage and odour

Dog waste from a commercial kennel is controlled waste, so the duty of care under section 34 of the Environmental Protection Act 1990 applies and the application needs a credible route: a licensed carrier, a storage point away from the boundary, and a collection frequency. Say who takes it and how often.

Surface water from hard-surfaced runs is contaminated run-off and must not go to a soakaway or watercourse without treatment. Washdown water goes to foul. On an unsewered rural site that means a package treatment plant or cesspool with the capacity to take the load, and the same evidence a scheme needs when it is served by a private treatment plant.

Odour becomes a live issue where runs are close to a boundary or where waste storage is exposed. An Odour Assessment is not needed on every kennel application, but where an environmental health officer raises it, an assessment of the source, the pathway and the receptor with a management plan is a far better answer than an assertion that the site will be kept clean.

Ecology where outdoor space is created

Fencing a paddock, laying hardstanding or clearing scrub for runs changes habitat, and that brings biodiversity net gain into play. The statutory 10 per cent gain applies to most planning permissions, with a de minimis exemption for development affecting less than 25 m² of on-site habitat and less than 5 m of linear habitat. Converting an existing yard usually falls below it. Taking a field out of grassland does not.

Where the gain condition applies, the Environment Act 2021 regime expects the statutory metric to be completed by a competent person and the biodiversity gain plan to be approved by the authority. A Biodiversity Net Gain Assessment drafted in advance is a starting point for that person, never a substitute. The same applies to any protected species work, where a licensed ecologist is legally required under the Wildlife and Countryside Act 1981 and the Conservation of Habitats and Species Regulations 2017.

Barn conversions add bats to the list. A preliminary roost assessment can be done at any time of year, but emergence surveys run between May and September, which can add a season to the programme if the application is left to the autumn.

Conditions on animal numbers and hours

Expect the permission, if granted, to be tightly conditioned. The conditions that recur are a maximum number of dogs on site at any time, restricted hours for outdoor access, a requirement that all dogs are housed indoors between fixed night-time hours, approval of a noise management plan with a complaint log, a rating level limit at the nearest residential facade verified by a post-commissioning survey, and no external speakers or tannoy.

Those conditions are enforceable and councils do enforce them after complaints. Build the business plan around the conditioned number rather than the number you hoped for, because a section 73 application to raise it will be judged on the same noise evidence with an objection history attached.

The documents that answer the objections

For a typical day care and boarding proposal on a rural site, the bundle that gets through validation and through consultation is a Planning Statement setting out the policy case and the fallback position, a noise assessment with survey data, a transport statement with parking and visibility evidence, a Waste Management Strategy, a drainage position covering foul and contaminated surface water, a noise and animal management plan, and ecology evidence proportionate to the habitat affected. An odour assessment and a lighting assessment join the list where runs are near a boundary or lit after dark.

This is general guidance, not legal advice. Check the position with your local planning authority or a qualified professional before relying on it.

Browse all 66 report types and start a draft to see which of them your site brings into play.

PlanScope provides AI-assisted draft reports for planning applications. Reports should be reviewed before submission. We do not guarantee planning approval.

Frequently asked questions

What use class is a dog day care or boarding kennel?

Neither is listed in the Town and Country Planning (Use Classes) Order 1987 as amended, so both are sui generis. There is no permitted change into the use from Class E, from agricultural use or from anything else, which means an express grant of planning permission is required even where a suitable building already exists.

Do I need an animal licence as well as planning permission?

Yes, and they are separate. Day care and boarding for dogs for commercial gain is a licensable activity under the Animal Welfare (Licensing of Activities Involving Animals) (England) Regulations 2018. The licence covers welfare standards and staffing, not amenity or highways, so holding one is no evidence that the planning use is acceptable.

Why does barking need a BS 4142 assessment?

Because barking is industrial and commercial sound with the character features the standard penalises most heavily. It is impulsive, frequently tonal and clearly intermittent against a quiet rural background, so the rating level can sit well above background even when the measured level looks modest to a non-specialist.

Is there a minimum distance between kennels and houses?

There is no national separation distance. Some councils carry a figure in an adopted local plan policy or a supplementary planning document, so check the development plan and the local validation list. Where no figure exists, distance is only one input into the noise assessment alongside building envelope and run position.

Does biodiversity net gain apply to a kennel application?

Usually yes, unless the de minimis exemption applies, which covers development affecting less than 25 square metres of on-site habitat and less than 5 metres of linear habitat. Converting an existing hard-surfaced yard often falls below it. Fencing and surfacing part of a field normally does not.

What conditions should I expect on a kennel permission?

A maximum number of dogs on site, restricted hours for outdoor access, dogs housed indoors overnight, an approved noise management plan with a complaint log, a rating level limit at the nearest residential facade with a verification survey, and no external tannoy. Plan the business around the conditioned number.

Sources and further reading

dog boardingkennelssui generisnoise impact assessmentchange of userural planning

This article is general guidance about the planning system in England and, where stated, the rest of the UK. It is not legal or professional advice. Check your local planning authority’s validation requirements and take professional advice for your specific site.

More in Which Reports Do I Need

View all →
Which Reports Do I Need8 min read

Which reports a hand car wash on a forecourt needs

Both a filling station and a car wash are sui generis, so permission is always needed. What decides the application is legacy contamination, trade effluent consent and noise from plant.

Read article →
Which Reports Do I Need9 min read

Which reports a creche inside a hospital site needs

Whether childcare on a hospital campus needs permission turns on the planning unit. Here is the use class position and the play space, transport, air quality and noise evidence that follows.

Read article →
Which Reports Do I Need7 min read

Which reports an agricultural reservoir needs

A farm reservoir has no floor area to measure, so the document list is driven by earthworks, embankment visibility, hydrology and abstraction. Here is the bundle and the order to produce it in.

Read article →
Which Reports Do I Need8 min read

Which reports a cladding remediation application needs

Facade remediation creates no floorspace, so the application turns on appearance, Gateway One fire evidence, bats on the facade and keeping an occupied block liveable.

Read article →
Which Reports Do I Need8 min read

Which reports glamping pods in woodland need

Woodland glamping is decided by trees, not by highways. The buffers, the BS 5837 survey, the no-dig track specification and the ecology seasons that set the programme.

Read article →
Which Reports Do I Need6 min read

Which reports a crematorium on a village edge needs

A crematorium is sui generis, so every proposal is a full application. The reports it needs, in the order to commission them, starting with the 1902 Act distances.

Read article →